GENERAL CHECKLIST

Project Effluent Treatment Plant (ETP) &Hazardous Waste Job No.: PL/632
Handling Facilities (Package-2)
Document NO.: HRRL-632-ETP-CCAL-203A Rev. No.: R4
Document Title: Pile Load Calculations of OWS Tank
SI. No. PMC Requirement Contractor's Remarks
Response
1 The submission is as per submission schedule as Yes
per approved DC I.
2 The submission is as per submission sequence as per Yes
approved DCI.
3 Basic documents prepared by the contractor (e.g. design Yes
philosophy, specifications, standards, general notes, etc.)
are alreadv approved.
4 Bulk MTO has been submitted. NA
5 All the referenced input (e.g. geotechnical No Equipment data sheet
recommendations, architectural drawing, equipment not available. All forces
layout, piping general arrangement drawing (GAD), and moments are
equipment data sheet, vendor drawing, etc.) as applicable mentined in equipment
have been reviewed by the concerned Owner's specialist GA drawing itself.
in approval/ review Code-2 or Code-1 and are available in
the DC1M on or before the date of submission of
structural design/ drawings.
6 The design calculations being submitted herewith Yes
are complete in all respects, thoroughly checked and
confirm to approved engineering design basis, relevant
approved input documents and applicable codes &
standards, stamped APPROVED FOR
CONSTRUCTION, and signed APPROVED by the
Contractor's own responsible civil/ structural graduate
(minimum) engineer (irrespective of the fact that the
same are prepared in the Contractor's own design office
or by an approved agency/ sub-contractor).
7 The drawings being submitted herewith are complete in Yes
all respects, thoroughly checked and confirm to approved
design calculations, approved general arrangement,
stamped APPROVED FOR CONSTRUCTION, and
signed APPROVED by the Contractor's own responsible
civil/ structural graduate (minimum) engineer
(irrespective of the fact that the same are prepared in the
Contractor's own design office or by an approved agency/
sub-contractor).
8 The documents/ drawing being submitted are complete Yes
with respect to the whole structure.
9 In case this submission is for drawings only, the related No Both design and
analysis & design have already been submitted. drawings are
submitting
simultaneously.
10 Structure-wise quantity statements (showing No
anticipated, released and balance quantities of concrete,
structural steel and piles) are updated & submitted.
11 In case this submission is of record category document/ No
drawing, similar review category documents/ drawings
have already been submitted.
13 In case this submission is of record category document/ No
drawing, the submitted document/ drawing
incorporates comments on the similar review
category document/ drawing.
14. The accuracy/ correctness of all designs and drawings Yes
shall be the sole responsibility of the Contractor and any
delay/ loss/ damage to the Owner in respect of any
mistake/ discrepancy/ anomaly in such designs and
drawings shall be entirely borne by the Contractor.
Review by Owner/ owner's representative shall not
relieve the Contractor of his responsibility for correct
design and execution of the works

Date: 04.04.2020 Name & Signature