You are on page 1of 1

1000

1000
SHOP DRAWING
I
SLIDING DOOR

3000
600 1000 4000
13000
6250 2750 925
16000
14150 925 5500
11000
5500 925
16000
14150 925 1000 600
TOILET 6x6m
1000 600

1000 600
TERAS TERAS
I +0.05

6000

6000
SLIDING DOOR PINTU LIPAT
3000

SLIDING DOOR TOOLS & SLIDING DOOR


TOILET 6x6m
+0.05 12x15m OTHERS 12x15m
6000

6000
OFFICE 4P CRANE 5T (2 HOOK) Saklar Tunggal +150cm
3000

+0.10

BLOCK
ABRASIVE TANK
x8 BLAST SPOT
BLOCK H
Saklar Ganda +150cm CRANE 5T (2 HOOK)

14000
OFFICE 4P

3000
DEHUMIDIFIER MACHINE
A.2 A.4
6000

6000
+0.10

+0.10
POSISI MENYESUAIKAN
PAINTING ROOM
+0.10 WORK PLACE WORK PLACE
Lampu Highbay 100watt
11000

+0.10 +0.10
COMPRESSOR MACHINE

2000
+0.10

BLOCK Lampu Phillips TCW 2x18watt Nama Pekerjaan :


5000

3000
A.1 RECEIVER TANK F.1
H
700

TERAS

TERAS
& OTHERS
Lampu downlight led 12watt
BLASTING MACHINE ROOM

36000
8000
F

5000

14000
HALL 1 BLAST / PAINT ROOM HALL 2 BLAST / PAINT ROOM
+0.10

+0.10 +0.10
6300

CONTAINER PINTU LIPAT


Lampu dinding 2x36watt

2000
E.1
PEKERJAAN RANCANG DAN BANGUN
13000

BLASTING
ROOM E
DUST COLLECTION PLAN

POSISI MENYESUAIKAN POSISI MENYESUAIKAN


Exhaust fan KONSTRUKSI GEDUNG SUB FACTORY

7000
+0.10

5000
+0.10

1500 4200
6000

10000
6000 5000 5000 FASILITAS KAPAL SELAM
1275
+3.10

NYM 2.5 mm conduit HI 20 mm


DEHUMIDIFIER MACHINE (GAMBAR ARSITEKTUR BANGUNAN C)

1000

6000

6000
2150
D

BLOCK

3000
+0.10

7000
PAINTING MATERIAL STORAGE
RUANG PANEL
BLASTING PAINTING TOOL ROOM
6000
6000

UNLOADING SPACE SHELTER PAINTING OUTFITTING SPACE


A.3 +0.10 +0.10
PANEL CONTROL PUSH BUTTON
4960

+0.10 +0.10
+0.10

3000
SLIDING DOOR
6x6m
C
Lokasi Proyek :
600 1000

600 1000
TERAS TERAS

600 1000 4000 5500


13000
3500 4000 4000
16000
8000

56000
5500
11000
5500 4000

+0.10
4000
16000
4000 4000 1000 600

PAINTING ROOM
+0.10
+3.10

1000
1 2 2.A 3 3.A 4 5 6 6.A 7 8

11000
+5.10 D
BENGKEL KAPAL SELAM

3000

COMPRESSOR MACHINE
7000
+5.10
TOILET

6000
SHOWER

+5.05
1000

LOCKER ROOM 20 PERSON

G
MUSHOLLA
+5.30

SHOWER

+5.10

3000
+5.10

SHOWER

4000 4000 4000 4000


C
Diperiksa Oleh :

2000
16000

9 9.A 10 10A 11 11A12 12.A 13

MANAJEMEN KONSTRUKSI &

+0.10
BLOCK KONSULTAN PENGAWAS

5000

3000
A.1 F.1

700

TERAS

TERAS
BLASTING MACHINE ROOM

36000
Teguh Prakoso, ST

8000
F Team Leader
3000

Agus Sujoko, ST

5000
+0.10
TA. Sipil & Struktur Dermaga

TOILET Adji Dwipawarman H, ST, M.T

6300
Tenaga Ahli Arsitektur

Ir. Sanusi Subiyono, ST., MBA

+0.05 CONTAINER Tenaga Ahli MEP

2000
E.1
6000

13000
BLASTING Disusun Oleh :

ROOM E

DUST COLLECTION PLAN


KONTRAKTOR

7000
5000
+0.10
6000

OFFICE 4P
3000

+0.10 Dr. Ir. Koespiadi, MT

1000
Project Manager
D
Ir. Iman Santoso

3000
Site Manager 1

Adjinoto

7000
6000
6000

Site Manager 2
UNLOADING SPACE
+0.10 Sry Widodo, S.T.

3000
Tenaga Ahli Struktur
SLIDING DOOR
AlfatedoYoga Pratama, S.T
6x6m
INST. PENERANGAN OFFICE
SKALA 1:50 4000 C
Tenaga Ahli Arsitektur
600 1000

600 1000
Ir. Achmad Syahid
Tenaga Ahli MEP

NAMA GAMBAR : SKALA :

600 1000 4000 5500 3500 1000 600 INST. PENERANGAN

1 2 13000
INST. PENERANGAN BLOCK A.1
SKALA 1:150
GEDUNG A1 & OFFICE

KODE :
LANTAI 1

NO. LBR :
1:150 & 50

JML. LBR : REV :

1 2 2.A 3 MEP-A-01.02 R0