NO NGSA COMMENTS CONTRACTOR’S RESPONSE NGSA COMMENTS


9.0 Gaps in Precast Concrete Cover of Cable
Trenches shall be sealed with approved sealant
after installation to minimize ingress of water (this
requirement shall be also specified in drawing
side notes). Embedded Hook / inverted U - bar to
Precast Concrete Cover shall be provided
instead of Lifting Hooks in sleeves (Follow the
unified design).
10.0 Sump of 200mmØ shall be provided at base slab
of Cable Trench aligned with the location of
Ladder Rungs. Provide plan drawings of base
slab of these Cable Trenches showing the Sump,
grade slope direction, and its levels.
11.0 As requested above, the trench details shall be
submitted in separate DTS, however the ladder
Rungs shall be also provided at northern side for
Cable Trench in front of SST-1. Moreover, both
Ladder Rungs shall be shifted between first 2
Precast Panel Cover from CIP top slab of Cable
Trench.
12.0 Arrangement and location of 1x2-110Ø LV
Power Cable sleeves along Firewall wall shall be
coordinated with relevant Overall and Auxiliary
Transformer Layout since sleeves presented in
this civil drawing are conflicting with electrical
reference layout.
13.0 Section of MV Cable Sleeves for Transformer
shall be 200Ø as per DTS-34 Auxiliary
Transformer Layout whereas specified in this civil
drawings is 160Ø. Note that section of these
sleeves shall be also indicated correctly in
sectional drawing.