You are on page 1of 2

F

~ S<lctth Eloctrictty C omn.:\ny

Internal Correspondence 1 4.#.1~1 .::.,._.1.;..11

EHV ENGINEERING & DESIGN DEPARTMENT


SUBSTATIONS ENG INEERING & DESIGN DIVISION
4th Floor, Platinum Plaza, AI-Andalus St., Jeddah

Our Reference#: 12024101 I 0164 - J I 19

Dated 10 I 03/2019 G
03/ 07 /1440 H

To Manager, EHV Projects Department - WOA/SOA

Attention FAISAL A BANAKHAR


Project Manager
Tel.#: 012-6537315
Fax#: 012-6500179 Contract # 4400006620100

Proj ect Title Jeddah Prince Fawaz Housing (JFH)


380/110/13.8 kV BSP

Subject : 110kV GIS Building- Basement Wall


Opening Details

Contracto r's Ref.#: HDEC/JFH/DTS-342 R2

Dated : 25/02/2019 G

EHV PO Ref.# : 12023001/JFH/DTS-342 R2

Dated : 24102/2019 G

Date Received @ EHV-EDDISED: 25/02/2019 G

STATUS OF THIS SUBMITTAL:

D A Acceptable IT] _a Acceptable with Comments

D .Q Acceptable, Except as noted (Resubmit) D Q Rejected (Resubmit)

D f Clarification I For Information IT] See Attached Comments ( 01 Page )

If you have any questions, please contact Engineer FAHAD S. ALJAGHTHAMI on Tel.# 012-263-7063 ext.
101 or Engineer OSAIS L. CORPORAL Jr. on ext. 151

Regard s,

OLC
Cc: J.H.JANG
HUNDAI ENGI NEERI NG & C

The given approval does nor relieve the Contractor from his contractual responsibility & obligation to meet the requirements of
the project contract scope of work and technical specifications {SOW/PTS).
Attachment to EHV-EDDISED Letter No.: 12024101 I 0164- J I 19
Dated: 10 1 03 / 2019 G Submittal Status: B
---------- - ---·---·-·--

SL.N SEC COMMENTS Contractor RESPONSE SEC DECISION I Contractor SEC DECISION I
0 CONCLUSION RESPONSE CONCLUSION
Compliance w1th DTS-038 Noted. DTS-038 R3 DTS-038 R3 is tn
shall be submitted for already submitted. status D
rev1ew to finalized Please be informed
sleeves/opening location that as per the This submittal shall
as shown 1n these civil latest electrical only be submitted
Location of the ground floor, wall after final approval of
Please note that, submitted drawing Note the drawing, tunnel-4 is
openings and cable sleeves in the DTS-038. Otherwise
1.0 drawings were coordinated changes made in wall removed and
basement shall be as per PTS to be followed .
with latest electrical drawings near Grid 5/H IS not part of accordingly, at Grid
approved electrical drawings
only. the approval and shall be -5/H is closed with
under DTS-038 Rev. 02
referred to relevant RC wall <md
approved electrical layout sleeves are
for details to be adopted. tipd ated as per
latest electrical
layout.
As per PTS clause 2.1 O(F) Noted. Noted.
requirements, in the general notes Please note that, we have
add the following statement: already coordinated with
Provision for future openings of latest electrical opening
adequate sizes shall be provided drawings. Electrical drawings
on the floor and walls. Openings of enough future openings
2.0 shall be sealed with three (3)
has been considered.
hours fire stop and smoke stop
product and covered with fire Furthermore, statement in the
coated material aluminum plate. general notes regarding fire
Openings shall be made weather resistant material are
tight to prevent ingress of sand, modified.
dust and water.

.,
I
(c 1 OF 1