Comments disposition form

Title: CDF – DESIGN OF VANITY AND BASE SUPPORT FRAME


Reviewing Department: Arab Engineering Bureau (AEB)

Document No & Revision. TDH-0500-SS-RP-0107 –Rev 01 Disposition Department: Gulf Contracting Company (GCC)

Review date: 09/11/2022 Disposition date: 23/07/2022


Serial Status Comments Dispositions Status/Remarks
Number A,B,C or D
Discipline:
Calculation to be signed and stamped in all pages by the Noted, we will submit the stamp
Contractor's qualified professional/structural engineer who is copy
registered in Qatar
1. Code-C Open
Rev. 1
Structural design by the contractor is not acceptable, third party is
requested to review and stamp the report
Please add some drawings for the vanity with full dimensions for Noted and details add in the drawing
clarity
2. Code-B Closed
Rev. 1
Drawings added to the report and comment closed

Document Reference: Page 1 of 4


As shown in many shop drawings (like TDH-0500-INT-DT-PL-9412-
001), the width is 600mm and the top plate is granite, please add a
section for the components with weight
3. Code-B Open
Rev. 1
Rev.1 : Noted and updated
OK, but the beam length to be amended to 600mm to match the
width
Many drawings show a side fixation to the back wall, please explain
whether this is the case or it is different case, please summarize all
possible typical supporting cases Noted, it is applicable at dry wall partition area
4. Code-B Closed
only where wall fixation not possible
Rev. 1
Noted, comment closed
It is expected that the post is closed to the back wall, therefore, the It is expected that the post is closed to the back
bottom connection will be eccentric wall, therefore, the bottom connection will be
eccentric.
5. Code-B Closed
Rev. 1
Hilti connection to be amended to eccentric, however and for
the small eccentricity, the comment can be closed.
Ally concentrated live load as a separate load case at the worst Rev.1 : the maximum spacing of frame is place
position (the free end of the steel beam). d at 700 mm c/c and accordingly design is
done.
6. Code-B Rev. 1 Open
Noted, but as per attached drawing 9354, the spacing between
frames is 1.37m and the live load is 1.37X2=2.74 KN/m’ and
DL=1.37 KN/m’
Always don't provide free hand sketches

Rev. 1 Rev.1 Noted and Updated


7. Code-B Open
Drawings added but please add a sketch for the frame showing
the tubes sections, base plate thickness, weld size connection
details for clarity
All steel elements located at wet areas to be coated with anti-
8. Code-B Noted Closed
corrosion coating, subject to material approval

Document Reference: Page 2 of 4


Rev. 1
Ok, will be addressed in shop drawings and other relevant
submittals and comment closed here

Reviewer: Ayman Zaky Signature: Date: Select date.

Approver: Signature: Date: Select date.


Adnan Kopic – Resident Engineer

Document Status: A = Approved B = Approved with Comments C = Revise and Resubmit


D = Rejected

Document Reference: Page 3 of 4