TOR / NHÀ THẦU CHÍNH : LOTTE E&C SUB-CONTRACTOR / NHÀ THẦU PHỤ :
※ Summary
* It is firmly considered that re-submission is necessary to reflect the comments.
1. Top-Hung Window
1) Mullion & Transom
- There is a risk of the glazing bead falling off when bending deflection. (D01, 03)
2021. 09. 07. 2) Transom
2021. 09. 09. - Additional design of Glass Setting clip is required. (D03)
- There is a risk of water leakage. (D04)
- It is impossible to install the assembly sealant. (D04)
2. Sliding door
1) Steel reinforcement is required if it is necessary through structural review. (D05)
2) A6063-T5 is recommended for extruded profile of polyamide insulation bar. (MT02)
3. See the corresponding Comment for details.
HA NOI, 9/2021
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C SUB-CONTRACTOR / NHÀ THẦU PHỤ :
CONSTRUCTION
MANAGEMENT
SUPERVISOR MAIN CONTRACTOR SUB-CONTRACTOR
Tender drawing
Comment _ 983 - RFI-BMW-001 1. We will take the wind pressure zoning to follow attachment #1
2. We have checked the profile with typical positive pressure but it still failed. Please
review the attached calculation report. * Steel reinforcement is required if it is necessary
3. BM needs to clarify this part, can we re-design or not. through structural review.
- If it can't, please resend your detailed drawings for each case, BM will follow your - Steel reinforcement similar to comment.
design, and no need to recalculate. BM will make a V.O if it increases compared to
tender
- If it can, BM will re-design the profile base on the architectural drawings to ensure
2 bearing with typical wind pressure case and add the steel reinforcement for the corner
wind pressure case. BM will make a V.O if it increases compared to tender.
Comment _ 983 - RFI-BMW-001 1. We have checked the machining and installation tolerance but the current option is Please see drawing D01-D04
still not feasible.
2. We are concerned that we can see the aluminum frame from inside the house, in
our opinion, it is not aesthetically pleasing.
3. BM proposes a design option for removable for mullion and transom. Please see
details D01-D04 in a typical drawing to ease the installation without alum quantity
increase
Tender drawwing It is proposed to change the frame from 147mm => 150mm. Increase to install insert
screen properly. Please see details D05-D06 in a typical drawing
Tender drawwing
5
Project: LOTTE MALL HA NOI
Subject: RESPONSE FOR RFI-001
Date: 9/03/2021
Number:
Reversion:
RESPONSE FOR RFI-001
ITE
REFER TO COMMENTS RESPONSES PROPOSAL REMARK
M
Tender drawwing According to the tender: Rail design under the sliding door installed on the finished
floor, causing danger to users (causes tripping) => BM proposes to install it with
the finished floor for safer and better waterproofing. Please see details D05-D06
in a typical drawing
Tender drawwing According to tender design: the current screen properly frame is very small, lacks
bearing capacity, and is easy to shake when operating => BM proposed the design
to increase the wing frame. Please see details D05-D06 in a typical drawing
7
CLIENT / CHỦ ĐẦU TƯ
Y 21
SITE LOCATION / ĐỊA ĐIỂM
2 - COVER --
3 LT-HT-0001 DRAWING LIST --
4 LT-HT-0002 GENERAL NOTE --
APPROVED BY:
5 LT-HT-PL01 DOOR GUIDE PLAN (HT_7F) --
6 LT-HT-PL02 DOOR GUIDE PLAN (HT_8-18F) --
7 LT-HT-PL03 DOOR GUIDE PLAN (HT_19F) --
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
Satoshi Take
CHECKED BY:
00 03/09/2021
DRAWING LIST
03/09/2021 1:1
LT-HT-0001
CLIENT / CHỦ ĐẦU TƯ
DẤU CHỈ MẶT CẮT QUA CÔNG TRÌNH / BUILDING SECTION REFERENCE
ABBREVIATION PROJECT TITLE / DỰ ÁN
COMPLETE WORD TỪ HOÀN CHỈNH
MẶT CẮT 1 TRONG BẢN VẼ XXX / SECTION 1 ON SHEET XXX
C
DẤU CHỈ MẶT CẮT CHI TIẾT
SECTION DETAIL in DRAWING CONT. CONTINUOUS
CSK. COUTERSUNK
CTRS CENTER TO CENTER APPROVED BY:
DẤU CHỈ MẶT ĐỨNG / ELEVATION REFERENCE
MẶT ĐỨNG 1 TRONG BẢN VẼ XXX / ELEVATION 1 ON SHEET XXX
D
CHỈ ĐỊNH CHI TIẾT PHÓNG LỚN / DETAIL INDICATOR - IN LARGE DIM DIMENSION
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
CHI TIẾT 1 TRONG BẢN VẼ XXX / DETAIL 1 ON SHEET XXX DS DOWSIL SILICONE
KÍ HIỆU CAO ĐỘ TRẦN Ở MẶT BẰNG VÀ MẶT CẮT: CAO ĐỘ TỪ SÀN ĐẾN TRẦN
F
CEILING LEVEL MARK PLAN & SECTION: CEILING TO FINISH FLOOR LEVEL
FFL FINISH FLOOR LEVEL
APPROVED BY:
CAO ĐỘ HOÀN THIỆN / FINISH FLOOR LEVEL
CAO ĐỘ KẾT CẤU / STRUCTURAL FLOOR LEVEL G
H
LƯỚI VÀ TRỤC ĐỊNH VỊ HDG HOT-DIP GALVANIZING NAME:
COLUMN GRID & BUBBLE REFERENCE
HEX HEXAGON
APPROVED BY:
ĐƯỜNG TIM
CENTER LINE N
DẤU NGẮT NTS NOT TO SCALE
BREAK LINE
TẤM KÍNH VỊ TRÍ CHE SÀN (GLASS SPANDREL PANEL) ĐỆM CHÊM NHỰA SETTING BLOCK Revision Issued date Description
00 03/09/2021
TẤM ỐP NHÔM (ALUM. CLADDING PANEL) RON/ GIOĂNG (GASKET) W
W/ WITH
THÉP (STEEL) BÊ TÔNG VÀ CỐT SẮT (CONCRETE)
03/09/2021 1:1
LT-HT-0002
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
HY-1
HY-5 HY-4 HY-3 HY-2
SITE LOCATION / ĐỊA ĐIỂM
APPROVED BY:
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
AW-H-2
HX-4
NAME:
AW-H-4a
APPROVED BY:
HX-3
CHECKED BY:
AW-H-5 AW-H-4
6600
AW-H-5 AW-H-4
HX-2
APPROVED BY:
7900
AW-H-3
Satoshi Take
CHECKED BY:
AW-H-2
00 03/09/2021
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 TOP HUNG WINDOWS
& SLIDING DOOR
03/09/2021 1:100
LT-HT-PL01
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
HY-1
HY-5 HY-4 HY-3 HY-2
SITE LOCATION / ĐỊA ĐIỂM
APPROVED BY:
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
AW-H-2
HX-4
NAME:
AW-H-4a
APPROVED BY:
HX-3
CHECKED BY:
AW-H-5 AW-H-4
6600
AW-H-5 AW-H-4
HX-2
APPROVED BY:
7900
AW-H-3
Satoshi Take
CHECKED BY:
AW-H-2
00 03/09/2021
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 TOP HUNG WINDOWS
& SLIDING DOOR
03/09/2021 1:100
LT-HT-PL02
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
HY-1
HY-5 HY-4 HY-3 HY-2
SITE LOCATION / ĐỊA ĐIỂM
APPROVED BY:
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
AW-H-2
HX-4
NAME:
AW-H-4a
APPROVED BY:
HX-3
CHECKED BY:
AW-H-5 AW-H-4
6600
AW-H-5 AW-H-4
HX-2
APPROVED BY:
7900
AW-H-3
Satoshi Take
CHECKED BY:
AW-H-2
00 03/09/2021
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 TOP HUNG WINDOWS
& SLIDING DOOR
03/09/2021 1:100
LT-HT-PL03
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
HY-1
HY-5 HY-4 HY-3 HY-2
SITE LOCATION / ĐỊA ĐIỂM
APPROVED BY:
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
AW-H-2
HX-4
NAME:
AW-H-4a
APPROVED BY:
HX-3
CHECKED BY:
AW-H-5a AW-H-4
6600
AW-H-5a AW-H-4
HX-2
APPROVED BY:
7900
AW-H-3
Satoshi Take
CHECKED BY:
AW-H-2
00 03/09/2021
AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 AW-H-1 TOP HUNG WINDOWS
& SLIDING DOOR
03/09/2021 1:100
LT-HT-PL04
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
11700
AW-H-11b AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
AW-H-11b
Nguyen Ngoc Duan
00 03/09/2021
LT-HT-PL05
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
11700
AW-H-11b AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
AW-H-11b
Nguyen Ngoc Duan
00 03/09/2021
LT-HT-PL06
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
AW-H-11b
11700
AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
AW-H-11b
Nguyen Ngoc Duan
00 03/09/2021
LT-HT-PL07
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
AW-H-11b
11700
AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
AW-H-11b
Nguyen Ngoc Duan
00 03/09/2021
LT-HT-PL08
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
11700
AW-H-11b AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
AW-H-11b
Nguyen Ngoc Duan
00 03/09/2021
LT-HT-PL09
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
11700
AW-H-11b AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
AW-H-11b
Nguyen Ngoc Duan
00 03/09/2021
LT-HT-PL10
CLIENT / CHỦ ĐẦU TƯ
SX-4
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
AW-H-11b AW-H-11b
APPROVED BY:
11700
AW-H-11b AW-H-11b
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
AW-H-11c AW-H-11c
APPROVED BY:
SX-3
TY P E9 3900X 2700
5100
SX-2
AW-H-11c
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
AW-H-11c
APPROVED BY:
11700
AW-H-11b
Satoshi Take
AW-H-11b
CHECKED BY:
00 03/09/2021
LT-HT-PL11
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
INSIDE OUTSIDE
A-A
-- SITE LOCATION / ĐỊA ĐIỂM
01 01 109
AW-H-10
D03 D04
0
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
15
80
75
56
60
15.5
APPROVED BY:
01 02
D02 D02
1250
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
02
APPROVED BY:
D04
2600
2600
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
1-1
--
NAME:
APPROVED BY:
01 02
D01 D01
1350
CHECKED BY:
D03
15.5
80
56
60
8
FFL
50
100
15
100
APPROVED BY:
30
900 1200 900
80
109
00 03/09/2021
SECTION 1-1
30
20
20
0 3000
130
130
03/09/2021 1:1
LT-HT-PE01
CLIENT / CHỦ ĐẦU TƯ
100
100
500
PROJECT TITLE / DỰ ÁN
62
A-A
01 -- INSIDE OUTSIDE
400
D06
AW-H-1
SITE LOCATION / ĐỊA ĐIỂM
50
APPROVED BY:
1-1
-- APPROVED BY:
2800
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
NAME:
01 02 03 APPROVED BY:
D05 D05 D05
CHECKED BY:
1050
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
01
D06
FIX
FFL
45.9
5
36
2
APPROVED BY:
3.5
50
12.6
35
80
150
30
2150 1200
Satoshi Take
CHECKED BY:
3350
SECTION A-A
Nguyen Ngoc Duan
00 03/09/2021
INSIDE
ITEM / HẠNG MỤC
TOP HUNG WINDOWS
& SLIDING DOOR
50
175
SECTION 1-1
DWG. TITLE / TÊN BẢN VẼ
03/09/2021 1:10
OUTSIDE
3350
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
LT-HT-PE02
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
INSIDE
ALUM. MULLION
ALUM. MULLION
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
APPROVED BY:
15
15
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
200
78.5
78.5
NAME:
124
124
45 45
APPROVED BY:
170
170
15
15
CHECKED BY:
8
30
24
24
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
8 8
22
22
SILICONE
APPROVED BY:
INSULATION OUTSIDE
03/09/2021 1:1
LT-HT-D01
CLIENT / CHỦ ĐẦU TƯ
PROJECT TITLE / DỰ ÁN
INSIDE
ALUM. MULLION
ALUM. MULLION
MOSQUITO NET WINDOW SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
9 60 ALUM. TRANSOM
15 60 40 ALUM. PROFILE
15
15
63.1
51
25
25
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
11
200
7.5
NAME:
124
APPROVED BY:
170
170
67
73
65.6
65.6
25 15.9
6
6
CHECKED BY:
15.5 4
30
24
24
24
6
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
8 8
22
22
4
SILICONE
APPROVED BY:
INSULATION OUTSIDE
03/09/2021 1:1
LT-HT-D02
CLIENT / CHỦ ĐẦU TƯ
01 VERTICAL SECTION
PE01 SCALE 1:1
172
--
5
SITE LOCATION / ĐỊA ĐIỂM
PLASTIC SHIM
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
30
5THK. GALV. STEEL BRACKET
FLASHING
55
GALV. STEEL 0.5MM INSULATION
APPROVED BY:
90
85
SILICONE
M10X75MM SS316 BOLT
40
DRAINAGE M5X20MM SS316 SCREW
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
40
15
TO CONTINUOUS 80
8
MATTE WHITE TEXTURE
60
56
60
2THK. ALUM. BRACKET MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
15.5
60
SILICONE + BACKING ROD ALUM. MULLION NAME:
170
CHECKED BY:
OUTSIDE 22 24 124 INSIDE
ALUM. MULLION
DOUBLE GLAZING 24MM
( 6MM HS -12AIR-6MM HS) ALUM. TRANSOM
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
* Additional design of Glass Setting clip is required. EPDM GASKET ALUM. BRACKET
a) There is a risk of sagging defects when thermal deformation occurs.
- The heat deflection temperature of polyurethane (AZON) is 60 degrees.
15.5
APPROVED BY:
SETTING BLOCK
60
56
60
Satoshi Take
SILICONE 791
8
ALUM. COVER
12.8
CHECKED BY:
80
* There is a risk of the glazing bead falling off when Revision Issued date Description
160
00 03/09/2021
bending deflection.
M10X75MM SS316 BOLT
100
INSULATION
ITEM / HẠNG MỤC
FLASHING TOP HUNG WINDOWS
GALV. STEEL 0.5MM PLASTIC SHIM & SLIDING DOOR
THK4 AL. COMPOSITE PANEL /PVDF COAT.
MATTE WHITE TEXTURE FFL
30
DWG. TITLE / TÊN BẢN VẼ
03/09/2021 1:1
02 VERTICAL SECTION
80
STAGE / GIAI ĐOẠN DWG No./ BẢN VẼ SỐ
172
PLASTIC SHIM
5
SITE LOCATION / ĐỊA ĐIỂM
30
5THK. GALV. STEEL BRACKET
FLASHING CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
40
GALV. STEEL 0.5MM INSULATION
90
SILICONE
55
M10X75MM SS316 BOLT
40
DRAINAGE M5X20MM SS316 SCREW APPROVED BY:
85
15
TO CONTINUOUS 80 SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
75
THK4 AL. COMPOSITE PANEL /PVDF COAT.
MATTE WHITE TEXTURE
60
APPROVED BY:
36
STRUCTURAL SILICONE + DOUBLE SIDE TAPE NAME:
SECTION A-A
APPROVED BY:
ALUM. MULLION
DOUBLE GLAZING 24MM
18.6
( 6MM HS -12AIR-6MM HS) 25 15
18.6
25
SILICONE + BACKING ROD SILICONE
* It is impossible to install the assembly sealant. Nguyen Ngoc Duan
EPDM GASKET
- It is not suitable for securing watertight performance.
8
44.5
00 03/09/2021
36
ALUM. TRANSOM
60
& SLIDING DOOR
EPDM GASKET
6 DWG. TITLE / TÊN BẢN VẼ
4
PROJECT TITLE / DỰ ÁN
INSIDE
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
HANDLE
51.5
SETTING BLOCK
ALUM. PROFILE APPROVED BY:
60
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
50 200
50 50
19
64.4
137
30 MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
25
STEEL BRACKET
40
NAME:
PLASTIC SHIM
150
150
APPROVED BY:
100
50
3.6
V ALUM. 20x20x2MM
LONG 50MM
54
60
@500, SITE
CHECKED BY:
33
25
16.6
80 3
125
15.7 SUB-CONTRACTOR / NHÀ THẦU PHỤ :
SILICONE
CHECKED BY:
THK4 AL. COMPOSITE PANEL /PVDF COAT.
MATTE WHITE TEXTURE
TONE COAT
* Steel reinforcement is required if it is necessary Nguyen Ngoc Duan
00 03/09/2021
OUTSIDE
03/09/2021 1:1
LT-HT-D05
CLIENT / CHỦ ĐẦU TƯ
270
01 VERTICAL SECTION
PE02 SCALE 1:1 M10X110 STEEL ANCHOR BOLT W/SQUARE WASHER PROJECT TITLE / DỰ ÁN
15
PLASTIC SHIM
SITE LOCATION / ĐỊA ĐIỂM
100
100
SILICONE 791 + BACKING ROD M10X75MM SS316 BOLT
APPROVED BY:
60
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
60
400
22 ALUM. FOIL
--
500
A-A
22
APPROVED BY:
15
SILICONE 791
21 15
50
MOSQUITO NET DOOR ALUM. FRAME CHECKED BY:
CELLING
(BY OTHER)
M5x20 SS. 316 SCREW, @500
78.5
71.5
4
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
OUTSIDE INSIDE
54
14 DOUBLE GLAZING 24MM
( 6MM HS -12AIR-6MM HS) APPROVED BY:
SETTING BLOCK
ALUM. PROFILE
Satoshi Take
CHECKED BY:
MORTAR
ROLER FFL
5
36
2 3.5
SILICONE 791
50
80
02 VERTICAL SECTION
PE02 SCALE 1:1 DATED / HOÀN THÀNH SCALE / TỶ LỆ
03/09/2021 1:2
LT-HT-D06
CLIENT / CHỦ ĐẦU TƯ
MÃ PROFILE HÌNH DẠNG PROFILE DIỄN GIẢI HOÀN THIỆN VẬT LIỆU
PROFILE CODE PROFILE SHAPE DESCRIPTION FINISH MATERIAL
168.7
PROJECT TITLE / DỰ ÁN
50.7
2 SITE LOCATION / ĐỊA ĐIỂM
2
POWDER COAT
16
BM-CW601 6063-T6
60
MULLION & TRASOM
RAL 9011
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
33.3
2
118 APPROVED BY:
25
1.2 COVER
RAL 9011
16
APPROVED BY:
60
NAME:
55
56
APPROVED BY:
BM-CW603 SHEAR BRACKET MILL FINISH 6063-T6
2.7
45 CHECKED BY:
2 2
29.6
5.5
2
POWDER COAT
BM-CW604 6063-T6
55.1
OPENING FRAME
RAL 9011 APPROVED BY:
2
11
Satoshi Take
6 00 03/09/2021
2
42
POWDER COAT
BM-CW605 6063-T6
1.5
OUTER FRAME
RAL 9011
12 12.5
1.5
9
WINDOW WALL
PROFILE LIST
03/09/2021 1:1
LT-HT-MT01
CLIENT / CHỦ ĐẦU TƯ
MÃ PROFILE HÌNH DẠNG PROFILE DIỄN GIẢI HOÀN THIỆN VẬT LIỆU
PROFILE CODE PROFILE SHAPE DESCRIPTION FINISH MATERIAL
34.5
2
2.5
2.5
SITE LOCATION / ĐỊA ĐIỂM
POWDER COAT
55.5
LT-SD01 THRESHOLD 6063-T6
50
RAL 9011
1.5
1.3 1.3 1.5
12.6
CONSTRUCTION MANAGEMENT / BAN QUẢN LÝ DỰ ÁN
21
150
1.5
80 APPROVED BY:
5
1.4
POWDER COAT
1.4
29.9
54
LT-SD02 6063-T6
SUPERVISOR / TƯ VẤN GIÁM SÁT : IBST & 4M PARTNERS
49
OPENING FRAME
RAL 9011
1.5
1.5
12.1
45.9
62 APPROVED BY:
29.5
28.9
MAIN CONTRACTOR / NHÀ THẦU CHÍNH : LOTTE E&C
POWDER COAT
21.8
14.7
18
SUB-CONTRACTOR / NHÀ THẦU PHỤ :
1.8
POWDER COAT
LT-SD06 6063-T6
30
CHECKED BY:
25
1.2
1.8
14.3
POWDER COAT
16.6
00 03/09/2021
6
13.1
47.3 ITEM / HẠNG MỤC
POWDER COAT
10.3
SLIDING DOOR
PROFILE LIST
28.1
30.8
1.7
03/09/2021 1:1
45.1
STAGE / GIAI ĐOẠN
LT-SD11 PVC
DWG No./ BẢN VẼ SỐ
LT-HT-MT02
33.9