A Main Cable Route Plan drawing has already been added under Engineering
3 Pg 1 please add also main cable route plan drawing as reference. reference CLOSED
drawing.
Please provide the protection such as waterproof material for watertight purpose. The water stop is applied at construction joint of manhole and the waterproofing
membrance is especially applied at a connection point between manhole & EDB. So
4 Pg 1 Consortium confirms that the watertight design is already considered. Closed
Jawa 9&10 Coal Fired Steam Power Plant_Design Review Comment Sheet
From : HK Document Controller
To : IRT Mr. Steve Adrianto Comment Sheet Document No : J910-YK09-P0UCZ-165201
cc : TEPSCO Mr. Kubota Hiroshi
Dwg Title : Electrical Cable Trench and Duct Bank Details
Dwg No : J910-YK09-P0UCZ-165201
Purpose : FA
Review Category
A = Approved
B = Approved with comments, forward final document
C = Not Approved B
I = Accepted for reference (For information only)
IB = Accepted for reference with comment (For information only)
No. Rev. Sheet/ Page/ Sect. O/E Comments Consortium Response Status
1 Please re-submit this drawing if any changing and still Not Approved for document Noted and updated accordingly.
Pg 1 J910-XW03-P0UCZ-165200 Electrical Cable Trench and Duct Bank Design Closed
Calculation Report
B
please add calculation document for reference also. Noted and incorporated.
2 Pg 1 CLOSED