Construction of Mass Rapid Transit Jakarta

Contract Package CP101

Lebak Bulus Station


Structural Design
(Foundations)
Addendum Report
(Design of Foundations for Escalator L1E02 and Lift L1L01 & L1L02 – Post

Station Enlargement)

TWJO-1-TCD-ST1-0004-Rev E-A6

TOKYU-WIKA JOINT OPERATION

When viewed in ACONEX this document is controlled, this means:


1. Distribution is centralized - in this case through ACONEX. Any improvement suggestions should be
forwarded to the Quality Manager.
2. Each copy is issued to a particular person or organization.
3. Copy holders will be automatically issued with any amendments through ACONEX.
4. Photocopies of this document are uncontrolled and users should confirm validity in ACONEX prior to
use.
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

DOCUMENT/DRAWING TECHNICAL
VERIFICATION AND REVISION RECORD

PROJECT NAME Jakarta MRT

PROJECT NO. AECOM 60313051 FILE 1800

*DOC/DWG NO. AECOM-1-TCD-ST1-0004 DATE OF FIRST ISSUE 17-10-2014

*DOC/DWG TITLE Lebak Bulus Station – Structural Design - Foundations


ISSUE/REV.

APPROVED
PREPARED
/DESIGNED

CHECKED
DATE OF
REV. No.

DESCRIPTION

- 17-10- Initial Submission SG NB IDJ


2014

1 12-12- Change in column location at grade SG NB IDJ


2014

2 29-12- Revised as per JO & 3PDV comments SG NB IDJ


2014

3 26-03- Revised as per latest architecture and utilities SG NB IDJ


2015

4 15-04- Revised as per TWJO’s comments SG NB IDJ


2015

5 10-09- SG NB JC
2015 Revised Gridline B Foundation for Enlarged Station

6 06-10- SG NB JC
Revised Gridline B Foundation as per Design
2015

7 20-10- Revised Gridline A Foundation for Enlarged Station SG NB JC


2015

8 09-11- Revised Gridline A Foundation for 1.2m Water Pipe & Gridline A1/A2 SG NB JC
2015 Foundation for Enlarged Station

8- 16-11- Addendum Report – To Capture Latest Utility Details at C-39 SG NB JC


A1 2015

9 18-11- Revised Gridline C1 Foundation for Enlarged Station SG NB JC


2015

9- 17-03- Revised Foundation for Staircases L1S02 & L1S04 due to station SG NB JC
A1 2016 enlargement

9- 23-03- Revised Foundation for Staircases L1SO1 due to station enlargement SG NB JC


A2 2016

9- 31-03- Revised Foundation for Staircases L1SO3 & L1S05 due to station SG NB JC
A3 2016 enlargement

9- 08-04- Revised Foundation for Escalator L1E02, Lift L1L01 & Lift L1L02 due to SG NB JC
A4 2016 station enlargement

TWJO-1-TCD-ST1-0004-Rev A-A6
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

CONTENTS

1. INTRODUCTION .............................................................................................................4
1.1 Scope of Report .......................................................................................................4
1.2 Design Package Affiliation ......................................................................................4
2. DESCRIPTION OF ASSESSMENT.................................................................................5
2.1 Methodology ............................................................................................................5
3. CONCLUSION ................................................................................................................5

List of Tables
Table 1 – Design Package Affiliation ......................................................................................4

TWJO-1-TCD-ST1-0004-Rev A-A6
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

1. INTRODUCTION
This report shall be read in conjunction with the previously submitted LBS
Foundation Design Report AECOM-1-TCD-ST1-0004 Rev9.
The intent of this Addendum Report is to design of Piles & Pile Caps for Escalator
L1E02 and revised design of Lift piles and pile caps for L1L01 & L1L02 due to
enlargement of station.

1.1 Scope of Report

The technical design of Lebak Bulus Station design had been completed and the
design approved. However, due to unforeseen circumstances in which the authority
now requires the road underneath the station to be widened, the column positions
have been shifted to the sidewalk of the widened road, resulting in an enlarged
station. Row of columns at gridline C has been moved to gridline C1, resulting in a
span change from grid line B from 9.50m to 13.50m. Columns along gridline A1
have also been shifted to gridline A2 to cater for accesses.

The revised design of piles and pile caps for Lift L1L01 and L1L02 and design of
piles and pile caps for Escalator L1L02 of Lebak Bulus Station are covered in this
report.

1.2 Design Package Affiliation

The following table shows the relationship of this package to other design packages
of Lebak Bulus Station. Design packages of CP101 and CP102 are divided into
segments in accordance with Appendix 22 of Employer’s Requirement.

Table 1 – Design Package Affiliation

Design Design Design Package


Design Package Description
Segment Elements Number
Civil & TWJO-1-TCD-ST1- Lebak Bulus Station - Structural Design
Structures 0009 (Station Superstructure & Entrances)

LEBAK TWJO-1-TCD-ST1- Lebak Bulus Station - Structural Design


Geotechnical
BULUS 0004 (Foundations)
STATION Addendum
Addendum for Design of Foundation for
for TWJO-1-TCD-ST1-
L1L01,L1L02 & L1E02– Post Station
L1L01,L1L02 0004 Rev9 A4
Enlargement
& L1E02

TWJO-1-TCD-ST1-0004-Rev A-A6 PAGE 4/ 5


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

2. DESCRIPTION OF ASSESSMENT

2.1 Methodology

Structural elements of the station were modeled with their true material and section
properties. For the normal loading conditions a linear-elastic model was used to
assess the effect of the forces.
The lateral soil interaction with the pile structure is modelled as lateral soil springs.
The first soil spring was modelled at 1m below the pile cap bottom & 50% of the
spring value was applied at pile cap bottom node to account for the passive earth
resistance of the pile cap.
Under Seismic loading conditions, a linear-elastic dynamic analysis was used to
assess the response of the structure to the response spectrum under Operating
Design Earthquake (ODE) and Maximum Design Earthquake (MDE). Directional
combinations of the earthquake motions were taken into account in accordance with
EN1998-2 requirements.

3. CONCLUSION
The analysis model has been updated as per the latest set of architectural drawings
and the design of Foundation for Escalator L1E02 and revised design of Foundation
for Lift L1L01 & L1L02has been carried out.

The revised reinforcement detailing has been covered in the following enclosed
drawings:

· 1/STN/STR/3016 – Pile Layout (Sheet 1 of 4)


· 1/STN/STR/3017 – Pile Layout (Sheet 2 of 4)
· 1/STN/STR/3002 – Column Layout (Sheet 2 of 2)
· 1/STN/STR/3022 – Pile Reinforcement (Sheet 2 of 5)
· 1/STN/STR/3023 – Pile Reinforcement (Sheet 3 of 5)
· 1/STN/STR/3028 – Pile Cap Reinforcement (Sheet 3 of 10)
· 1/STN/STR/3030 – Pile Cap Reinforcement (Sheet 5 of 10)

TWJO-1-TCD-ST1-0004-Rev A-A6 PAGE 5/ 5


TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Appendix A

PILE DESIGN CALCULATIONS

TWJO-1-TCD-ST1-0004-Rev A-A6 Appendix A


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMNS C105 for L1E02


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

PILE DESIGN FOR COLUMNS C105 for L1E02

Grade of Concrete = C32/40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38149 1001 1DL36731
+ 1SIDL +856.448
1CL + 1PLA -23.062
+ 1.1TLA + 1.1BTA
0 0 -0.001 0.723
Min Fx 38149 1001 1DL36731
+ 1SIDL +856.448
1CL + 1PLA -23.062
+ 1.1TLA + 1.1BTA
0 0 -0.001 0.723
Max Fy 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Min Fy 38166 1001 1DL36730
+ 1SIDL +856.448
1CL + 1PLA -45.325
+ 1.1TLA + 1.1BTA
0 0 -0.001 -111.365
Max Fz 38152 1001 1DL36734
+ 1SIDL +856.448
1CL + 1PLA +-8.903
1.1TLA + 1.1BTA
0 0 -0.001 54.02
Min Fz 38172 1001 1DL36753
+ 1SIDL +856.448
1CL + 1PLA + 0.749
1.1TLA + 1.1BTA
0 0 0 -2.766
Max Mx 38149 1001 1DL36731
+ 1SIDL +856.448
1CL + 1PLA -23.062
+ 1.1TLA + 1.1BTA
0 0 -0.001 0.723
Min Mx 38149 1001 1DL36731
+ 1SIDL +856.448
1CL + 1PLA -23.062
+ 1.1TLA + 1.1BTA
0 0 -0.001 0.723
Max My 38164 1001 1DL36747
+ 1SIDL +856.448
1CL + 1PLA + 5.803
1.1TLA + 1.1BTA
0 0 0 10.049
Min My 38166 1001 1DL36730
+ 1SIDL +856.448
1CL + 1PLA -45.325
+ 1.1TLA + 1.1BTA
0 0 -0.001 -111.365
Max Mz 38155 1001 1DL36738
+ 1SIDL +856.448
1CL + 1PLA +-1.624
1.1TLA + 1.1BTA
0 0 0 73.772
Min Mz 38166 1001 1DL36730
+ 1SIDL +856.448
1CL + 1PLA -45.325
+ 1.1TLA + 1.1BTA
0 0 -0.001 -111.365

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38149 1039 1DL36731
+ 1SIDL +1160.47
0.3CL + 0.3PLA
-9.185
+ 0.3TLA11.626
+ 0.3BTA13.483
+ 0.3SLX305.681
+ 1SLY + 0.3SLZ
116.81
Min Fx 38149 1023 1DL36732
+ 1SIDL +513.909
0.3SLX + 1SLY
-33.226
+ 0.3SLZ -11.626 -13.483 -295.776 -103.155
Max Fy 38166 1007 1DL36730
+ 1SIDL 1062.152
+ 1SLX + 0.3SLY
89.224
+ 0.3SLZ 28.941 13.483 269.996 29.201
Min Fy 38166 1031 1DL36749
+ 1SIDL +612.226
0.3CL + 0.3PLA
-172.811
+ 0.3TLA-28.94
+ 0.3BTA
-13.483
+ 1SLX +-295.498
0.3SLY + 0.3SLZ
-292.882
Max Fz 38166 1015 1DL36730
+ 1SIDL +960.309
0.3SLX + 0.3SLY
-1.882
+ 1SLZ 96.468 44.944 899.99 -60.33
Min Fz 38166 1015 1DL36749
+ 1SIDL +707.273
0.3SLX + 0.3SLY
-80.459
+ 1SLZ -96.468 -44.944 -984.99 -129.267
Max Mx 38149 1015 1DL36731
+ 1SIDL +960.309
0.3SLX + 0.3SLY
-8.962
+ 1SLZ 38.753 44.944 1018.938 115.221
Min Mx 38149 1015 1DL36732
+ 1SIDL +707.273
0.3SLX + 0.3SLY
-32.794
+ 1SLZ -38.753 -44.944 -985.919 -101.745
Max My 38167 1015 1DL36750
+ 1SIDL +960.309
0.3SLX + 0.3SLY
-7.435
+ 1SLZ 25.653 44.944 1021.465 70.762
Min My 38168 1015 1DL36750
+ 1SIDL +707.273
0.3SLX + 0.3SLY
-62.059
+ 1SLZ -49.528 -44.944 -1021.467 -121.251
Max Mz 38152 1031 1DL36734
+ 1SIDL +1068.95
0.3CL + 0.3PLA
6.115
+ 0.3TLA25.463
+ 0.3BTA13.483
+ 1SLX +257.187
0.3SLY + 0.3SLZ
479.389
Min Mz 38150 1007 1DL36733
+ 1SIDL +605.429
1SLX + 0.3SLY
-35.779
+ 0.3SLZ -17.54 -13.483 -278.971 -390.11
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38149 2139 1.0DL
36731
+ 1.0SIDL
1221.182
+ 0.3CL + 0.3PLA
-5.579 + 0.3TLA
14.94
+ 0.3BTA
17.641
+ 0.3SLX
399.912
+ 1SLY +151.806
0.3SLZ
Min Fx 38149 2123 1.0DL
36732
+ 1.0SIDL
453.196
+ 0.3SLX +-36.832
1SLY + 0.3SLZ
-14.939 -17.641 -386.998 -141.383
Max Fy 38166 2107 1.0DL
36730
+ 1.0SIDL
1120.867
+1SLX + 0.3SLY
128.961 + 0.3SLZ
37.614 17.641 352.744 63.954
Min Fy 38166 2131 1.0DL
36749
+ 1.0SIDL
553.512
+ 0.3CL -212.548
+ 0.3PLA + 0.3TLA
-37.614
+ 0.3BTA
-17.641
+ 1SLX
-386.363
+ 0.3SLY -362.319
+ 0.3SLZ
Max Fz 38155 2115 1.0DL
36737
+ 1.0SIDL
987.868
+ 0.3SLX +11.284
0.3SLY + 1SLZ
126.009 58.805 769.447 210.104
Min Fz 38155 2115 1.0DL
36738
+ 1.0SIDL
679.713
+ 0.3SLX +-14.056
0.3SLY + 1SLZ
-126.009 -58.805 -644.414 -64.579
Max Mx 38149 2115 1.0DL
36731
+ 1.0SIDL
987.868
+ 0.3SLX + -5.429
0.3SLY + 1SLZ
49.799 58.805 1333.042 149.903
Min Mx 38149 2147 1.0DL
36732
+ 1.0SIDL686.51
+ 0.3CL +-36.982
0.3PLA + 0.3TLA
-49.798
+ 0.3BTA
-58.805
+ 0.3SLX
-1289.991
+ 0.3SLY-139.33
+ 1SLZ
Max My 38167 2115 1.0DL
36750
+ 1.0SIDL
987.868
+ 0.3SLX + 0.3SLY
-1.6 + 1SLZ
31.653 58.805 1336.073 99.891
Min My 38168 2115 1.0DL
36750
+ 1.0SIDL
679.713
+ 0.3SLX +-70.689
0.3SLY + 1SLZ
-63.515 -58.805 -1336.076 -150.38
Max Mz 38152 2131 1.0DL
36734
+ 1.0SIDL
1127.664
+ 0.3CL + 0.3PLA
10.204 + 0.3TLA
33.277
+ 0.3BTA
17.641
+ 1SLX
336.538
+ 0.3SLY +610.762
0.3SLZ
Min Mz 38150 2107 1.0DL
36733
+ 1.0SIDL
546.715
+1SLX + 0.3SLY
-41.43+ 0.3SLZ
-22.823 -17.641 -365.033 -521.432

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


29 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 679.7 1345 1554 0.865 OK
Minima 1121 358.5 1661 0.216 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 87.4 OK
Minima -247.7 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 2.049 OK 12.72 OK
Minima -0.03441 OK 1.666 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 14.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Min Fx 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Max Fy 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Min Fy 38176 1001 1DL36757
+ 1SIDL +856.448
1CL + 1PLA + -0.86
1.1TLA + 1.1BTA
0 0 0 -2.01
Max Fz 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Min Fz 38172 1001 1DL36753
+ 1SIDL +856.448
1CL + 1PLA + 0.749
1.1TLA + 1.1BTA
0 0 0 -2.766
Max Mx 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Min Mx 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Max My 38164 1001 1DL36747
+ 1SIDL +856.448
1CL + 1PLA + 5.803
1.1TLA + 1.1BTA
0 0 0 10.049
Min My 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Max Mz 38160 1001 1DL36742
+ 1SIDL +856.448
1CL + 1PLA + 8.871
1.1TLA + 1.1BTA
0 0 0 48.444
Min Mz 38172 1001 1DL36754
+ 1SIDL +856.448
1CL + 1PLA + 0.749
1.1TLA + 1.1BTA
0 0 0 -3.515

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38160 1039 1DL36742
+ 1SIDL +1160.47
0.3CL + 0.3PLA
20.408
+ 0.3TLA +17.5
0.3BTA13.483
+ 0.3SLX +49.822
1SLY + 0.3SLZ
94.938
Min Fx 38160 1023 1DL36743
+ 1SIDL +513.909
0.3SLX + 1SLY-3.987
+ 0.3SLZ -17.5 -13.483 -32.525 -1.537
Max Fy 38160 1031 1DL36742
+ 1SIDL +1068.95
0.3CL + 0.3PLA
48.433
+ 0.3TLA +17.5
0.3BTA13.483
+ 1SLX + 0.3SLY
49.822+ 0.3SLZ
208.47
Min Fy 38160 1007 1DL36743
+ 1SIDL +605.429
1SLX + 0.3SLY
-32.011
+ 0.3SLZ -17.5 -13.483 -32.525 -87.102
Max Fz 38160 1015 1DL36742
+ 1SIDL +960.309
0.3SLX + 0.3SLY
20.137
+ 1SLZ 58.333 44.944 166.072 93.137
Min Fz 38160 1015 1DL36743
+ 1SIDL +707.273
0.3SLX + 0.3SLY
-3.949
+ 1SLZ -58.333 -44.944 -108.417 -1.087
Max Mx 38160 1015 1DL36742
+ 1SIDL +960.309
0.3SLX + 0.3SLY
20.137
+ 1SLZ 58.333 44.944 166.072 93.137
Min Mx 38160 1015 1DL36743
+ 1SIDL +707.273
0.3SLX + 0.3SLY
-3.949
+ 1SLZ -58.333 -44.944 -108.417 -1.087
Max My 38160 1015 1DL36742
+ 1SIDL +960.309
0.3SLX + 0.3SLY
20.137
+ 1SLZ 58.333 44.944 166.072 93.137
Min My 38160 1020 1DL36742
+ 1SIDL - 873.014
0.3SLX + 0.3SLY
-3.916
- 1SLZ -58.333 -44.944 -166.072 -4.594
Max Mz 38160 1031 1DL36742
+ 1SIDL +1068.95
0.3CL + 0.3PLA
48.433
+ 0.3TLA +17.5
0.3BTA13.483
+ 1SLX + 0.3SLY
49.822+ 0.3SLZ
208.47
Min Mz 38160 1010 1DL36742
+ 1SIDL - 605.429
1SLX - 0.3SLY
-32.011
+ 0.3SLZ 17.5 13.483 49.822 -119.03
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38160 2139 1.0DL
36742
+ 1.0SIDL
1221.182
+ 0.3CL + 0.3PLA
24.104 + 0.3TLA
22.893
+ 0.3BTA
17.641
+ 0.3SLX
65.061
+ 1SLY +109.998
0.3SLZ
Min Fx 38160 2123 1.0DL
36743
+ 1.0SIDL
453.196
+ 0.3SLX + -7.682
1SLY + 0.3SLZ
-22.893 -17.641 -42.405 -12.905
Max Fy 38160 2131 1.0DL
36742
+ 1.0SIDL
1127.664
+ 0.3CL + 0.3PLA
60.723 + 0.3TLA
22.893
+ 0.3BTA
17.641
+ 1SLX65.061
+ 0.3SLY +258.308
0.3SLZ
Min Fy 38160 2107 1.0DL
36743
+ 1.0SIDL
546.715
+1SLX + 0.3SLY
-44.302+ 0.3SLZ
-22.893 -17.641 -42.405 -124.664
Max Fz 38160 2115 1.0DL
36742
+ 1.0SIDL
987.868
+ 0.3SLX +23.826
0.3SLY + 1SLZ
76.311 58.805 216.87 108.113
Min Fz 38160 2115 1.0DL
36743
+ 1.0SIDL
679.713
+ 0.3SLX + -7.638
0.3SLY + 1SLZ
-76.311 -58.805 -141.351 -12.379
Max Mx 38160 2115 1.0DL
36742
+ 1.0SIDL
987.868
+ 0.3SLX +23.826
0.3SLY + 1SLZ
76.311 58.805 216.87 108.113
Min Mx 38160 2147 1.0DL
36743
+ 1.0SIDL686.51
+ 0.3CL + 0.3PLA
-7.405 + 0.3TLA
-76.311
+ 0.3BTA
-58.805
+ 0.3SLX
-141.351
+ 0.3SLY-11.297
+ 1SLZ
Max My 38160 2115 1.0DL
36742
+ 1.0SIDL
987.868
+ 0.3SLX +23.826
0.3SLY + 1SLZ
76.311 58.805 216.87 108.113
Min My 38160 2120 1.0DL
36742
+ 1.0SIDL873.87
- 0.3SLX + 0.3SLY
-7.6 - 1SLZ
-76.311 -58.805 -216.87 -19.499
Max Mz 38160 2131 1.0DL
36742
+ 1.0SIDL
1127.664
+ 0.3CL + 0.3PLA
60.723 + 0.3TLA
22.893
+ 0.3BTA
17.641
+ 1SLX65.061
+ 0.3SLY +258.308
0.3SLZ
Min Mz 38160 2110 1.0DL
36742
+ 1.0SIDL
546.715
- 1SLX - 0.3SLY
-44.302
+ 0.3SLZ22.893 17.641 65.061 -168.868

ODE MDE
Maximum Tension Force (kN) 513.91 453.196
Skin Friction (kN) 959.33
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1128 266.4 874.5 0.305 OK
Minima 0 44.34 495.3 0.090 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 20.97 OK
Minima -6.915 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 1.545 OK 10.2 OK
Minima 0.5822 OK 4.997 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7595 m
Hence de = 0.742 m and dv = 0.668 m
Horizontal resultant shear force at the section, Vu = 216 kN
Corresponding axial compressive force, N = 554 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 10568 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0053 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.792 %
Horizontal shear force, Vu = 216 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 323.33 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.683 Mpa
= 683 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 635.693 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.04
Modified shear strength of concrete (n s vc ) = 658.09 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -223.48 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.03 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 210 mm
OK
Shear reinforcement 13mm dia @ 210mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

PILE DESIGN FOR PG1K for L1E02


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

PILE DESIGN FOR PG1K for L1E02

Grade of Concrete = C32/40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.0 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38252 1001 1DL36839
+ 1SIDL +924.663
1CL + 1PLA +43.944
1.1TLA + 1.1BTA
0 0 0 239.846
Min Fx 38252 1001 1DL36839
+ 1SIDL +924.663
1CL + 1PLA +43.944
1.1TLA + 1.1BTA
0 0 0 239.846
Max Fy 38269 1001 1DL36838
+ 1SIDL +924.663
1CL + 1PLA + 50.07
1.1TLA + 1.1BTA
0 0 0 385.875
Min Fy 38268 1001 1DL36855
+ 1SIDL +924.663
1CL + 1PLA + -4.95
1.1TLA + 1.1BTA
0 0 0 -22.784
Max Fz 38256 1001 1DL36843
+ 1SIDL +924.663
1CL + 1PLA +30.741
1.1TLA + 1.1BTA
0 0 0 84.002
Min Fz 38269 1001 1DL36838
+ 1SIDL +924.663
1CL + 1PLA + 50.07
1.1TLA + 1.1BTA
0 0 0 385.875
Max Mx 38252 1001 1DL36839
+ 1SIDL +924.663
1CL + 1PLA +43.944
1.1TLA + 1.1BTA
0 0 0 239.846
Min Mx 38252 1001 1DL36839
+ 1SIDL +924.663
1CL + 1PLA +43.944
1.1TLA + 1.1BTA
0 0 0 239.846
Max My 38268 1001 1DL36856
+ 1SIDL +924.663
1CL + 1PLA + -4.95
1.1TLA + 1.1BTA
0 0 0 -17.833
Min My 38269 1001 1DL36857
+ 1SIDL +924.663
1CL + 1PLA + 50.07
1.1TLA + 1.1BTA
0 0 0 335.605
Max Mz 38269 1001 1DL36838
+ 1SIDL +924.663
1CL + 1PLA + 50.07
1.1TLA + 1.1BTA
0 0 0 385.875
Min Mz 38262 1001 1DL36850
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -37.792

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38252 1039 1DL36839
+ 1SIDL 1244.166
+ 0.3CL + 0.3PLA
74.922
+ 0.3TLA 5.348
+ 0.3BTA47.306
+ 0.3SLX210.353
+ 1SLY + 0.3SLZ
327.39
Min Fx 38252 1023 1DL36840
+ 1SIDL +561.806
0.3SLX + 1SLY6.438
+ 0.3SLZ -5.348 -47.306 -212.779 48.398
Max Fy 38269 1031 1DL36838
+ 1SIDL 1140.573
+ 0.3CL + 0.3PLA
302.586
+ 0.3TLA +37.50.3BTA47.306
+ 1SLX +141.855
0.3SLY + 0.3SLZ
660.264
Min Fy 38269 1007 1DL36857
+ 1SIDL +665.399
1SLX + 0.3SLY
-210.15
+ 0.3SLZ -37.5 -47.306 -176.925 256.892
Max Fz 38269 1015 1DL36838
+ 1SIDL 1030.957
+ 0.3SLX + 0.3SLY
122.736
+ 1SLZ 124.999 157.686 472.85 445.172
Min Fz 38269 1015 1DL36857
+ 1SIDL +767.365
0.3SLX + 0.3SLY
-31.658
+ 1SLZ-124.999 -157.686 -589.75 289.561
Max Mx 38252 1015 1DL36839
+ 1SIDL 1030.957
+ 0.3SLX + 0.3SLY
72.512
+ 1SLZ 17.827 157.686 701.176 315.875
Min Mx 38252 1015 1DL36840
+ 1SIDL +767.365
0.3SLX + 0.3SLY
7.697
+ 1SLZ -17.826 -157.686 -709.262 52.68
Max My 38253 1015 1DL36840
+ 1SIDL 1030.957
+ 0.3SLX + 0.3SLY
58.967
+ 1SLZ 19.696 157.686 709.262 306.96
Min My 38252 1015 1DL36840
+ 1SIDL +767.365
0.3SLX + 0.3SLY
7.697
+ 1SLZ -17.826 -157.686 -709.262 52.68
Max Mz 38269 1031 1DL36838
+ 1SIDL 1140.573
+ 0.3CL + 0.3PLA
302.586
+ 0.3TLA +37.50.3BTA47.306
+ 1SLX +141.855
0.3SLY + 0.3SLZ
660.264
Min Mz 38258 1031 1DL36846
+ 1SIDL + 0.3CL
673.05
+ 0.3PLA
2.564
+ 0.3TLA -19.211
+ 0.3BTA-47.306
+ 1SLX +-131.094
0.3SLY + 0.3SLZ
-518.889
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38252 2139 1.0DL
36839
+ 1.0SIDL
1307.64
+ 0.3CL + 0.3PLA
84.992 + 0.3TLA
6.889
+ 0.3BTA
61.91
+ 0.3SLX
275.262
+ 1SLY +357.385
0.3SLZ
Min Fx 38252 2123 1.0DL
36840
+ 1.0SIDL
498.332
+ 0.3SLX + -3.632
1SLY + 0.3SLZ
-6.889 -61.909 -278.46 8.946
Max Fy 38269 2131 1.0DL
36838
+ 1.0SIDL
1200.135
+ 0.3CL +380.908
0.3PLA + 0.3TLA
49.055
+ 0.3BTA
61.91
+ 1SLX
185.397
+ 0.3SLY +750.333
0.3SLZ
Min Fy 38269 2107 1.0DL
36857
+ 1.0SIDL
605.837
+1SLX + -288.471
0.3SLY + 0.3SLZ
-49.055 -61.91 -231.415 244.504
Max Fz 38269 2115 1.0DL
36838
+ 1.0SIDL
1059.349
+ 0.3SLX 146.315
+ 0.3SLY + 1SLZ
163.516 206.365 617.991 472.701
Min Fz 38269 2115 1.0DL
36857
+ 1.0SIDL
738.972
+ 0.3SLX +-55.237
0.3SLY + 1SLZ
-163.516 -206.365 -771.382 285.418
Max Mx 38252 2115 1.0DL
36839
+ 1.0SIDL
1059.349
+ 0.3SLX +82.371
0.3SLY + 1SLZ
22.964 206.365 917.54 344.939
Min Mx 38252 2115 1.0DL
36840
+ 1.0SIDL
738.972
+ 0.3SLX + -2.162
0.3SLY + 1SLZ
-22.964 -206.365 -928.198 13.948
Max My 38253 2115 1.0DL
36840
+ 1.0SIDL
1059.349
+ 0.3SLX +65.578
0.3SLY + 1SLZ
25.513 206.365 928.198 345.692
Min My 38252 2115 1.0DL
36840
+ 1.0SIDL
738.972
+ 0.3SLX + -2.162
0.3SLY + 1SLZ
-22.964 -206.365 -928.198 13.948
Max Mz 38255 2131 1.0DL
36842
+ 1.0SIDL
1200.135
+ 0.3CL + 0.3PLA
57.873 + 0.3TLA
18.29
+ 0.3BTA
61.91
+ 1SLX
259.654
+ 0.3SLY +805.815
0.3SLZ
Min Mz 38257 2107 1.0DL
36845
+ 1.0SIDL
605.837
+1SLX + 0.3SLY
9.798
+ 0.3SLZ
-23.906 -61.91 -196.525 -681.827

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 0.785 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.318 %

Reinforcement Provided

Dia. (mm) Nos.


25 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 1059 990.5 1367 0.725 OK
Minima 498.3 278.6 1221 0.228 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 32.2 OK
Minima -27.58 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 5.924 OK 32.2 OK
Minima -1.183 OK -27.58 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.069 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 13.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Min Fx 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Max Fy 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Min Fy 38268 1001 1DL36855
+ 1SIDL +924.663
1CL + 1PLA + -4.95
1.1TLA + 1.1BTA
0 0 0 -22.784
Max Fz 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Min Fz 38276 1001 1DL36862
+ 1SIDL +924.663
1CL + 1PLA +-1.685
1.1TLA + 1.1BTA
0 0 0 -2.47
Max Mx 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Min Mx 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Max My 38268 1001 1DL36856
+ 1SIDL +924.663
1CL + 1PLA + -4.95
1.1TLA + 1.1BTA
0 0 0 -17.833
Min My 38262 1001 1DL36849
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -35.231
Max Mz 38278 1001 1DL36865
+ 1SIDL +924.663
1CL + 1PLA + -0.33
1.1TLA + 1.1BTA
0 0 0 0.45
Min Mz 38262 1001 1DL36850
+ 1SIDL +924.663
1CL + 1PLA + 2.56
1.1TLA + 1.1BTA
0 0 0 -37.792

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38262 1039 1DL36849
+ 1SIDL 1244.166
+ 0.3CL + 0.3PLA
21.766
+ 0.3TLA17.595
+ 0.3BTA47.306
+ 0.3SLX +71.003
1SLY + 0.3SLZ
76.192
Min Fx 38262 1023 1DL36850
+ 1SIDL +561.806
0.3SLX + 1SLY
-16.887
+ 0.3SLZ -17.595 -47.306 -53.458 -124.006
Max Fy 38262 1031 1DL36849
+ 1SIDL 1140.573
+ 0.3CL + 0.3PLA66.65
+ 0.3TLA17.595
+ 0.3BTA47.306
+ 1SLX + 0.3SLY
71.003+ 0.3SLZ
324.493
Min Fy 38263 1031 1DL36851
+ 1SIDL + 0.3CL
673.05
+ 0.3PLA
-62.327
+ 0.3TLA -15.578
+ 0.3BTA
-47.306
+ 1SLX + -37.935
0.3SLY + 0.3SLZ
-266.163
Max Fz 38262 1015 1DL36849
+ 1SIDL 1030.957
+ 0.3SLX + 0.3SLY
21.686
+ 1SLZ 58.65 157.686 236.676 75.793
Min Fz 38262 1015 1DL36850
+ 1SIDL +767.365
0.3SLX + 0.3SLY
-16.85
+ 1SLZ -58.65 -157.686 -178.193 -122.621
Max Mx 38262 1015 1DL36849
+ 1SIDL 1030.957
+ 0.3SLX + 0.3SLY
21.686
+ 1SLZ 58.65 157.686 236.676 75.793
Min Mx 38262 1015 1DL36850
+ 1SIDL +767.365
0.3SLX + 0.3SLY
-16.85
+ 1SLZ -58.65 -157.686 -178.193 -122.621
Max My 38262 1015 1DL36849
+ 1SIDL 1030.957
+ 0.3SLX + 0.3SLY
21.686
+ 1SLZ 58.65 157.686 236.676 75.793
Min My 38262 1020 1DL36849
+ 1SIDL - 943.557
0.3SLX + 0.3SLY
-16.817
- 1SLZ -58.65 -157.686 -236.676 -138.252
Max Mz 38262 1007 1DL36849
+ 1SIDL 1132.922
+ 1SLX + 0.3SLY66.607
+ 0.3SLZ 17.595 47.306 71.003 325.512
Min Mz 38262 1038 1DL36849
+ 1SIDL + 0.3CL
673.05
+ 0.3PLA
-61.728
+ 0.3TLA -17.595
- 0.3BTA
-47.306
- 1SLX - 0.3SLY
-71.003
- 0.3SLZ
-390.204
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 38262 2139 1.0DL
36849
+ 1.0SIDL
1307.64
+ 0.3CL + 0.3PLA
27.681 + 0.3TLA
23.029
+ 0.3BTA
61.91
+ 0.3SLX
92.921
+ 1SLY +109.361
0.3SLZ
Min Fx 38262 2123 1.0DL
36850
+ 1.0SIDL
498.332
+ 0.3SLX +-22.802
1SLY + 0.3SLZ
-23.029 -61.909 -69.954 -151.261
Max Fy 38262 2131 1.0DL
36849
+ 1.0SIDL
1200.135
+ 0.3CL + 0.3PLA
86.34 + 0.3TLA
23.029
+ 0.3BTA
61.91
+ 1SLX92.921
+ 0.3SLY +434.024
0.3SLZ
Min Fy 38262 2107 1.0DL
36850
+ 1.0SIDL
605.837
+1SLX + 0.3SLY
-81.46
+ 0.3SLZ
-23.029 -61.91 -69.954 -417.265
Max Fz 38262 2115 1.0DL
36849
+ 1.0SIDL
1059.349
+ 0.3SLX +27.595
0.3SLY + 1SLZ
76.764 206.365 309.735 108.723
Min Fz 38262 2115 1.0DL
36850
+ 1.0SIDL
738.972
+ 0.3SLX +-22.758
0.3SLY + 1SLZ
-76.764 -206.365 -233.181 -149.644
Max Mx 38262 2115 1.0DL
36849
+ 1.0SIDL
1059.349
+ 0.3SLX +27.595
0.3SLY + 1SLZ
76.764 206.365 309.735 108.723
Min Mx 38262 2115 1.0DL
36850
+ 1.0SIDL
738.972
+ 0.3SLX +-22.758
0.3SLY + 1SLZ
-76.764 -206.365 -233.181 -149.644
Max My 38262 2115 1.0DL
36849
+ 1.0SIDL
1059.349
+ 0.3SLX +27.595
0.3SLY + 1SLZ
76.764 206.365 309.735 108.723
Min My 38262 2120 1.0DL
36849
+ 1.0SIDL
945.234
- 0.3SLX +-22.721
0.3SLY - 1SLZ-76.764 -206.365 -309.735 -170.979
Max Mz 38262 2107 1.0DL
36849
+ 1.0SIDL
1192.484
+1SLX + 0.3SLY
86.297+ 0.3SLZ23.029 61.91 92.921 435.042
Min Mz 38262 2134 1.0DL
36849
+ 1.0SIDL
613.488
+ 0.3CL +-81.418
0.3PLA + 0.3TLA
23.029
- 0.3BTA
61.91
- 1SLX -92.92
0.3SLY +-499.734
0.3SLZ

ODE MDE
Maximum Tension Force (kN) 561.81 498.332
Skin Friction (kN) 959.33
Final Axial Load (kN) 0.00 0.00

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


16 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima 613.5 508.3 709.2 0.717 OK
Minima 1308 143.5 929.2 0.154 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 38.55 OK
Minima -268.9 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 1.523 OK 10.23 OK
Minima 0.7742 OK 6.183 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.00 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.7615 m
Hence de = 0.742 m and dv = 0.668 m
Horizontal resultant shear force at the section, Vu = 384 kN
Corresponding axial compressive force, N = 1200 kN
Eff. width to be taken = diameter of section = bv = 1.00 m
Total vertical reinforcement at the section = 7854 mm2
Effective area of tensile steel = 50% of total steel = A s = 0.0039 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 0.588 %
Horizontal shear force, Vu = 384 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 574.80 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
1/3 1/3
vc = 0.27/ m (100As/(bd)) (fcu) (where m = 1.25) = 0.619 Mpa
= 619 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.930
Allowable shear stress in concrete, s vc = 575.517 kN/m2
Gross area of concrete section, Ac 0.785 m2
Increase in shear stress (1 + 0.05N/A c) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.08
Modified shear strength of concrete (n s vc ) = 619.49 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = -29.86 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 267.26 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 225 mm
Provided spacing 210 mm
OK
Shear reinforcement 13mm dia @ 210mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

PILE DESIGN FOR PG2A


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

PILE DESIGN FOR PG2A

Grade of Concrete = C32/40


Grade of Reinforcement = Fe390
No. of Piles = 1
Pile Diameter = 1.2 m

1.0 Member Forces from STAAD at Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31670 1005 1DL30730
+ 1SIDL +2211.878
1CL + 1PLA +61.529
1PLB + 1.1TLA
-32.75
+ 1.1TLB
-13.857
+ 1.1BTA 146.613
+ 1.1BTB 123.617
Min Fx 31639 1005 1DL30699
+ 1SIDL +881.059
1CL + 1PLA +53.605
1PLB + 1.1TLA
-29.751
+ 1.1TLB-9.431
+ 1.1BTA 140.958
+ 1.1BTB 90.618
Max Fy 31687 1005 1DL30729
+ 1SIDL +2211.878
1CL + 1PLA +94.374
1PLB + 1.1TLA
-42.408
+ 1.1TLB
-13.857
+ 1.1BTA + 1.1BTB
264.4 372.549
Min Fy 31687 1006 1DL30729
+ 1SIDL +1456.837
1CL + 1PLA -32.784
+ 1PLB + 1.1TLA
-74.02
+ 1.1TLB17.655
- 1.1BTA -514.565
1.1BTB 42.544
Max Fz 31655 1006 1DL30715
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
5.407+ 1.1TLA
11.343
+ 1.1TLB 28.29
- 1.1BTA - 1.1BTB
-69.46 10.375
Min Fz 31656 1006 1DL30698
+ 1SIDL +1608.486
1CL + 1PLA -16.644
+ 1PLB + 1.1TLA
-91.263
+ 1.1TLB 28.29
- 1.1BTA -602.772
1.1BTB 113.495
Max Mx 31639 1006 1DL30699
+ 1SIDL +1608.486
1CL + 1PLA +-1.427
1PLB + 1.1TLA
-72.255
+ 1.1TLB28.29
- 1.1BTA -347.225
1.1BTB 146.445
Min Mx 31670 1005 1DL30730
+ 1SIDL +2211.878
1CL + 1PLA +61.529
1PLB + 1.1TLA
-32.75
+ 1.1TLB
-13.857
+ 1.1BTA 146.613
+ 1.1BTB 123.617
Max My 31656 1006 1DL30698
+ 1SIDL +1608.486
1CL + 1PLA -16.644
+ 1PLB + 1.1TLA
-91.263
+ 1.1TLB 28.29
- 1.1BTA -602.772
1.1BTB 113.495
Min My 31649 1006 1DL30710
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
12.25+ 1.1TLA
-4.156
+ 1.1TLB 28.29
- 1.1BTA-100.869
- 1.1BTB 57.709
Max Mz 31687 1005 1DL30729
+ 1SIDL +2211.878
1CL + 1PLA +94.374
1PLB + 1.1TLA
-42.408
+ 1.1TLB
-13.857
+ 1.1BTA + 1.1BTB
264.4 372.549
Min Mz 31678 1005 1DL30739
+ 1SIDL +2211.878
1CL + 1PLA + 1PLB
1.39+ 1.1TLA
-7.509
+ 1.1TLB
-13.857
+ 1.1BTA +-44.758
1.1BTB -164.163

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31639 1102 1DL30700
+ 1SIDL +5721.16
0.3CL + 0.3PLA
190.595
+ 0.3PLB370.059
+ 0.3TLA +219.365
0.3TLB - 0.3BTA
579.426
- 0.3BTB646.344
- 0.3SLX - 0.3SLY - 1S
Min Fx 31639 1095 1DL30700
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-147.323
+ 0.3PLB
-453.364
+ 0.3TLA -206.552
+ 0.3TLB + 0.3BTA
-259.411+ 0.3BTB
-491.964
+ 0.3SLX + 0.3SLY +
Max Fy 31687 1079 1DL30729
+ 1SIDL +5444.938
0.3CL + 0.3PLA
655.009
+ 0.3PLB250.852
+ 0.3TLA +170.714
0.3TLB + 0.3BTA
1864.404 + 0.3BTB
2167.263
+ 1SLX + 0.3SLY + 0.
Min Fy 31687 1086 1DL30729
+ 1SIDL-2048.709
+ 0.3CL + 0.3PLA
-601.249
+ 0.3PLB
-346.481
+ 0.3TLA -170.475
+ 0.3TLB - 0.3BTA
-1221.427- 0.3BTB
-1805.806
- 1SLX - 0.3SLY - 0.3S
Max Fz 31656 3071 1DL30698
+ 1SIDL +5535.872
0.3CL + 0.3PLB
300.719
+ 0.3TLB607.174
+ 0.3BTB209.213
+ 0.3SLX2758.233
+ 0.3SLY + 1SLZ
1344.198
+ 1.1NLB
Min Fz 31656 1102 1DL30698
+ 1SIDL-3102.624
+ 0.3CL + 0.3PLA
-251.826
+ 0.3PLB
-708.095
+ 0.3TLA -196.264
+ 0.3TLB - 0.3BTA
-2068.142- 0.3BTB
-1003.834
- 0.3SLX - 0.3SLY - 1S
Max Mx 31639 1102 1DL30700
+ 1SIDL + 5721.16
0.3CL + 0.3PLA
190.595
+ 0.3PLB370.059
+ 0.3TLA +219.365
0.3TLB - 0.3BTA
579.426
- 0.3BTB646.344
- 0.3SLX - 0.3SLY - 1S
Min Mx 31639 1095 1DL30700
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-147.323
+ 0.3PLB
-453.364
+ 0.3TLA -206.552
+ 0.3TLB + 0.3BTA
-259.411+ 0.3BTB
-491.964
+ 0.3SLX + 0.3SLY +
Max My 31656 3047 1DL30698
+ 1SIDL +5613.556
0.3CL + 0.3PLA299.3
+ 0.3TLA593.303
+ 0.3BTA 213.333
+ 0.3SLX2811.132
+ 0.3SLY + 1SLZ
1334.035
+ 1.1NLA
Min My 31656 1022 1DL30698
+ 1SIDL-3216.825
- 0.3SLX - 0.3SLY
-240.558
- 1SLZ -695.709 -202.668 -2148.856 -992.013
Max Mz 31687 1079 1DL30729
+ 1SIDL +5444.938
0.3CL + 0.3PLA
655.009
+ 0.3PLB250.852
+ 0.3TLA +170.714
0.3TLB + 0.3BTA
1864.404 + 0.3BTB
2167.263
+ 1SLX + 0.3SLY + 0.
Min Mz 31687 1086 1DL30729
+ 1SIDL-2048.709
+ 0.3CL + 0.3PLA
-601.249
+ 0.3PLB
-346.481
+ 0.3TLA -170.475
+ 0.3TLB - 0.3BTA
-1221.427- 0.3BTB
-1805.806
- 1SLX - 0.3SLY - 0.3S
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31639 2202 1.0DL
30700
+ 1.0SIDL
7078.543
+ 0.3CL +244.334
0.3PLA + 0.3PLB
497.808
+ 0.3TLA
282.393
+ 0.3TLB 695.651
- 0.3BTA - 0.3BTB
814.453
- 0.3SLX - 0.3SLY
Min Fx 31639 2195 1.0DL
30700
+ 1.0SIDL
-4658.396
+ 0.3CL +-201.062
0.3PLA + 0.3PLB
-581.113
+ 0.3TLA
-269.579
+ 0.3TLB-375.637
+ 0.3BTA + 0.3BTB
-660.073+ 0.3SLX + 0.3SL
Max Fy 31687 2179 1.0DL
30729
+ 1.0SIDL
6564.616
+ 0.3CL +842.108
0.3PLA + 0.3PLB
340.012
+ 0.3TLA
223.766
+ 0.3TLB2341.241
+ 0.3BTA + 2755.922
0.3BTB + 1SLX + 0.3SLY
Min Fy 31687 2186 1.0DL
30729
+ 1.0SIDL
-3168.387
+ 0.3CL +-788.348
0.3PLA + 0.3PLB
-435.641
+ 0.3TLA
-223.528
+ 0.3TLB-1698.265
- 0.3BTA - -2394.465
0.3BTB - 1SLX - 0.3SLY -
Max Fz 31656 3171 1.0DL
30698
+ 1.0SIDL
6881.857
+ 0.3CL +382.352
0.3PLB + 0.3TLB
807.513+ 0.3BTB
271.807+ 0.3SLX
3504.232
+ 0.3SLY1695.637
+ 1SLZ + 1.54NLB
Min Fz 31656 2202 1.0DL
30698
+ 1.0SIDL
-4460.007
+ 0.3CL +-333.031
0.3PLA + 0.3PLB
-906.754
+ 0.3TLA
-259.292
+ 0.3TLB-2819.931
- 0.3BTA - -1352.702
0.3BTB - 0.3SLX - 0.3SLY
Max Mx 31639 2202 1.0DL
30700
+ 1.0SIDL
7078.543
+ 0.3CL +244.334
0.3PLA + 0.3PLB
497.808
+ 0.3TLA
282.393
+ 0.3TLB 695.651
- 0.3BTA - 0.3BTB
814.453
- 0.3SLX - 0.3SLY
Min Mx 31639 3171 1.0DL
30700
+ 1.0SIDL
-4656.693
+ 0.3CL +-204.382
0.3PLB + -577.895
0.3TLB + 0.3BTB
-269.877+ 0.3SLX
-371.088
+ 0.3SLY-650.624
+ 1SLZ + 1.54NLB
Max My 31656 3147 1.0DL
30698
+ 1.0SIDL
6982.336
+ 0.3CL +380.076
0.3PLA + 0.3TLA
790.283
+ 0.3BTA
276.794
+ 0.3SLX
3568.712
+ 0.3SLY 1680.33
+ 1SLZ + 1.54NLA
Min My 31656 2122 1.0DL
30698
+ 1.0SIDL
-4574.208
- 0.3SLX-321.763
- 0.3SLY - 1SLZ
-894.368 -265.695 -2900.646 -1340.88
Max Mz 31687 2179 1.0DL
30729
+ 1.0SIDL
6564.616
+ 0.3CL +842.108
0.3PLA + 0.3PLB
340.012
+ 0.3TLA
223.766
+ 0.3TLB2341.241
+ 0.3BTA + 2755.922
0.3BTB + 1SLX + 0.3SLY
Min Mz 31687 2186 1.0DL
30729
+ 1.0SIDL
-3168.387
+ 0.3CL +-788.348
0.3PLA + 0.3PLB
-435.641
+ 0.3TLA
-223.528
+ 0.3TLB-1698.265
- 0.3BTA - -2394.465
0.3BTB - 1SLX - 0.3SLY -

1.1 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

1.1.1 Minimum Reinforcement Required

From Table 9.6N, pg. 168, EN 1992-1-1: 2004 (E), recommended minimum longitudinal reinforcement area
Here, Ac = 1.131 m2
Therefore, minimum percentage of reinforcement required, As,bpmin = 0.250 %

Reinforcement Provided

Dia. (mm) Nos.


40 16
(Bundled)
40 16

1.1.2 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -4574 3196 4338 0.737 OK
Minima 7079 1071 6442 0.166 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

N/M Curve for MDE

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 128 OK
Minima -279 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 4.031 OK 24.23 OK
Minima -1.696 OK -7.552 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.020 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

2.0 Curtailment Check


2.1 Member Forces from STAAD at 21.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31691 1005 1DL30750
+ 1SIDL +2211.878
1CL + 1PLA -12.599
+ 1PLB + 1.1TLA
5.153
+ 1.1TLB
-13.857
+ 1.1BTA +-21.193
1.1BTB -39.681
Min Fx 31660 1005 1DL30719
+ 1SIDL +881.059
1CL + 1PLA -11.304
+ 1PLB + 1.1TLA
4.532
+ 1.1TLB-9.431
+ 1.1BTA +-19.259
1.1BTB -34.555
Max Fy 31691 1006 1DL30750
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
5.277+ 1.1TLA
8.716
+ 1.1TLB17.655
- 1.1BTA --38.831
1.1BTB 7.823
Min Fy 31691 1005 1DL30750
+ 1SIDL +2211.878
1CL + 1PLA -12.599
+ 1PLB + 1.1TLA
5.153
+ 1.1TLB
-13.857
+ 1.1BTA +-21.193
1.1BTB -39.681
Max Fz 31660 1006 1DL30719
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
3.161+ 1.1TLA
10.913
+ 1.1TLB 28.29
- 1.1BTA --46.779
1.1BTB 0.786
Min Fz 31699 1005 1DL30758
+ 1SIDL +2211.878
1CL + 1PLA + 1PLB
0.529+ 1.1TLA
0.083
+ 1.1TLB
-13.857
+ 1.1BTA + -0.083
1.1BTB 0.529
Max Mx 31660 1006 1DL30719
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
3.161+ 1.1TLA
10.913
+ 1.1TLB28.29
- 1.1BTA --46.779
1.1BTB 0.786
Min Mx 31691 1005 1DL30750
+ 1SIDL +2211.878
1CL + 1PLA -12.599
+ 1PLB + 1.1TLA
5.153
+ 1.1TLB
-13.857
+ 1.1BTA +-21.193
1.1BTB -39.681
Max My 31668 1005 1DL30728
+ 1SIDL + 881.059
1CL + 1PLA + 1PLB
0.538+ 1.1TLA0.11
+ 1.1TLB-9.431
+ 1.1BTA + 1.1BTB0 0
Min My 31660 1006 1DL30719
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
3.161+ 1.1TLA
10.913
+ 1.1TLB 28.29
- 1.1BTA --46.779
1.1BTB 0.786
Max Mz 31691 1006 1DL30750
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
5.277+ 1.1TLA
8.716
+ 1.1TLB17.655
- 1.1BTA --38.831
1.1BTB 7.823
Min Mz 31691 1005 1DL30750
+ 1SIDL +2211.878
1CL + 1PLA -12.599
+ 1PLB + 1.1TLA
5.153
+ 1.1TLB
-13.857
+ 1.1BTA +-21.193
1.1BTB -39.681

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31660 1102 1DL30720
+ 1SIDL +5721.16
0.3CL + 0.3PLA
34.051
+ 0.3PLB +94.217
0.3TLA +219.365
0.3TLB - 0.3BTA
158.587
- 0.3BTB71.555
- 0.3SLX - 0.3SLY - 1S
Min Fx 31660 1095 1DL30720
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-40.785
+ 0.3PLB-81.693
+ 0.3TLA -206.552
+ 0.3TLB + 0.3BTA
-199.999
+ 0.3BTB
-92.827
+ 0.3SLX + 0.3SLY +
Max Fy 31691 1086 1DL30751
+ 1SIDL +5239.018
0.3CL + 0.3PLA
83.354
+ 0.3PLB +43.395
0.3TLA +179.308
0.3TLB - 0.3BTA79.9
- 0.3BTB149.55
- 1SLX - 0.3SLY - 0.3S
Min Fy 31691 1079 1DL30751
+ 1SIDL-1842.789
+ 0.3CL + 0.3PLA
-89.749
+ 0.3PLB +-32.02
0.3TLA -179.069
+ 0.3TLB + 0.3BTA
-117.936
+ 0.3BTB
-170.932
+ 1SLX + 0.3SLY + 0.
Max Fz 31660 1102 1DL30720
+ 1SIDL + 5721.16
0.3CL + 0.3PLA
34.051
+ 0.3PLB +94.217
0.3TLA +219.365
0.3TLB - 0.3BTA
158.587
- 0.3BTB71.555
- 0.3SLX - 0.3SLY - 1S
Min Fz 31660 3071 1DL30720
+ 1SIDL-3287.912
+ 0.3CL + 0.3PLB
-39.806
+ 0.3TLB -82.273
+ 0.3BTB
-206.417
+ 0.3SLX -199.188
+ 0.3SLY + 1SLZ
-91.465
+ 1.1NLB
Max Mx 31660 1102 1DL30720
+ 1SIDL + 5721.16
0.3CL + 0.3PLA
34.051
+ 0.3PLB +94.217
0.3TLA +219.365
0.3TLB - 0.3BTA
158.587
- 0.3BTB71.555
- 0.3SLX - 0.3SLY - 1S
Min Mx 31660 1095 1DL30720
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-40.785
+ 0.3PLB-81.693
+ 0.3TLA -206.552
+ 0.3TLB + 0.3BTA
-199.999
+ 0.3BTB
-92.827
+ 0.3SLX + 0.3SLY +
Max My 31660 3071 1DL30719
+ 1SIDL +5535.872
0.3CL + 0.3PLB
31.085
+ 0.3TLB 91.897
+ 0.3BTB209.213
+ 0.3SLX +247.357
0.3SLY + 1SLZ97.384
+ 1.1NLB
Min My 31660 1102 1DL30719
+ 1SIDL-3102.624
+ 0.3CL + 0.3PLA-36.84
+ 0.3PLB-79.953
+ 0.3TLA -196.264
+ 0.3TLB - 0.3BTA
-299.902
- 0.3BTB-123.05
- 0.3SLX - 0.3SLY - 1S
Max Mz 31691 1007 1DL30750
+ 1SIDL +5283.491
1SLX + 0.3SLY81.113
+ 0.3SLZ 42.381 174.276 115.415 227.078
Min Mz 31691 1014 1DL30750
+ 1SIDL-2004.236
- 1SLX - 0.3SLY
-87.115
- 0.3SLZ -32.062 -175.507 -160.33 -253.126
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31660 2202 1.0DL
30720
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
44.888+ 0.3PLB
120.919
+ 0.3TLA
282.393
+ 0.3TLB 214.269
- 0.3BTA - 0.3BTB
95.669
- 0.3SLX - 0.3SLY
Min Fx 31660 2195 1.0DL
30720
+ 1.0SIDL
-4658.396
+ 0.3CL + -51.622
0.3PLA + 0.3PLB
-108.395
+ 0.3TLA
-269.579
+ 0.3TLB +-255.68
0.3BTA + 0.3BTB
-116.941+ 0.3SLX + 0.3SL
Max Fy 31691 2186 1.0DL
30751
+ 1.0SIDL
6358.695
+ 0.3CL +109.145
0.3PLA + 0.3PLB
54.674
+ 0.3TLA
232.361
+ 0.3TLB 110.413
- 0.3BTA - 0.3BTB
197.181
- 1SLX - 0.3SLY -
Min Fy 31691 2179 1.0DL
30751
+ 1.0SIDL
-2962.467
+ 0.3CL + -115.54
0.3PLA + 0.3PLB
-43.298
+ 0.3TLA
-232.122
+ 0.3TLB-148.448
+ 0.3BTA + 0.3BTB
-218.563+ 1SLX + 0.3SLY
Max Fz 31660 2202 1.0DL
30720
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
44.888+ 0.3PLB
120.919
+ 0.3TLA
282.393
+ 0.3TLB 214.269
- 0.3BTA - 0.3BTB
95.669
- 0.3SLX - 0.3SLY
Min Fz 31660 3171 1.0DL
30720
+ 1.0SIDL
-4656.693
+ 0.3CL + -50.696
0.3PLB + -109.203
0.3TLB + 0.3BTB
-269.877
+ 0.3SLX
-254.421
+ 0.3SLY-115.737
+ 1SLZ + 1.54NLB
Max Mx 31660 2202 1.0DL
30720
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
44.888+ 0.3PLB
120.919
+ 0.3TLA
282.393
+ 0.3TLB 214.269
- 0.3BTA - 0.3BTB
95.669
- 0.3SLX - 0.3SLY
Min Mx 31660 3171 1.0DL
30720
+ 1.0SIDL
-4656.693
+ 0.3CL + -50.696
0.3PLB + -109.203
0.3TLB + 0.3BTB
-269.877
+ 0.3SLX
-254.421
+ 0.3SLY-115.737
+ 1SLZ + 1.54NLB
Max My 31660 3171 1.0DL
30719
+ 1.0SIDL
6881.857
+ 0.3CL + 0.3PLB
41.869+ 0.3TLB
118.37
+ 0.3BTB
271.807
+ 0.3SLX
330.396
+ 0.3SLY +131.847
1SLZ + 1.54NLB
Min My 31660 2202 1.0DL
30719
+ 1.0SIDL
-4460.007
+ 0.3CL + -47.677
0.3PLA + 0.3PLB
-106.654
+ 0.3TLA
-259.292
+ 0.3TLB-382.263
- 0.3BTA - 0.3BTB
-157.724
- 0.3SLX - 0.3SLY
Max Mz 31691 2107 1.0DL
30750
+ 1.0SIDL
6403.169
+1SLX + 0.3SLY
106.904+ 0.3SLZ 53.66 227.328 157.15 300.446
Min Mz 31691 2114 1.0DL
30750
+ 1.0SIDL
-3123.914
- 1SLX - 0.3SLY
-112.906
- 0.3SLZ -43.34 -228.56 -202.065 -326.494

ODE MDE
Maximum Tension Force (kN) -3301.01 -4658.4
Skin Friction (kN) 3790.00
Final Axial Load (kN) 0.00 -868.40

2.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


22 16

2.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -670 413.5 802.4 0.515 OK
Minima 6359 226 2903 0.078 OK

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 42.37 OK
Minima -53.59 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 2.148 OK 14.96 OK
Minima 0.5298 OK 4.118 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK

3.0 Shear Check at Bottom of Pile Cap

As per Cl. C5.2.8.9, pg. 5-64, AASHTO LRFD Bridge Design Specifications 2012,
Effective depth to be considered in the shear check
dv = 0.9 de
where de = D/2 + Dr
D = Dia of pile = 1.20 m
Dr = Dia of circle passing through the centres of longitudinal reinforcement
= 0.954 m
Hence de = 0.904 m and dv = 0.813 m
Horizontal resultant shear force at the section, Vu = 966 kN
Corresponding axial compressive force, N = 0 kN
Eff. width to be taken = diameter of section = bv = 1.20 m
Total vertical reinforcement at the section = 40212 mm2
Effective area of tensile steel = 50% of total steel = As = 0.0201 m2
Percentage of tensile reinforcement = 100 As /(bv . dv) = 2.060 %
Horizontal shear force, Vu = 966 kN
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

Shear stress (vv = Vu /(bv . dv) = 989.77 kN/m2


Grade of concrete = C40
As per Cl. 5.3.3.2, pg. 18, BS 5400-4: 1990, ultimate shear stress in concrete,
vc = 0.27/ m (100As/(bd))1/3 (fcu)1/3 (where m = 1.25) = 0.940 Mpa
= 940 kN/m2
Depth Factor, s = (500/d)1/4 or 0.70, whichever is greater = 0.885
Allowable shear stress in concrete, s vc = 832.311 kN/m2
Gross area of concrete section, Ac 1.131 m2
Increase in shear stress (1 + 0.05N/Ac) is done as per Cl. 5.5.6, pg. 29, BS 5400-4: 1990,
n = (1 + 0.05N /Ac) = 1.00
Modified shear strength of concrete (n s vc ) = 832.31 kN/m2
Shear to be carried by stirrups, Vus = Vu - (n s vc ) bv dv = 153.67 kN
As per Table 7, pg. 18, BS 5400-4: 1990, minimum shear to be carried by stirrups,
Vus,min = 0.4 bv dv = 390.38 kN
Dia of stirrup = 13 mm
No. of legs = 2
As per Table 7, pg. 18, BS 5400-4: 1990, spacing required,
sv = 0.87 fyv Asv d / Vus = 188 mm
Provided spacing 180 mm
OK
Shear reinforcement 13mm dia @ 180mm c/c
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

4.0 Curtailment Check


4.1 Member Forces from STAAD at 13.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31680 1005 1DL30740
+ 1SIDL +2211.878
1CL + 1PLA -10.302
+ 1PLB + 1.1TLA
-1.017
+ 1.1TLB
-13.857
+ 1.1BTA +-48.615
1.1BTB -158.734
Min Fx 31649 1005 1DL30709
+ 1SIDL +881.059
1CL + 1PLA -10.349
+ 1PLB + 1.1TLA
-1.549
+ 1.1TLB-9.431
+ 1.1BTA +-40.715
1.1BTB -145.871
Max Fy 31680 1006 1DL30740
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
13.59+ 1.1TLA
-4.866
+ 1.1TLB17.655
- 1.1BTA --72.427
1.1BTB 95.409
Min Fy 31684 1005 1DL30744
+ 1SIDL +2211.878
1CL + 1PLA -16.973
+ 1PLB + 1.1TLA
4.757
+ 1.1TLB
-13.857
+ 1.1BTA +-42.188
1.1BTB -102.757
Max Fz 31655 1006 1DL30715
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
5.407+ 1.1TLA
11.343
+ 1.1TLB 28.29
- 1.1BTA - 1.1BTB
-69.46 10.375
Min Fz 31680 1006 1DL30740
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
13.59+ 1.1TLA
-4.866
+ 1.1TLB17.655
- 1.1BTA --72.427
1.1BTB 95.409
Max Mx 31649 1006 1DL30709
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
12.25+ 1.1TLA
-4.156
+ 1.1TLB28.29
- 1.1BTA --96.713
1.1BTB 69.958
Min Mx 31680 1005 1DL30740
+ 1SIDL +2211.878
1CL + 1PLA -10.302
+ 1PLB + 1.1TLA
-1.017
+ 1.1TLB
-13.857
+ 1.1BTA +-48.615
1.1BTB -158.734
Max My 31668 1005 1DL30728
+ 1SIDL + 881.059
1CL + 1PLA + 1PLB
0.538+ 1.1TLA0.11
+ 1.1TLB-9.431
+ 1.1BTA + 1.1BTB0 0
Min My 31649 1006 1DL30710
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
12.25+ 1.1TLA
-4.156
+ 1.1TLB 28.29
- 1.1BTA-100.869
- 1.1BTB 57.709
Max Mz 31680 1006 1DL30740
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
13.59+ 1.1TLA
-4.866
+ 1.1TLB17.655
- 1.1BTA --72.427
1.1BTB 95.409
Min Mz 31680 1005 1DL30740
+ 1SIDL +2211.878
1CL + 1PLA -10.302
+ 1PLB + 1.1TLA
-1.017
+ 1.1TLB
-13.857
+ 1.1BTA +-48.615
1.1BTB -158.734

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31649 1102 1DL30710
+ 1SIDL +5721.16
0.3CL + 0.3PLA
50.326
+ 0.3PLB +80.981
0.3TLA +219.365
0.3TLB - 0.3BTA
972.514
- 0.3BTB417.483
- 0.3SLX - 0.3SLY - 1S
Min Fx 31649 1095 1DL30710
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-48.665
+ 0.3PLB-86.012
+ 0.3TLA -206.552
+ 0.3TLB + -1087.723
0.3BTA + 0.3BTB-481.633
+ 0.3SLX + 0.3SLY +
Max Fy 31683 1086 1DL30744
+ 1SIDL +5239.018
0.3CL + 0.3PLA
129.045
+ 0.3PLB +42.676
0.3TLA +179.308
0.3TLB - 0.3BTA
253.629
- 0.3BTB678.883
- 1SLX - 0.3SLY - 0.3S
Min Fy 31683 1079 1DL30744
+ 1SIDL-1842.789
+ 0.3CL + 0.3PLA
-132.697
+ 0.3PLB-36.181
+ 0.3TLA -179.069
+ 0.3TLB + 0.3BTA
-346.842
+ 0.3BTB
-731.284
+ 1SLX + 0.3SLY + 0.
Max Fz 31653 3047 1DL30713
+ 1SIDL +5613.556
0.3CL + 0.3PLA
45.093
+ 0.3TLA 125.861
+ 0.3BTA 213.333
+ 0.3SLX +655.474
0.3SLY + 1SLZ
254.792
+ 1.1NLA
Min Fz 31653 3071 1DL30714
+ 1SIDL-3287.912
+ 0.3CL + 0.3PLB
-54.303
+ 0.3TLB-116.219
+ 0.3BTB
-206.417
+ 0.3SLX -626.401
+ 0.3SLY + 1SLZ
-272.462
+ 1.1NLB
Max Mx 31649 1102 1DL30710
+ 1SIDL + 5721.16
0.3CL + 0.3PLA
50.326
+ 0.3PLB +80.981
0.3TLA +219.365
0.3TLB - 0.3BTA
972.514
- 0.3BTB417.483
- 0.3SLX - 0.3SLY - 1S
Min Mx 31649 1095 1DL30710
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-48.665
+ 0.3PLB-86.012
+ 0.3TLA -206.552
+ 0.3TLB + -1087.723
0.3BTA + 0.3BTB-481.633
+ 0.3SLX + 0.3SLY +
Max My 31649 3071 1DL30709
+ 1SIDL +5535.872
0.3CL + 0.3PLB
45.744
+ 0.3TLB 80.758
+ 0.3BTB209.213
+ 0.3SLX +1076.53
0.3SLY + 1SLZ
411.876
+ 1.1NLB
Min My 31649 1054 1DL30709
+ 1SIDL-3137.165
+ 0.3CL + 0.3PLA
-44.086
+ 0.3TLA-86.225
- 0.3BTA
-198.182
- 0.3SLX-1178.306
- 0.3SLY - 1SLZ
-473.984
Max Mz 31680 1007 1DL30740
+ 1SIDL +5283.491
1SLX + 0.3SLY
101.975
+ 0.3SLZ 36.873 174.276 363.076 1118.737
Min Mz 31680 1014 1DL30740
+ 1SIDL-2004.236
- 1SLX - 0.3SLY-99.35
- 0.3SLZ -41.519 -175.507 -452.297 -1170.867
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31649 2202 1.0DL
30710
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
64.625+ 0.3PLB
106.836
+ 0.3TLA
282.393
+ 0.3TLB1291.177
- 0.3BTA - 0.3BTB
547.178
- 0.3SLX - 0.3SLY
Min Fx 31649 2195 1.0DL
30710
+ 1.0SIDL
-4658.396
+ 0.3CL + -62.965
0.3PLA + 0.3PLB
-111.868
+ 0.3TLA
-269.579
+ 0.3TLB-1406.386
+ 0.3BTA + 0.3BTB
-611.327+ 0.3SLX + 0.3SL
Max Fy 31683 2186 1.0DL
30744
+ 1.0SIDL
6358.695
+ 0.3CL +168.095
0.3PLA + 0.3PLB
54.633
+ 0.3TLA
232.361
+ 0.3TLB - 345.81
0.3BTA - 0.3BTB
888.986
- 1SLX - 0.3SLY -
Min Fy 31683 2179 1.0DL
30744
+ 1.0SIDL
-2962.467
+ 0.3CL +-171.747
0.3PLA + 0.3PLB
-48.137
+ 0.3TLA
-232.122
+ 0.3TLB-439.023
+ 0.3BTA + 0.3BTB
-941.387+ 1SLX + 0.3SLY
Max Fz 31653 3147 1.0DL
30713
+ 1.0SIDL
6982.336
+ 0.3CL + 0.3PLA
60.381+ 0.3TLA
162.981
+ 0.3BTA
276.794
+ 0.3SLX
871.337
+ 0.3SLY 343.603
+ 1SLZ + 1.54NLA
Min Fz 31653 3171 1.0DL
30714
+ 1.0SIDL
-4656.693
+ 0.3CL + -69.591
0.3PLB + -153.338
0.3TLB + 0.3BTB
-269.877+ 0.3SLX
-805.837
+ 0.3SLY-346.604
+ 1SLZ + 1.54NLB
Max Mx 31649 2202 1.0DL
30710
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
64.625+ 0.3PLB
106.836
+ 0.3TLA
282.393
+ 0.3TLB1291.177
- 0.3BTA - 0.3BTB
547.178
- 0.3SLX - 0.3SLY
Min Mx 31649 3171 1.0DL
30710
+ 1.0SIDL
-4656.693
+ 0.3CL + -61.379
0.3PLB + -113.034
0.3TLB + 0.3BTB
-269.877+ 0.3SLX
-1395.79
+ 0.3SLY-598.667
+ 1SLZ + 1.54NLB
Max My 31649 3171 1.0DL
30709
+ 1.0SIDL
6881.857
+ 0.3CL + 0.3PLB
60.047+ 0.3TLB
106.381+ 0.3BTB
271.807+ 0.3SLX
1422.032
+ 0.3SLY +551.776
1SLZ + 1.54NLB
Min My 31649 3178 1.0DL
30709
+ 1.0SIDL
-4480.076
+ 0.3CL + -58.345
0.3PLB + -111.798
0.3TLB - 0.3BTB
-261.754
- 0.3SLX
-1521.699
- 0.3SLY --611.856
1SLZ - 1.54NLB
Max Mz 31680 2107 1.0DL
30740
+ 1.0SIDL
6403.169
+1SLX + 0.3SLY
133.035+ 0.3SLZ 48.94 227.328 486.75 1470.485
Min Mz 31680 2114 1.0DL
30740
+ 1.0SIDL
-3123.914
- 1SLX - 0.3SLY
-130.41
- 0.3SLZ-53.587 -228.56 -575.971 -1522.615

ODE MDE
Maximum Tension Force (kN) -3301.01 -4658.4
Skin Friction (kN) 1847.33
Final Axial Load (kN) -1453.68 -2811.06

4.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


40 16

4.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -2633 1640 2167 0.757 OK
Minima 6982 936.6 4408 0.213 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 64.88 OK
Minima -245.8 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 2.629 OK 17.4 OK
Minima -0.08777 OK 0.633 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

4.0 Curtailment Check


4.1 Member Forces from STAAD at 19.0m below Bottom of Pile Cap

Static - LC 1001-1006
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31686 1005 1DL30746
+ 1SIDL +2211.878
1CL + 1PLA -15.476
+ 1PLB + 1.1TLA
5.505
+ 1.1TLB
-13.857
+ 1.1BTA +-32.115
1.1BTB -69.254
Min Fx 31655 1005 1DL30715
+ 1SIDL +881.059
1CL + 1PLA +-14.06
1PLB + 1.1TLA
4.738
+ 1.1TLB-9.431
+ 1.1BTA +-28.718
1.1BTB -61.338
Max Fy 31686 1006 1DL30746
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
7.945+ 1.1TLA
8.816
+ 1.1TLB17.655
- 1.1BTA --56.599
1.1BTB 22.293
Min Fy 31686 1005 1DL30746
+ 1SIDL +2211.878
1CL + 1PLA -15.476
+ 1PLB + 1.1TLA
5.505
+ 1.1TLB
-13.857
+ 1.1BTA +-32.115
1.1BTB -69.254
Max Fz 31655 1006 1DL30715
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
5.407+ 1.1TLA
11.343
+ 1.1TLB 28.29
- 1.1BTA - 1.1BTB
-69.46 10.375
Min Fz 31699 1005 1DL30758
+ 1SIDL +2211.878
1CL + 1PLA + 1PLB
0.529+ 1.1TLA
0.083
+ 1.1TLB
-13.857
+ 1.1BTA + -0.083
1.1BTB 0.529
Max Mx 31655 1006 1DL30715
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
5.407+ 1.1TLA
11.343
+ 1.1TLB28.29
- 1.1BTA - 1.1BTB
-69.46 10.375
Min Mx 31686 1005 1DL30746
+ 1SIDL +2211.878
1CL + 1PLA -15.476
+ 1PLB + 1.1TLA
5.505
+ 1.1TLB
-13.857
+ 1.1BTA +-32.115
1.1BTB -69.254
Max My 31668 1005 1DL30728
+ 1SIDL + 881.059
1CL + 1PLA + 1PLB
0.538+ 1.1TLA0.11
+ 1.1TLB-9.431
+ 1.1BTA + 1.1BTB0 0
Min My 31655 1006 1DL30715
+ 1SIDL +1608.486
1CL + 1PLA + 1PLB
5.407+ 1.1TLA
11.343
+ 1.1TLB 28.29
- 1.1BTA - 1.1BTB
-69.46 10.375
Max Mz 31686 1006 1DL30746
+ 1SIDL +1456.837
1CL + 1PLA + 1PLB
7.945+ 1.1TLA
8.816
+ 1.1TLB17.655
- 1.1BTA --56.599
1.1BTB 22.293
Min Mz 31686 1005 1DL30746
+ 1SIDL +2211.878
1CL + 1PLA -15.476
+ 1PLB + 1.1TLA
5.505
+ 1.1TLB
-13.857
+ 1.1BTA +-32.115
1.1BTB -69.254

ODE Seismic - LC 1001-1190, 2031-2078, 3031-3078, 4001-4032, 5009-5024 & 6009-6024


Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31655 1102 1DL30716
+ 1SIDL +5721.16
0.3CL + 0.3PLA
42.935
+ 0.3PLB115.259
+ 0.3TLA +219.365
0.3TLB - 0.3BTA
328.816
- 0.3BTB142.297
- 0.3SLX - 0.3SLY - 1S
Min Fx 31655 1095 1DL30716
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-50.076
+ 0.3PLB
-102.282
+ 0.3TLA -206.552
+ 0.3TLB + 0.3BTA
-395.747
+ 0.3BTB
-177.359
+ 0.3SLX + 0.3SLY +
Max Fy 31686 1086 1DL30747
+ 1SIDL +5239.018
0.3CL + 0.3PLA
107.48
+ 0.3PLB +48.799
0.3TLA +179.308
0.3TLB - 0.3BTA
144.445
- 0.3BTB327.924
- 1SLX - 0.3SLY - 0.3S
Min Fy 31686 1079 1DL30747
+ 1SIDL-1842.789
+ 0.3CL + 0.3PLA
-114.066
+ 0.3PLB-37.083
+ 0.3TLA -179.069
+ 0.3TLB + 0.3BTA
-205.629
+ 0.3BTB
-362.32
+ 1SLX + 0.3SLY + 0.
Max Fz 31655 1102 1DL30716
+ 1SIDL + 5721.16
0.3CL + 0.3PLA
42.935
+ 0.3PLB115.259
+ 0.3TLA +219.365
0.3TLB - 0.3BTA
328.816
- 0.3BTB142.297
- 0.3SLX - 0.3SLY - 1S
Min Fz 31655 3071 1DL30716
+ 1SIDL-3287.912
+ 0.3CL + 0.3PLB
-48.751
+ 0.3TLB-103.067
+ 0.3BTB
-206.417
+ 0.3SLX -393.676
+ 0.3SLY + 1SLZ
-173.872
+ 1.1NLB
Max Mx 31655 1102 1DL30716
+ 1SIDL + 5721.16
0.3CL + 0.3PLA
42.935
+ 0.3PLB115.259
+ 0.3TLA +219.365
0.3TLB - 0.3BTA
328.816
- 0.3BTB142.297
- 0.3SLX - 0.3SLY - 1S
Min Mx 31655 1095 1DL30716
+ 1SIDL-3301.013
+ 0.3CL + 0.3PLA
-50.076
+ 0.3PLB
-102.282
+ 0.3TLA -206.552
+ 0.3TLB + 0.3BTA
-395.747
+ 0.3BTB
-177.359
+ 0.3SLX + 0.3SLY +
Max My 31655 3071 1DL30715
+ 1SIDL +5535.872
0.3CL + 0.3PLB
38.951
+ 0.3TLB 112.672
+ 0.3BTB209.213
+ 0.3SLX +443.191
0.3SLY + 1SLZ
169.442
+ 1.1NLB
Min My 31655 1102 1DL30715
+ 1SIDL-3102.624
+ 0.3CL + 0.3PLA
-44.767
+ 0.3PLB
-100.481
+ 0.3TLA -196.264
+ 0.3TLB - 0.3BTA
-520.243
- 0.3BTB
-206.832
- 0.3SLX - 0.3SLY - 1S
Max Mz 31686 1007 1DL30746
+ 1SIDL +5283.491
1SLX + 0.3SLY
104.487
+ 0.3SLZ 47.796 174.276 187.027 423.991
Min Mz 31686 1014 1DL30746
+ 1SIDL-2004.236
- 1SLX - 0.3SLY
-110.672
- 0.3SLZ -37.183 -175.507 -253.229 -462.436
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

MDE Seismic - LC 1303-1326, 1427-1466, 1567-1590, 2101-2202, 2331-2378, 3131-3178,4101-4132, 5109-


5124, 6109-6124
Beam L/C Node Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
Max Fx 31655 2202 1.0DL
30716
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
56.365+ 0.3PLB
148.36
+ 0.3TLA
282.393
+ 0.3TLB 441.165
- 0.3BTA - 0.3BTB
188.857
- 0.3SLX - 0.3SLY
Min Fx 31655 2195 1.0DL
30716
+ 1.0SIDL
-4658.396
+ 0.3CL + -63.506
0.3PLA + 0.3PLB
-135.384
+ 0.3TLA
-269.579
+ 0.3TLB-508.096
+ 0.3BTA + 0.3BTB
-223.919+ 0.3SLX + 0.3SL
Max Fy 31686 2186 1.0DL
30747
+ 1.0SIDL
6358.695
+ 0.3CL +140.504
0.3PLA + 0.3PLB61.68
+ 0.3TLA
232.361
+ 0.3TLB - 198.32
0.3BTA - 0.3BTB
430.67
- 1SLX - 0.3SLY -
Min Fy 31686 2179 1.0DL
30747
+ 1.0SIDL
-2962.467
+ 0.3CL + -147.09
0.3PLA + 0.3PLB
-49.964
+ 0.3TLA
-232.122
+ 0.3TLB-259.504
+ 0.3BTA + 0.3BTB
-465.065+ 1SLX + 0.3SLY
Max Fz 31655 3147 1.0DL
30715
+ 1.0SIDL
6982.336
+ 0.3CL + 0.3PLA
52.602+ 0.3TLA
148.364
+ 0.3BTA
276.794
+ 0.3SLX
577.238
+ 0.3SLY 230.524
+ 1SLZ + 1.54NLA
Min Fz 31655 3171 1.0DL
30716
+ 1.0SIDL
-4656.693
+ 0.3CL + -62.238
0.3PLB + -136.457
0.3TLB + 0.3BTB
-269.877+ 0.3SLX
-505.089
+ 0.3SLY-220.698
+ 1SLZ + 1.54NLB
Max Mx 31655 2202 1.0DL
30716
+ 1.0SIDL
7078.543
+ 0.3CL + 0.3PLA
56.365+ 0.3PLB
148.36
+ 0.3TLA
282.393
+ 0.3TLB 441.165
- 0.3BTA - 0.3BTB
188.857
- 0.3SLX - 0.3SLY
Min Mx 31655 3171 1.0DL
30716
+ 1.0SIDL
-4656.693
+ 0.3CL + -62.238
0.3PLB + -136.457
0.3TLB + 0.3BTB
-269.877+ 0.3SLX
-505.089
+ 0.3SLY-220.698
+ 1SLZ + 1.54NLB
Max My 31655 3171 1.0DL
30715
+ 1.0SIDL
6881.857
+ 0.3CL + 0.3PLB
52.323+ 0.3TLB
145.486+ 0.3BTB
271.807+ 0.3SLX
589.846
+ 0.3SLY +228.788
1SLZ + 1.54NLB
Min My 31655 2202 1.0DL
30715
+ 1.0SIDL
-4460.007
+ 0.3CL + -58.197
0.3PLA + 0.3PLB
-133.583
+ 0.3TLA
-259.292
+ 0.3TLB-665.674
- 0.3BTA - 0.3BTB
-266.503
- 0.3SLX - 0.3SLY
Max Mz 31686 2107 1.0DL
30746
+ 1.0SIDL
6403.169
+1SLX + 0.3SLY
137.511+ 0.3SLZ60.677 227.328 253.697 559.706
Min Mz 31686 2114 1.0DL
30746
+ 1.0SIDL
-3123.914
- 1SLX - 0.3SLY
-143.695
- 0.3SLZ-50.064 -228.56 -319.898 -598.151

ODE MDE
Maximum Tension Force (kN) -3301.01 -4658.4
Skin Friction (kN) 2665.33
Final Axial Load (kN) -635.68 -1993.06

4.2 ULS & SLS Design Checks

Design checks for ULS adequacy, SLS stresses and surface crack width have been checked in Oasys.

Reinforcement Provided

Dia. (mm) Nos.


29 16

4.2.1 Oasys Results

ULS Adequacy for MDE

N M Mu
Case M/Mu
[kN] [kNm] [kNm]
Maxima -1795 717 1045 0.686 OK
Minima 7079 479.9 3456 0.139 OK
Project JMRT
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc. No. - Checked Varun
Title Design of Piles Verified Sumant

Reinforcement Stresses for ODE

Permissible stress = Yield stress / 1.15 = 390 / 1.15 = 339.13 N/mm2


From Oasys,
Stress in Reinforcement
Case
[N/mm²]
Maxima 47.75 OK
Minima -146.3 OK

Material Stresses for Static Case

Permissible Stresses Concrete 0.5fcu 20.000 N/mm2


Steel 0.75fy 292.500 N/mm2
(from table 2, pg. 8, BS 5400-4: 1990, for stress due to bending)

Stress in Concrete Stress in Reinforcement


Case
[N/mm²] [N/mm²]
Maxima 2.27 OK 15.57 OK
Minima 0.3633 OK 3.166 OK

Surface Crack Width for Static Case

From Table 1, pg. 7, BS 5400-4: 1990, for buried parts of structure with severe exposure,
Permissible Crack Width = 0.250 mm
Maximum Crack Width per Face from Oasys = 0.000 mm OK
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Appendix B

PILE CAP DESIGN CALCULATIONS

TWJO-1-TCD-ST1-0004-Rev A-A6 Appendix B


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Varun
Title Design of Pile Cap Verified Sumant

PILE CAP FOR GROUP PG1K


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Rahul
Doc No - Checked Varun
Title Design of Pile Cap Verified Sumant

1.0 INPUT DATA

Pile Group = PG1K

No. of piles n = 1
Dia of pile = 1.00 m
Size of Column = 2.80 m x 0.90 m
Grade of concrete = C40/50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Area of pile cap = 4.20 m2


Depth of pile cap D = 1.90 m
Volume of pile cap = 7.98 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 199.50 kN

Thickness of Earthfill over pile cap = 1.50 m


Volume of Earthfill over pile cap = 2.52 m3
Density of Earth = 20 kN/cum
Weight of Earthfill = 50.40 kN

Total weight of (Pile cap + Earthfill) = 249.90 kN

2.0 Bottom Reinforcement


Bottom Reinforcement should be 0.06% of cross-sectional area.
Required Steel = 1090.2 mm2/m
Dia 16 Spacing 175 Provided = 1149 mm2/m
OK

3.0 Top Reinforcement


Top Reinforcement should be 0.06% of cross-sectional area.
Required Steel = 1090.2 mm2/m
Dia 16 Spacing 175 Provided = 1149 mm2/m
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Varun
Title Design of Pile Caps Verified Sumant

PILE CAP FOR GROUP PG2A


Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Varun
Title Design of Pile Caps Verified Sumant

1.0 INPUT DATA

Pile Group = PG2A

No. of piles n = 2
Dia of pile = 1.20 m
Centre to centre distance of pile = 3.60 m
Grade of concrete = C50
Grade of steel = Fe390
Clear cover to the reinforcement = 75 mm

Size of pile cap = 4.245 m x 4.250 m


Area of pile cap = 18.04 m2
Depth of pile cap D = 2.05 m
Volume of pile cap = 36.98 m3
Density of RCC = 25.00 kN/cum
Weight of pile cap = 924.61 kN

Thickness of Earthfill over pile cap = 0.00 m

Total weight of (Pile cap + Earthfill) = 924.61 kN

2.1 Moment in Longitudinal Direction:

Case Moment from STAAD (kN.m)


ULS 8604.061
SLS Stress Check 6799.023
SLS Crack Width Check 1290.530

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.011 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1962.50 mm
Hence, z = 0.950 d = 1864.375 mm
As = Mu / (0.87fy z)
Design stress in reinforcement has been taken as 0.87fy, using a material strength reduction factor of 1.15 as per Table 23, pg.
37 of the Design Manual.
Ast = 13601 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 100 0 0 0 0

= 20376 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Varun
Title Design of Pile Caps Verified Sumant

2.2 Moment Capacity, Stress and Crack width check from Oasys for Longitudinal Direction

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 8604. 14020 0.6136 OK
Minima
1 0.0 8604. 14020 0.6136 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 4.425 OK 1 23.18 OK
1 4.425 OK 1 23.18 OK
Minima Minima
1 -0.581 OK 1 -112.4 OK
1 -0.581 OK 1 -112.4 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.005 mm OK

2.3 Moment in Transverse Direction:

Case Moment from STAAD (kN.m)


ULS 9557.274
SLS Stress Check 7399.277
SLS Crack Width Check 1601.108

As per Cl. 3.4.4.4, pg. 28, BS 8110-1:1997,


K' = 0.156
K = Mu/bd2fcu = 0.012 K'
Hence, compression reinforcement is not required.
z = d [ 0.5 + ( 0.25 - K/0.9 )], but not greater than 0.95d.
Here, effective depth of pile cap, d = 1962.50 mm
Hence, z = 0.950 d = 1864.375 mm
As = Mu / (0.87fy z)
Ast = 15108 mm2

Astprovided = Dia Spacing Dia Spacing Dia Spacing


25 100 0 0 0 0

= 20352 mm2 OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Varun
Title Design of Pile Caps Verified Sumant

2.4 Moment Capacity, Stress and Crack width check from Oasys for Transverse Direction

a) Moment Capacity Check:


Oasys Results
Case N M Mu M/Mu
[kN] [kNm] [kNm]
Maxima
1 0.0 9557. 14030 0.6814 OK
Minima
1 0.0 9557. 14030 0.6814 OK

b) Stress Check:
Permissible stresses
Concrete 0.5fck 25.000 MPa
Steel 0.75fy 292.500 MPa

Oasys Results
Section Material stresses at SLS Loads Reinforcement stresses at SLS Loads
Case Stress Case Stress
[N/mm²] [N/mm²]
Maxima Maxima
1 4.892 OK 1 25.43 OK
1 4.892 OK 1 25.43 OK
Minima Minima
1 -0.5808 OK 1 -128.5 OK
1 -0.5808 OK 1 -128.5 OK

c) Crack Width Check:


Permissible crack width = 0.250 mm
Oasys Results
Design surface crack width = 0.007 mm OK

2.5 Minimum reinforcement on tension face


As per Cl. 9.2.1.1, pg. 152, EN 1992-1-1: 2004 (E),
Minimum area of longitudinal tension reinforcement, As,min = 0.26 (fctm/fyk) btd
From Table 3.1, pg. 29, EN 1992-1-1: 2004 (E), for C50 concrete, fctm = 3.5 N/mm2
Hence, As,min = 0.26*(3.5/390)*b*d = 0.234/100*b*d = 4592.25 mm2/m
In longitudinal direction, Provided = 4794 mm2/m
Astprovided > Astmin OK
2
In transverse direction, Provided = 4794 mm /m
Astprovided > Astmin OK

3.0 Top Reinforcement


Top Reinforcement should be 0.234% of cross-sectional area.
Required Steel = 4592.25 mm2/m
In longitudinal direction,
Dia 25 Spacing 100 Provided = 4794 mm2/m
OK
In transverse direction,
Dia 25 Spacing 100 = 4794 mm2/m
Provided
OK
Project JMRT Sheet
Client TWJO
Job Design of Stations
Station Lebak Bulus Prepared Jai
Doc No - Checked Varun
Title Design of Pile Caps Verified Sumant

4.1 Shear Check in Longitudinal Direction


Shear force from STAAD Vu = 4806 kN
Width of pile cap available b = 1.700 m
Effective depth of pile cap d = 1.963 m
Area of tensile steel provided As = 8150 mm2
0.008 m2
Percentage of tensile steel provided 100As/(b.d) = 0.244 %
Shear stress = Vu /(b . d) = 1440.48 kN/sqm
Grade of concrete = C40/50
Design shear resistance is calculated as per Cl. 3.11.4.4, pg. 82, BS 8110-1: 1997.
Shear strength of concrete, vc = 0.31 MPa
310 kN/sqm
Vus = Vu - vc b d = 3771.58 kN
Requirement of shear reinforcement = Required
Dia of stirrup 13 mm
No. of legs 16
Spacing required 281 mm
As per Cl. 3.11.4.4, pg. 82, and from Table 3.16, pg. 46, BS 8110-1-1: 1997,
Maximum permissible spacing = 795 mm
Provided spacing 211.25 mm
OK

4.2 Shear Check in Transverse Direction


Shear force from STAAD Vu = 4910 kN
Width of pile cap available b = 1.700 m
Effective depth of pile cap d = 1.963 m
Area of tensile steel provided As = 8150 mm2
0.008 m2
Percentage of tensile steel provided 100As/(b.d) = 0.244
Shear stress = Vu /(b . d) = 1471.82 kN/sqm
Grade of concrete = 50
Shear strength of concrete, vc = 0.31 MPa
310 kN/sqm
Vus = Vu - vc b d = 3876.13 kN
Requirement of shear reinforcement = Required
Dia of stirrup 13 mm
No. of legs 6
Spacing required 103 mm
As per Cl. 3.11.4.4, pg. 82, and from Table 3.16, pg. 46, BS 8110-1-1: 1997,
Maximum permissible spacing = 298 mm
Provided spacing 100 mm
OK
TOKYU-WIKA JOINT OPERATION
Jakarta Mass Rapid Transit Projects CP101 Lebak Bulus Station Foundation Design

Appendix C

PILE CAPACITY & SETTLEMENT CALCULATIONS

TWJO-1-TCD-ST1-0004-Rev A-A6 Appendix C


Project : JMRT CP101
Designed : xxx
PILE BEARING CAPACITY Checked : DAP
Date : 8-Apr-2016

Site Location : Lebak Bulus station 1 x 1000


Pile Group Category : Load Category: EA
BH Ref. : 1 ABH-4 Pile Type : Bored Pile C105 & PG1K
BH Elevation : 35.3 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
w : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 21.81 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.81 47 0.6 188 188 325 325 1

1
1
1
1
1

Total 13.5 2703 2634


PILE LENGTH
Ultimate Skin Friction, Qs (kN) = 2,703 2,634

B) END BEARING
Pile Depth 13.5 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe AC3 Unit End Bearing 2115 kN/m2
SPT-N Value at Pile Toe 47 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Qb (kN) = 1,661

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to 1 - sin =1 NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 1,745 1,351 1,756 4,295 901 1,317 1,756

E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 1,351 kN Static (kN) 925 OK 0
ODE 1,756 kN ODE (kN) 1245 OK 0
MDE 4,295 kN MDE (kN) 1308 OK 0
Project : JMRT CP101
Designed : xxx
PILE SETTLEMENT Checked : DAP
Date : 8-Apr-2016

Site Location : Lebak Bulus station Pile Ref. : 1 x 1000


BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 )
= +
2 4

Load in the pile shaft Ws 925 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 13.5 m
Pile width B 1.00 m
Poisson’s ratio of the soil 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 0.28 mm
2) Long Term Settlement 0.57 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 0.28 mm
2) Long Term Settlement 0.57 mm
Project : JMRT CP101
Designed : xxx
PILE BEARING CAPACITY Checked : DAP
Date : 8-Apr-2016

Site Location : Lebak Bulus station 1 x 1000


Pile Group Category : Load Category: LA
BH Ref. : 1 ABH-4 Pile Type : Bored Pile PG2A
BH Elevation : 35.3 mRL Concrete Grade, fcu : 40 N/mm2
GWT : 33.4 mRL Pile Diameter : 1.00 m
w : 9.8 kN/m3 Pile Cut-off Level : 35.275 mRL
Pile Toe Level : 5.28 mRL
A) SKIN FRICTION
SPT-N Unit Skin Friction Shaft Friction Resistance Skin Friction
Soil Type Level from Level to Shaft Length
Average (0 or 1)
Static Seismic Static Seismic
(mRL) (mRL) (m) (kN/m2) (kN/m2) (kN/m2) (kN/m2)
AC1 35.28 28.36 3.5 6.9 16 13 342 274 1
AC3 28.36 24.36 22 4.0 88 88 1,106 1,106 1
AC3 24.36 22.36 37 2.0 148 148 930 930 1
AC3 22.36 21.91 47 0.4 188 188 266 266 1
AC3 21.91 16.86 16.5 5.1 66 66 1,047 1,047 1
TS 16.86 13.36 45.5 3.5 137 137 1,501 1,501 1
TC 13.36 12.36 48 1.0 192 192 603 603 1
TC 12.36 11.36 50 1.0 200 200 628 628 1
TS 11.36 9.36 50 2.0 150 150 942 942 1
TC 9.36 5.28 48.75 4.1 195 195 2,505 2,505 1
1

Total 30.0 9870 9802


PILE LENGTH
Ultimate Skin Friction, Qs (kN) = 9,870 9,802

B) END BEARING
Pile Depth 30.0 m Limiting End Bearing 4000 kN/m2
Soil Material at Pile Toe TC Unit End Bearing 2194 kN/m2
SPT-N Value at Pile Toe 48.75 Area of Toe 0.79 m²
End Bearing Multiplier 45

Ultimate End bearing, Qb (kN) = 1,723

C) NEGATIVE SKIN FRICTION (NSF)


Skin Friction
Soil Level from Level to 1 - sin =1 NSF
(0 or 1)
(mRL) (mRL) (kN/m2)
AC1 35.3 31.1 15.5 0.63 22 0 0
0
0
0
0
0

Total Negative Skin Friction (kN) = 0

D) GEOTECHNICAL CAPACITY
Factor of Compression Tension
Safety Static Static ODE MDE Static ODE MDE
Skin Friction 2.50 2.00 1.50 1.00 3.00 2.00 1.50
End Bearing 2.50 1.00
Geotechnical
Capacity (kN) 4,637 4,935 6,535 11,525 3,290 4,901 6,535

E) STRUCTURAL CAPACITY
Static 7,854 kN
ODE 7,854 kN
MDE 12,566 kN
G) WORKING LOAD
F) PILE CAPACITY Compression Capacity Check Tension Capacity Check
Static 4,637 kN Static (kN) 2212 OK 0
ODE 6,535 kN ODE (kN) 6436 OK 2658 OK
MDE 11,525 kN MDE (kN) 7830 OK 4043 OK
Project : JMRT CP101
Designed : xxx
PILE SETTLEMENT Checked : DAP
Date : 8-Apr-2016

Site Location : Lebak Bulus station Pile Ref. : 1 x 1000


BH Ref. : 1 ABH-4 Pile Type : Bored Pile

PILE SETTLEMENT (TOMLINSON, 1994)

( ) 2
+2 (1 )
= +
2 4

Load in the pile shaft Ws 2,212 kN


Load in the pile base Wb 0 kN
Cross-sectional area of the shaft As 0.79 m²
Cross-sectional area of the base Ab 0.79 m²
Elastic modulus of the pile (Short Term) Ep 2.80E+07 kN/m2
Elastic modulus of the pile (Long Term) Ep 1.40E+07 kN/m2
Deformation modulus of soil beneath pile base Eb 1.00E+05 kN/m2
Shaft length L 30.0 m
Pile width B 1.00 m
Poisson’s ratio of the soil 0.3
Influence factor related to the ratio of L/B IP 0.8

A) PILE SETTLEMENT DUE TO ELASTIC SHORTENING OF THE PILE SHAFT


1) Short Term Settlement 1.51 mm
2) Long Term Settlement 3.02 mm

B) PILE SETTLEMENT DUE TO COMPRESSION OF SOIL BENEATH BASE 0.00 mm

C) TOTAL PILE SETTLEMENT AT WORKING LOAD


1) Short Term Settlement 1.51 mm
2) Long Term Settlement 3.02 mm
FATMAWATI STATION
10 11 12 13 14 15 16 17

A1

COLUMN LAYOUT AT GROUND LEVEL


SCHEDULE OF COLUMNS

NOTES STRUCTURE REFERENCE DRAWING:

IN CONJUNCTION WITH THIS DRAWING NO.


9

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
COLUMN LAYOUT PLAN
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 2)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3002 9 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3002-9.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\003. FRAMING PLANS\1-STN-STR-3002-9.DWG


1 2 3 4 5 6 7 8 9 10 11

1 2 1 2 1 2 1 2 1 2 1 2
B 3 4 3 4 3 4 3 4 3 4 3 4

A1

PILE GROUP LAYOUT

1 1 2 2

3 3
PG1 PILE LAYOUT PLAN PG1A PILE LAYOUT PLAN

PG1B, PG1H & PG1K PILE LAYOUT PLAN


15
11 SECTION 3-3

NOTES:-
SECTION 4-4

A
SECTION 1-1 SECTION 2-2

IN CONJUNCTION WITH THIS DRAWING NO. 4 STRUCTURE REFERENCE DRAWINGS: PG1G & PG1J PILE LAYOUT PLAN
PLAN SHOWING PILE LAYOUT
FOR PILE GROUP PG1C

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE LAYOUT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 1 OF 4)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3016 15 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3016-15.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\004. PILE, PILE CAP\1-STN-STR-3016-15.DWG


12 13 14 15 16 17

1
15

A1
C 2
1
* PLAN SHOWING PILE LAYOUT PLAN SHOWING PILE LAYOUT
15 FOR PILE GROUP PG1D FOR PILE GROUP PG1E

1 2 1 2 1 2
B 3 4 3 4 3 4

A1
SECTION 2-2
SECTION 1-1
15
PILE GROUP LAYOUT
STRUCTURE REFERENCE DRAWING:

15
NOTES:-

3 1 3

PG2A PILE LAYOUT PLAN


PG1F PILE LAYOUT PLAN SECTION 4-4

SECTION 3-3 IN CONJUNCTION WITH THIS DRAWING NO.

* ENSURED THIS PILE MAY BE REPLACED BY A OPEN FOUNDATION.


THE DIMENSION/DETAIL OF WHICH WOULD BE GIVEN ON THE CONFIRMATION.

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE LAYOUT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 4)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3017 15 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3017-15.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\004. PILE, PILE CAP\1-STN-STR-3017-15.DWG


REINFORCEMENT DETAILS OF PILE
A COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

** DEPTH OF PILE CAP

13

2 2

ANCHORAGE LENGTH
FOR SINGLE BARS

13
NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 2 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3022 13 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3022-13.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\004. PILE, PILE CAP\1-STN-STR-3022-13.DWG


A

REINFORCEMENT DETAILS OF PILE


COLUMN / PILE GROUP BAR MARKED
MARKED

1 1

4
2 2

3 3

4 4

ANCHORAGE LENGTH
FOR 2 BUNDLE BARS
** DEPTH OF PILE CAP
4 4

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 3 OF 5)
DIRECTOR OF
CONSTRUCTION
AS SHOWN 1/STN/STR/3023 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3023-4.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\004. PILE, PILE CAP\1-STN-STR-3023-4.DWG


2
2 B

LONGITUDINAL LONGITUDINAL
AXIS AXIS

1 1 1 1 LONGITUDINAL
1 1 AXIS
A A
2
2

PG1B, PG1H & PG1K PILE LAYOUT PLAN PG1G & PG1J PILE LAYOUT PLAN
7

SECTION 1-1 SECTION 1-1

LEGEND :

SECTION 2-2 SECTION 2-2

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 3 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3028 7 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3028-7.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\004. PILE, PILE CAP\1-STN-STR-3028-7.DWG


PG2A PILE LAYOUT PLAN

LEGEND :

NOTES:

ENDORSED BY Construction of Jakarta Mass Rapid Transit Project


PT MRT Jakarta Contract CP 101

APPROVED BY NOTICED BY NAME SIGNATURE


01 LEBAK BULUS STATION
PILE CAP REINFORCEMENT
PRESIDENT DIRECTOR
VERIFIED BY (SHEET 5 OF 10)
DIRECTOR OF
CONSTRUCTION
1:200 1/STN/STR/3030 4 T
DESIGNED BY
PROJECT MANAGER
PT. AECOM INDONESIA 1-STN-STR-3030-4.DWG

N:\PROJECTS\2014\03-TRANSPORT\DELD114050\06_CAD\001. DRAWINGS\003. STR DWG\001. LBS\004. PILE, PILE CAP\1-STN-STR-3030-4.DWG