NO NGSA COMMENTS CONTRACTOR’S RESPONSE NGSA COMMENTS
9.0 Gaps in Precast Concrete Cover of Cable Trenches shall be sealed with approved sealant after installation to minimize ingress of water (this requirement shall be also specified in drawing side notes). Embedded Hook / inverted U - bar to Precast Concrete Cover shall be provided instead of Lifting Hooks in sleeves (Follow the unified design). 10.0 Sump of 200mmØ shall be provided at base slab of Cable Trench aligned with the location of Ladder Rungs. Provide plan drawings of base slab of these Cable Trenches showing the Sump, grade slope direction, and its levels. 11.0 As requested above, the trench details shall be submitted in separate DTS, however the ladder Rungs shall be also provided at northern side for Cable Trench in front of SST-1. Moreover, both Ladder Rungs shall be shifted between first 2 Precast Panel Cover from CIP top slab of Cable Trench. 12.0 Arrangement and location of 1x2-110Ø LV Power Cable sleeves along Firewall wall shall be coordinated with relevant Overall and Auxiliary Transformer Layout since sleeves presented in this civil drawing are conflicting with electrical reference layout. 13.0 Section of MV Cable Sleeves for Transformer shall be 200Ø as per DTS-34 Auxiliary Transformer Layout whereas specified in this civil drawings is 160Ø. Note that section of these sleeves shall be also indicated correctly in sectional drawing.
A Short Guide to the Types and Details of Constructing a Suspension Bridge - Including Various Arrangements of Suspension Spans, Methods of Vertical Stiffening and Wire Cables Versus Eyebar Chains