1 IS/UGC01/PKG11/00001 31-May-18
2 IS/UGC01/PKG11/00002 9-Jul-18
3 IS/UGC01/PKG11/00003 26-Jul-18
4 IS/UGC01/PKG11/00004 30-Jul-18
5 IS/UGC01/PKG11/00005 1-Sep-18
6 IS/UGC01/PKG11/00006 10-Sep-18
7 IS/UGC01/PKG11/00007 10-Sep-18
8 IS/UGC01/PKG11/00008 20-Sep-18
9 IS/UGC01/PKG11/00009 20-Sep-18
10 IS/UGC01/PKG11/00010 1-Oct-18
11 IS/UGC01/PKG11/00011 29-Sep-18
12 IS/UGC01/PKG11/00012 29-Sep-18
13 IS/UGC01/PKG11/00013 29-Sep-18
14 IS/UGC01/PKG11/00014 12-Sep-18
15 IS/UGC01/PKG11/00015 18-Sep-18
16 IS/UGC01/PKG11/00016 18-Sep-18
17 IS/UGC01/PKG11/00017 10-Sep-18
18 IS/UGC01/PKG11/00018 5-Oct-18
19 IS/UGC01/PKG11/00019 1-Oct-18
20 IS/UGC01/PKG11/00020 12-Oct-18
21 IS/UGC01/PKG11/00021 24-Oct-18
22 IS/UGC01/PKG11/00022 1-Nov-18
23 IS/UGC01/PKG11/00023 30-Nov-18
24 IS/UGC01/PKG11/00024 10-Dec-18
25 IS/UGC01/PKG11/00025 18-Dec-18
26 IS/UGC01/PKG11/00026 27-Dec-18
27 IS/UGC01/PKG11/00027 27-Dec-18
28 IS/UGC01/PKG11/00028 29-Dec-18
29 IS/UGC01/PKG11/00029 29-Dec-18
IS/UGC01/PKG11/00029-R01 25-Jan-19
IS/UGC01/PKG11/00029-R02 12-Feb-19
30 IS/UGC01/PKG11/00030 7-Jan-19
31 IS/UGC01/PKG11/00031 22-Jan-19
32 IS/UGC01/PKG11/00032 22-Jan-19
33 IS/UGC01/PKG11/00033 26-Jan-19
34 IS/UGC01/PKG11/00034 30-Jan-19
35 IS/UGC01/PKG11/00035 14-Feb-19
MOM Follow Up
Follow up from POS
S. NO. Dept. Discussion Point
UGC01 shared station electrical load for Response to our ISF - OCS-
UGC01-ISF-0002-R00
finalization of transformer sizing of all We replied by OCS-UGC01-ISF-
four station under them. 0016-R00
UGC01 shared CSD & SEM drawings for Response to our ISF - OCS-
cuffe Parade Station. Launching area- UGC01-ISF-0002-R00
GL, 20-24 for Cuffe parade station.
UGC01 shared CSD & SEM drawings for Response to our ISF - OCS-
cuffe Parade Station NATM side (GL C12 UGC01-ISF-0002-R00
to C6)
UGC01 shared total electrical load the Response to our ISF - OCS-
cuffe parade station. UGC01-ISF-0002-R00
UCG-01 replied to our ISF (ISF-OCS- They Replied to our ISF - ISF-
UGC01-ISF-0011-R00) provided out OCS-UGC01-ISF-0011-R00
Urgent input requirments
UGC-01 shared Equipment delievery
routing drawings (CAD & PDF) for
bringing all heavy equipment from
street level to Respective locations for
Cuffe Parade station.
OM Follow Up
ow up from POS
Action Action Date
We have to share the Typical bracket 22-Jan
drawing.
POS have to share the SLD to UGC-01for 22-Jan
the reference and records.
We have received the Total load, UGC-
01 reuested to confirm the transformer 21-Jan
rating.
ow up from OCS
Action Action Date
Design the Type of Drop Arm We have to Provide the details by 1-Mar-
3 T2.2- OH/UG-07 and shall fix in accordingly 2019
Design and furnish the span We have to Provide the details by 1-Mar-
4 T2.2- OH/UG-08 of Drop Arms of OHE. 2019
MOM Follow Up
Follow up from POS
S. NO. Dept. Discussion Point Action
Discussed and size of the pull pit has
been agreed. UGC 02 informed to
maintain a clearance of 700 mm from
the wall. POS team to check as per
1 POS Pull Pit Drawing comment of UGC 02.
Action Date
22-Jan-19
Depends on PSS
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
20.Feb.2019)
Status Remarks
15-Feb-19
Transformer
Neutral earthing
to be concluded
63 A for ACBD 3
phase supply. No
requirement for
DCDB 45283.14
MOM Follow Up
Follow up from POS
S. NO. Dept. Discussion Point Action
OCS to provide technical details
required for short circuit
1 POS Transfomer Rating details calculation on secondary side.
Depends on PSS
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
1-Mar-19
Feb.2019)
Status Remarks
Related to OCS
63 A is required for
ACDB. No
requirement for
DCDB. Muthuvel sir
to share.
ISF Summary : From UGC-04 To OCS-11A (As on 20.Feb.201
Sl No ISF Number Date
1 UGC04-OCS-ISF-00001-R00 20-Sep-18
2 UGC04-OCS-ISF-00002-R00 26-Sep-18
3 UGC04-OCS-ISF-00003-R00 26-Sep-18
4 UGC04-OCS-ISF-00004-R00 26-Sep-18
5 UGC04-OCS-ISF-00005-R00 26-Sep-18
6 UGC04-OCS-ISF-00006-R00 To Check
7 UGC04-OCS-ISF-00007-R00 3-Oct-18
8 UGC04-OCS-ISF-00008-R00 3-Nov-18
9 UGC04-OCS-ISF-00009-R00 20-Nov-18
10 UGC04-OCS-ISF-00010-R00 24-Nov-18
11 UGC04-OCS-ISF-00011-R00 To Check
12 UGC04-OCS-ISF-00012-R00 4-Dec-18
13 UGC04-OCS-ISF-00013-R00 29-Jan-19
14 UGC04-OCS-ISF-00014-R00 29-Jan-19
MOM Follow Up
Follow up from POS
S. NO. Dept. Discussion Point
Transformer Loading
1 POS Details
Architectural layout
2 POS (Dadar)
Tunnel segment
3 OCS drawing
UGC-04 shared BIM 3d Model, latest rivision of Reply to our ISF - OCS-
architechtural and structural drawings, and Electrical UGC04-ISF-0002-R00
load.
UGC-04 shared ASS Equipment layout and some other Reply to our ISF - OCS-
details. UGC04-ISF-0005-R00
UGC04 required confirmation from our side regarding the We Replied by ISF - OCS-
pull-pit UGC04-ISF-0010-R00
UGC04 required confirmation from our side regarding the We Replied by ISF - OCS-
pull-pit changes. UGC04-ISF-0010-R00
UGC04 required confirmation from our side regarding We Replied by ISF - OCS-
ROCS length and anchoring in purpose. UGC04-ISF-0007-R00
UGC-04 shared drawings which are part of Definitive
Design submission for Siddhivinayak station.
MOM Follow Up
Follow up from POS
Action Action Date Remarks
POS team has shared the transformer details comments
to Interface team, We have to forward to UGC-04 No action from POS
We have to to share the ACDB & DCDB Load in ASS to 63 A is required for ACDB.
UGC-04 No requirement for DCDB.
Information
UGC05-OCS-ISF-0012-R00
Attachment missing in share point.
UGC05-MEP-SVN-1381-002 drawing
checked. Requriement are fulfilled. Similar
size pull pit are required on other side of the
platform.
Action Date
1-Feb-19
ISF Summary : From UGC-06 To OCS-11A (As on 20.Feb.
Sl No ISF Number Date
1 P06/OCS/ISF/0001/R00 9-Jun-18
2 P06/OCS/ISF/0002/R00 8-Aug-18
3 P06/OCS/ISF/0003/R00 8-Aug-18
4 P06/OCS/ISF/0004/R00 24-Aug-18
5 P06/OCS/ISF/0005/R00 25-Aug-18
6 P06/OCS/ISF/0006/R00 28-Aug-18
7 P06/OCS/ISF/0007A/R00 31-Aug-18
8 P06/OCS/ISF/0007B/R00 31-Aug-18
9 P06/OCS/ISF/0007C/R00 31-Aug-18
10 P06/OCS/ISF/0008/R00 11-Sep-18
11 P06/OCS/ISF/0009/R00 11-Sep-18
12 P06/OCS/ISF/0010/R00 (Hold) 11-Sep-18
14 P06/OCS/ISF/0012A/R00 13-Sep-18
15 P06/OCS/ISF/0012B/R00 13-Sep-18
16 P06/OCS/ISF/0012C/R00 13-Sep-18
17 P06/OCS/ISF/0013/R00 14-Sep-18
18 P06/OCS/ISF/0014/R00(Hold) 14-Sep-18
19 P06/OCS/ISF/0015/R00(Hold) 15-Sep-18
21 P06/OCS/ISF/0017/R00 17-Sep-18
22 P06/OCS/ISF/0018/R00 17-Sep-18
23 P06/OCS/ISF/0019/R00 20-Sep-18
24 P06/OCS/ISF/0020/R00 11-Jan-19
25 P06/OCS/ISF/0021/R00 15-Jan-19
26 P06/OCS/ISF/0022/R00 17-Jan-19
27 P06/OCS/ISF/0023/R00 24-Jan-19
28 P06/OCS/ISF/0024/R00 25-Jan-19
P06/OCS/ISF/0024/R01 30-Jan-19
P06/OCS/ISF/0024/R02 13-Feb-19
29 P06/OCS/ISF/0025/R00 28-Jan-19
30 P06/OCS/ISF/0026/R00 29-Jan-19
31 P06/OCS/ISF/0027/R00 29-Jan-19
32 P06/OCS/ISF/0028/R00 30-Jan-19
Email 16-Jan-19
Email 30-Jan-19
Email 7-Feb-19
Email 12-Feb-19
Email 12-Feb-19
33 P06/OCS/ISF/0029/R00 14-Feb-19
MOM Follow Up
Follow up from POS
S. NO. Dept Discussion Point
1 POS
UGC 06 latest
equipment layout.
2 POS Hoisting Hook drawing
3 POS
Typical Bracket
Drawing
We replied by OCS-UGC06-ISF-0005-
UGC06 sent segregated Sahar Road Station (SSR) status 'C' from R00
GC/MPPLE - ASS rooms layout from the list of drawings sent to us Sahar Road is signed off, as GC
previously for our review and comments. Requested us to give requested for some modification, Rest
our comments by 10-sept-18. drawings are pending for sign off.
UGC06 sent segregated International Station (SC2) status 'C' from Sahar Road is signed off, as GC
GC/MPPLE - ASS rooms layout from the list of drawings sent to us requested for some modification, Rest
previously for our review and comments. Requested us to give drawings are pending for sign off.
our comments by 10-sept-18.
UGC06 shared Architectural drawings(BIM) of Domestic Station, Reply to our ISF OCS-UGC06-ISF-0004-
Sahar road station &International Station (SC2) to us. R01
UGC06 shared PD structural drawings (BIM) of Domestic station, Reply to our ISF OCS-UGC06-ISF-0004-
Sahar road station & international station to us. R01
UGC06 shared electrical drawings (MEP-Design for International
station to us.
UGC06 shared approved "status C" Interface Management Plan to Information
us
UGC06 shared Sahar Rod Station- E&M CSD Drawings(Undercroft
level)& International station - E&M CSD Drawings (undercroft
level) to us.
UGC06 Shared Construction program of Base slab (tentative) for
all 3 stations to us.
UGC-06 shared preliminary design submission of Tunnel E&M
drawings.
Response to our ISF OCS-UGC06-ISF-
UGC-06 shared our Urgent ROCS requirments. 0010-R00
ASS room Layout for SC1, SSR and SC2. UGC-06 requested Alstom Hook locations to be marked by Mr.
Bhagwan Singh & Mr. Manish in latest
to Mark Hook location in Achitectural drawings. Architectural drawings.
UGC-06 shared Electrical Load Details PD Stage ( Status –C ) to us Response to our ISF OCS-UGC06-ISF-
on 28-08-2018. Electrical Load Details DD Stage (Advance copy ) 0013-R01
presently shared by writing on our ISF OCS-UGC06-ISF-0013-R01
UGC-06 shared all equpiment layouts and CCF, by writing on our Response to our ISF - OCS-UGC06-ISF-
ISF- OCS-UGC06-ISF-0015-R00 0015-R00
UGC-06 shared type of tripping and protection for SSR, by writing Response to our ISF OCS-UGC06-ISF-
on our ISF OCS-UGC06-ISF-0016-R00 0016-R00
UGC-06 shared type of tripping and protection for SSR,as a reply Response to our ISF OCS-UGC06-ISF-
to our ISF OCS-UGC06-ISF-0016-R00 0016-R00
MOM Follow Up
Follow up from POS
Action Action Date
UGC 06 had revised their Equipment layout drawing as per
meeting held on Oct 30, 2018 and received 'C' on their
architectural layout DD drawings and MEP PD drawings.
Latest equipment layout have been discussed with UGC 06 All equipment layouts have been
and they have agreed to accept the changes, after GC
provides 'C' status of PD drawings of OCS contractor. signed off on feb 25.
UGC-06 contractor has already shared the architectural
drawing with hook position marked on ACAD DD drawings.
POS team to judge the suitablity if the location of these Hoisting hook location to be provided
by Installation Manager/Engineer.
hooks are OK and is adviced to change/indicate as requried
by them
The bracket drawing has been discussed and interfaced.
P06/OCS/
ISF/0001/
R00
P06/OCS/
ISF/0001/
R00
P06/OCS/
ISF/0001/
R00
Satish sir to update
OCS-UGC07 follow up sheet based on Interface item number as per Meeting with GC 14
S.no Interface Item Number Discussion Point
Cable route inside the Ramp & entry to the
Ramp Zone for 33 kV, 25 kV & traction return
1 T7.1- PS/UG-04(N1) cables etc.
1 UGC07-OCS-ISF-0002-R00 11-Sep-18
2 UGC07-OCS-ISF-0008-R00 11-Dec-18
3 UGC07-OCS-ISF-0009-R00 24-Dec-18
4 UGC07-OCS-ISF-0011-R00 28-Jan-19
5 UGC07-OCS-ISF-0013-R00 1-Feb-19
MOM Follow Up
Follow up from POS
S. NO. Dept Discussion Point
Equipment and earthing layout of all three
1 POS stations.
MOM Follow Up
Follow up from POS
Action Action Date Remarks
We have received 'C' status on Shared the approved
equipment layout, same will be share layout along with DSR
with UGC-07. CCF can be signed off. in which 'C' status is
13-Feb-19 provided.
1 ISF_RST-OCS-ISF-0001-R01 28-Dec-18
2 ISF_RST-OCS-ISF-0002-R01 28-Dec-18
3 ISF_RST-OCS-ISF-0003-R01 28-Dec-18
om RST To OCS-11A (As on 20.Feb.2019)
Desciption Remarks
1 PSS-OCS-ISF-0001-R00 8-Aug-18
2 PSS-OCS-ISF-0002-R00 24-Oct-18
3 PSS-OCS-ISF-0003-R00 13-Dec-18
PSS-OCS-ISF-0004-R00 (Old)
4 31-Dec-18
(Received on 02.01.2019)
PSS-OCS-ISF-0004-R00 2-Jan-19
5 PSS-OCS-ISF-0005-R00 18-Jan-19
6 PSS-OCS-ISF-0006-R00 21-Jan-19
7 PSS-OCS-ISF-0007-R00 21-Jan-19
8 PSS-OCS-ISF-0008-R00 31-Jan-19
9 PSS-OCS-ISF-0009-R00 31-Jan-19
10 PSS-OCS-ISF-0010-R00 7-Feb-19
y : From PSS To OCS-11A (As on 20.Feb.2019)
Desciption Remarks
They shared the input data Requirements for
RSS/FP/SP/SSP etc