74000

3700 200 3700 200 3700 200 3700 200 3700 200 3700
72000
66000
2500 1400 2500 1400 2500 1400 2500 1400 2500 1400 2500

5500 2500 1400 2500 1400 2500 1400 2500 1400 2500 1400 2500 5500 3000 5500 2500 5.5000 3000 5500 2500 5500

Tow
er Lam
p
Mixi
ng

Gen
Plan

set
t

WC
Kap Gud
asita ang
s = AN
60,0
00
Kg
Kap ang
Gud
. = Dina
5,00
B

0 Kg
mit
Kap ang Deto
Gud
.=
10,0 nato
00
Biji
r

Pos
Pan
tau
LOKASI
GUDANG HANDAK
Gudang Detonator No. 2

6000

8000
3500
(Kapasitas 5.000 Bijih)

2500
A
Tampak Depan

3000
Skala 1:100

2500
Tower Lamp 9971500
Denah Gudang Anfo
Skala 1:100
Gudang Detonator No. 1
APAR NO. 1 NO. 2 NO. 4 NO. 5 NO. 6
NO. 3 (Kapasitas 5.000 Bijih)
Lighting
PETA SITUASI

7000
Conductor

620
40000
32000
Gudang Amonium Nitrat Gudang Dinamit

38000
(Kapasitas 60.000 Kg) (Kapasitas 5.000 Kg) Tumpukan
Anfo
SKALA 1:5000

2500
Pallets
HIDRAN

3000

200
2500
Potongan Gudang A-A
Skala 1:100

Tampak Samping Kanan

10500
Skala 1:100
Lighting
Conductor

620
POS
SECURITY

2500
200
Fence
6000 Wooden Sleeper 200 x 200 x 400
Tampak Samping Kiri Potongan Gudang B-B (Typical)
Skala 1:100
Skala 1:100

MIXING PLANT

8 Tumpukan x 10 Karung x 5 Jajar = 400 Karung @25Kg


400 Karung x 25 Kg = 10.000 Kg

6 Gudang Anfo x 10.000 Kg = 60.000 Kg

LAY OUT PLAN


SKALA 1:200
3D Susunan Anfo
Skala NTS

3700 3700
2500 2500
4000

Ventilation
2000

A A'
Rak
5500 2500 1400 2500 1400 2500 1400 2500 1400 2500 1400 2500 5500 3000 5500 2500 5.4993 3000 5500 2500 5500
66000

6000

6000
72000 Pallets Ventilation Ventilation

8000

8000
74000

Door Lock Door Lock


PENAMPANG A - A'
Skala 1:200 Door

Tampak Depan Tampak Depan


Skala 1:100 Skala 1:100
4000
2000

B B' Denah Gudang Dinamit Lighting


Denah Gudang Detonator Lighting
Conductor Conductor
3000 5500 6000 10000 10500 3000 Skala 1:100 Skala 1:100
32000
38000
40000

620

620
PENAMPANG B - B'
Lighting Dus @20 Kg Lighting
Skala 1:200
Conductor Conductor

2500

2500
Pallets Pallets

200

200
2500 2500

Potongan Gudang A-A Potongan Gudang A-A


Skala 1:100 Skala 1:100
3700 15 3000

800 1000 Tampak Samping Kanan Tampak Samping Kanan


2500 10 Skala 1:100 Skala 1:100
498

Lighting Lighting
Conductor Conductor

70
620

620
2000

2500

2500
Detail Detail Gembok
Kuda-kuda Atap Skala 1:50
Detail Ventilasi 200 200
Skala 1:50
Bund Wall (Typical) Wooden Sleeper 200 x 200 x 400 Wooden Sleeper
Skala 1:50
Skala 1:50 Tampak Samping Kiri
6000
(Typical) Tampak Samping Kiri
6000

Potongan Gudang B-B


PT. INSANI BARAPERKASA
Skala 1:100 Potongan Gudang B-B Skala 1:100
Skala 1:100 Skala 1:100

GAMBAR KONSTRUKSI DAN PETA SITUASI


2300 5 x 6 x 8 Jajar Box = 240 box 33 Box x 150 Pcs Detonator = 4.950 Pcs
1 Tumpukan x 10 Box = 10 box 1 Box x 50 Pcs = 50 Pcs
GUDANG BAHAN PELEDAK
550
Total 250 box Total 5.000 Pcs/Gudang DI DESA SUKADAMAI, KEC. MUARA BADAK, KAB. KUKAR, PROV. KALIMANTAN TIMUR
KAPASITAS GUDANG AMONIUM NITRAT 60.000 Kg, DINAMIT 5000 Kg, DAN DETONATOR 10.000 Pcs
250 box x 20 Kg = 5.000 Kg 2 Gudang Detonator x 5.000 Pcs = 10.000 Pcs
2200
Tumpukan AN
20
2400

14
Pallets
10
20

3D Susunan Dinamit 3D Susunan Detonator


Skala NTS Skala NTS

DIGAMBAR DIPERIKSA DISETUJUI


Detail Pintu dan Gembok
Skala 1:50 Detail Pallet
Skala 1:50

Fachri Abda'u R. S. Ars Slamet Santoso Dr. Ir. Agus Wiramsya Oscar
M.Sc., M.T.