3500
D
1200
A' 0
ROOF LINE ABOVE GRAVEL BED (RIVER STONE)
1926
1926
1700
LINE OF PARAPET ABOVE LINE of PARAPET ABOVE LINE of PARAPET ABOVE
W-4
1200
A
150mm THK. CHB WALL WITH PLAIN
D-2
D-2 D-2
D-2
D-2 CEMENT PLASTER (PAINT FINISH) SCHEDULE OF FLOOR FINISHES:
3500
MARK DESCRIPTION
CONCRETE FLATFORM
CONCRETE FLATFORM
HANDWASHING
5000
HANDWASHING
FL-1 FL-1 FL-1 FL-1 FL-1
1 FL2 NON-SKID PLAIN CEMENT FINISH
A-1 W/ 6MM GROOVE @ EVERY
100MM O.C.
3504
D 450mm HIGH CONC. BENCH 450mm HIGH CONC. BENCH 450mm HIGH CONC. BENCH 450mm HIGH CONC. BENCH 450mm HIGH CONC. BENCH 450mm HIGH CONC. BENCH
1200
1200
FL-2 S L O P E 1 : 12
RAMP UP FL-2
100mm THK. CHB WALL WITH
50mmØ STAINLESS STEEL PLAIN CEMENT PLASTER
1
A-6 (PAINTED FINISH) 1231
1525 VERTICAL & HORIZONTAL PIPE
300 100mm THK. CHB WALL WITH
HANDRAIL 300 3600 1781
1750 3600 PLAIN CEMENT PLASTER
(PAINTED FINISH)
1 FLOOR PLAN 5
A-4
SCALE 1:100 M
A-2
DESIGN CONCEPT:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: APPROVED: SET NO. SHEET NO.
ARCHITECTURAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS FLOOR PLAN
MODFIEIDSTANDARDDPWHD
-edE
-d CADD BY: SIGNED
CEILING PLAN APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE APPROVED WITH SIGNATURE
BUREAU OF DESIGN ONE(1)STOREY,FIVE(5)CLASSROOM
SCHOOLBUILDING
IRMA BINAG-BERNARDO
ARCHITECT III
BOD
A-2
JOSEPHINE P. ISTURIS LEA N. DELFINADO RAUL C. ASIS LEONOR M. BRIONES
BUILDINGS DIVISION W/TOILET@EACHCLASSROOM CHECKED: SIGNED B 7 20
BONIFACIO DRIVE PORT AREA, MANILA O
( PTO
I N1) MARYLENE CRUZ-SISON CHIEF, BUILDINGS DIVISION OFFICER-IN-CHARGE UNDERSECRETARY SECRETARY, DEPED
ARCHITECT IV