DTS COMMENTS / RESPONSE SHEET

Attachment to DTS no. 0xxx


CSD Ref. : C0308 RN 7660 U 4032 Rev. A
Title : DETAIL DRAWING OF PRECAST CONCRETE TROUGH –CONFLICT POINT # NL-2 (132kV OHL) – ETIHAD WE
Project : C0308 ETIHAD RAIL STAGE 2 PROJECT – PACKAGE 2D

SL GOPA INTEC Comments dt. 30 Dec 2022 on CRCC Comments dt. 30 Dec 2022 on
NCC Clarification / Response
No. DTS REF.0216 dt. 15 Dec 2022 Rev 0 DTS REF.0216 dt. 15 Dec 2022 Rev 0

Please note that the M/s. Etihad WE standard


Structural design calculations along with the
drawings are followed as per previous project
1. recommendations from geotechnical consultants shall
approved drawings, the same is attached for
be submitted for our review.
reference in Attachment-I.
Lifting hook design shall be verified for the demolding
2. Noted & complied. Refer attachment-IV.
strength mentioned in the drawings.
Structural design calculations and structural drawings
Please refer previous project approval in
3. shall be prepared and submitted by approved civil
Attachment-I.
design consultant.
The information related to preparation works such as
blinding, water proofing, compaction or any other Please note that we have referred nearby
4.
works recommended by geotechnical consultants shall Geotechnical Report recommendation.
be provided.
Weight of the precast cover shall be limited within the
5. Noted & confirmed.
recommendations given in the EWE specifications.
Previous concrete mix design enclosed is noted, Please note that project approved mix design
6.
however it shall be verified with geotechnical report. shall be used for precast concrete trough.

Page 1 of 1