You are on page 1of 54

Employer Project Management Co.

Consultant Contractor

Project:
FORTE (PLOTS D1D2) : MAIN CONTRACT WORKS

MA. No. D1D2-MAR-A-0348


Material Approval Revision No. 00 Date: 25-Oct.- 2020
Discipline: Civil Architectural Electrical Mechanical /Plumbing / HVAC Others
Material Description: Manufacturer: M/s EW Cox Middle
Material Submittal for Abseiling System East
Supplier: M/s EW Cox Middle East
Origin: UAE
Location / Area of Use:
Tower 1 – Roof Level & 45th Level ; Tower 2 – Roof Level & 31st Level

Drawings / Specification Details :


15-80173 Forte D1 + D2 BMU Particular Specification Rev 00 - IFC
Technical Details of Proposed Materials

As per spec comparison sheet attached

Attachments :-
Yes Yes Yes Yes
Specification Samples Original Other Supporting
Comparison Sheet Submitted Brochure Documents attached
N/A N/A N/A N/A
Remarks / Notes :-

Received by AECOM
For CONTRACTOR- Target Engineering Construction Co.
(Received Stamp)
Name :

Designation : Signature: Date:


AECOM Representative Approval Status / Comments
Approval Code- (A) Approval Code- (B) Approval Code- (C) Approval Code- (D)
Approved Approved with Comments Revise & Resubmit Rejected
Comments: -

For AECOM
Name : Mohammed Maan Addas

Designation : Sr. Resident Engineer Signature: Date:


For EMAAR
Name : Fadi Fadda

Designation : Project Manager Signature: Date:

Form No. D1D2-PSP-401-FM -04, Rev.02, Dated 12.12.2017 Page 1 of 2


Employer Project Management Co. Consultant Contractor

Project:
FORTE (PLOTS D1 D2) : MAIN CONTRACT WORKS

MA Ref. No.
Specification Comparison Sheet for Material Approval D1D2-MAR-A-0139
Material Description
Material Submittal for Abseiling System

Specification Clause Proposed Material Compliance


Sl.No. Requirements Remarks
Reference Specification Yes No
Particular
Specification for
Building
Maintenance Units
3 Abseil system
3.1 Abseil System General
Requirements
The client has requested a
supplementary abseiling system Underhung Abseil Hooks are to
which is to provide to option of be provided to recess areas in This is additional system to
rapid abseil cleaning to as much Towers 1 & 2 where the roof cover recess areas which
of the façade as possible. The
BMUs will not access. Abseil
✓ are not indicated in the IFC
abseilers should not land on
private balconies or terraces, Hooks will be used for cleaning drawings
which may limit access to some and panel replacement
locations on the building.
The abseiling system shall fully The abseiling system will fully
comply with the BMU General comply with the BMU general
Specification in addition to the specification in addition to the

following: following
Fixed anchors, Abseil Hooks are fixed to the
• Operating
Location bolted or cast structure by cast-in anchor or ✓
to structure thru bolts
• Permanent Yes Yes ✓
• Warranty
Period 1 Year 1 Year ✓
• Design Life
(Fatigue etc.) 25 Years 25 Years ✓
• Defects
Liability 1 Year 1 Year ✓
Service Period

3.2 Abseil Design Details


The abseil system is primarily
composed of abseil anchors
which are fixed to the tower The abseil hooks are
parapet structure above the
main roof deck. The anchors will composed of support bracket
be of sufficient strength to and eyehooks fixed to the slab
support the 15kN applied load soffit of Tower-01 Roof Level &
as per design code BS 7985 54th Floor and Tower -02 Roof

and DM regulations. The level & 31st floor. Abseil Hook to
anchors are to have adequately support 21kN and designed as
sized access holes to allow
abseiling operators to tie ropes per BS7985
via industry standard
carabiners.
The anchor system will be ✓
designed and supplied by the
BMU contractor, and fitted to the The cast-in anchor to fixed by
walkway (also supplied and abseil hooks will be supplied by
designed by the BMU CoxGomyl and incorporation to
contractor), or the structural concrete slab by Main
slab. The anchors themselves Contractor. The abseil hooks are
will ideally be proprietary designs specifically for abseil in
anchors specifically designed
for abseiling and rated for compliance to BS7985
compliance to the design codes
Each abseil system shall be Each Abseil hook can employ 1
designed to accommodate up abseiler working on it. But
to 6 workers. There will need to multiple Abseil hooks can be
be primary tie off points from the
access location. The BMU used at the same time to employ ✓
contractor will be required to more workers. Positions of the
provide temporary edge to abseil hooks will not subject the
prevent the abseiling ropes from façade to the abseil ropes
Form No. D1D2-PSP-401-FM -04, Rev.02, Dated 12.12.2017 Page 2 of 3
Employer Project Management Co. Consultant Contractor

Project:
FORTE (PLOTS D1 D2) : MAIN CONTRACT WORKS

Specification Clause Proposed Material Compliance


Sl.No. Requirements Remarks
Reference Specification Yes No
clashing with the façade. clashing with the façade.
BS 7985 & BS 7985 & DM-PH&SD-P7-
• Design codes DM-PH&SD-
TG07

P7-TG07
• Design 15 kN per
loading fixing point 21 kN ✓
6 kN per fixing
• Site testing point 6kN ✓
Mild steel support brackets that
Stainless steel are hot dip galvanized and
• Bracket grade 316L or
material approved painted. Abseil Hook is m20 ✓
equiv. stainless steel grade 316
eyebolts.
• Design Life
(Fatigue etc) 25 Years 25 Years ✓
• Defect Liability
Period 1 Year 1 Year

3.3 Water & power Supply


Water & power supplies shall be
provided by the MEP contractor.
Typical water and power supply Water and power supply will be
locations and capacity are to be
indicated by BMU contractor at taken from the same supply ✓
the time of tender and points used by the Roof BMU
coordinated throughout project
duration.

3.4 Roof Access


The abseil system shall be
accessed via the access
ladders and walkways (provided
by the BMU contractor). The Abseiler will access the
BMU contractor is to coordinate
and ensure the rigging position underhung abseil hooks by
for the abseiling system can be rappelling from the roof abseil
reached via the access hooks or with the use of Roof
provided, and the method BMU cradle to position the

statement meets the project and abseiler to the abseil hooks
design code requirements. The location from where they will
location of the abseil anchors
shall be spaced between the start.
vertical façade fins (where fitted)
to prevent the ropes rubbing on
the fins.
Remarks / Note:-

For CONTRACTOR- Target Engineering Construction Co.


Name : Abdullah Bassam

Designation : Project Manager Signature: Date:

Form No. D1D2-PSP-401-FM -04, Rev.02, Dated 12.12.2017 Page 3 of 3


D1D2 FORTE TOWER
DOWNTOWN DUBAI DEVELOPMENT, DUBAI, U.A.E.

Material Submittal for Underhung


Abseil Hooks at Tower 1 & Tower 2
Doc. No. : D1D2-MAR-A-0348
Revision : 00

Rev. Date Prepared by: Approved by: Remarks


st
00 25-Oct-20 J. Bautista V. Kottayi 1 issue for approval

E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
Contents

1.0 LIST OF MAKES ........................................................................................................ 2

2.0 REFERENCE DRAWINGS ......................................................................................... 6

3.0 TECHNICAL SHEET ................................................................................................ 14

3.1 Cast-in Anchors........................................................................................................ 15

3.2 Thru Bolts................................................................................................................. 16

3.3 Underhung Abseil Hooks .......................................................................................... 17

3.4 Coxgomyl Welding Certificates ................................................................................. 18

3.5 Painting System ....................................................................................................... 20

4.0 MATERIAL TEST CERTIFICATE ............................................................................. 21

5.0 TRADE LICENSE & ISO CERTIFICATES ................................................................ 26

6.0 LIST OF MAJOR PROJECTS .................................................................................. 38

7.0 LIST OF CONSULTANTS / CLIENTS APPROVALS ................................................ 43

8.0 DRAFT WARRANTY ................................................................................................ 48

i
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
1.0 LIST OF MAKES

2
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
COXGOMYL
ITEM QTY. DESCRIPTION LOCATION
SCOPE

− M16 Stainless Steel Cast-in


Anchors TOWER-1 − Design
Abseil Hooks Roof Level
28
− Hot Dip Galvanized & Painted Elevations 1 −& Manufacture
(Tower – 1 Recess nos.
Façade, Roof Level) Mild Steel Support Brackets 3 − Supply
− M20 Stainless Steel Eyehooks Installation

− M16 Stainless Steel Cast-in


Anchors
− Design
Abseil Hooks − Hot Dip Galvanized & Painted TOWER-1 −
35 Mild Steel Abseil Bracket Manufacture
54th Level
(Tower – 1 Recess nos.
Elevation 1− Supply
Façade, 54th Level) − M20 Stainless Steel Eyehooks
− Installation
− M16 Stainless Steel Assembly
Bolts

− M16 Stainless Steel Cast-in


− Design
Anchors TOWER-2
Abseil Hooks
Roof Level− Manufacture
(Tower – 2 Recess 18 nos. − Hot Dip Galvanized & Painted
Elevations 1 &
Mild Steel Abseil Bracket − Supply
Façade, Roof Level) 3
− M20 Stainless Steel Eyehooks − Installation

− M16 Stainless Steel Thru Bolts


− Design
− Hot Dip Galvanized & Painted
Abseil Hooks Mild Steel Abseil Bracket TOWER-1 − Manufacture
33 nos. 31st Level
(Tower – 2 Recess
Façade, 31st Level) − M20 Stainless Steel Eyehooks Elevation 1− Supply

− M16 Stainless Steel Assembly − Installation


Bolts

3
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
- Abseil Hooks

4
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
- Abseil Hooks

5
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
2.0 REFERENCE DRAWINGS

6
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
3.0 TECHNICAL SHEET

14
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
3.1 Cast-in Anchors
Applicable to Tower – 01 Roof Level & 54th Level and Tower – 02 Roof Level Abseil Hooks

Cast-in Anchors Technical Detail

Anchor Type : 2 Bolt Cluster M16 Cast-in Anchors

Material : Stainless Steel Grade A4-70

Finish : Stainless Steel Mill Finish

Notes: Cast-in Anchors to be supplied by Cox Gomyl, installation (casting) to the concrete
slab to be carried out by Main Contractor
15
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
3.2 Thru Bolts
Applicable to Tower – 02 31st Level Abseil Hooks

Thru Bolts Technical Detail

Anchor Type : M16 Thru Bolts

Material : Stainless Steel Grade A4-70

Finish : Stainless Steel Mill Finish

16
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
3.3 Underhung Abseil Hooks

Abseil Hooks Technical Detail


Type : Underhung Abseil Hooks
Design Standard : BS 7985
Design Load : 21 kN
Material
Brackets : Plate & 80x80x5 SHS Mild Steel Grade 275 (min)
Hooks : M20 Stainless Eyehooks Steel Grade A4-70
Assembly Bolts for Brackets : M16 Stainless Steel Grade A4-70
Finish
Brackets : Hot Dip Galvanized & Painted
Hooks & Assembly Bolts : Stainless Steel Mill Finish
Fixation to Structure : Thru the Cast-in Anchors / Thru Bolts

17
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
3.4 Coxgomyl Welding Certificates
The welding process for the fabrication of the abseil hooks is to be carried out in accordance
to the international standards and codes for structural steel welding. The welding procedures
adopted for the BMU fabrication are mostly fillet welding & penetration welding.

18
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
19
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
3.5 Painting System
The support brackets that are made of mild steel which will undergo hot dip
galvanisation process. After the galvanising process, the brackets will be painted
according tro the painting process as detailed below.

20
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
4.0 MATERIAL TEST CERTIFICATE
THE MTC’s PROVIDED ARE JUST SAMPLEs FOR REFERENCE OF THE
MATERIAL GRADES BEING USED BY EWC IN ITS PRODUCTS, ACTUAL MTCs
WILL BE PROVIDED AT THE TIME OF MATERIAL DELIVERY.

21
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
22
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
23
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
24
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
25
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
5.0 TRADE LICENSE & ISO CERTIFICATES

26
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
27
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
28
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
29
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
30
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
31
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
32
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
33
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
34
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
35
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
36
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
37
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
6.0 LIST OF MAJOR PROJECTS

38
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
Project: The Address Residence, Skyview
Year: On-Going
BMU Description:
- Abseil Hooks on the Soffit of the Skywalk

39
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
Project: Burj Vista, DownTown, Dubai
Year: 2019
BMU Description:
- Abseil hooks on each towers

40
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
Project: TIARA TOWERS, DUBAI
Year: 2018
BMU Description:
- Abeil System at the top of the crown

41
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
Project: Serenia Residence, The Palm, Dubai
Year: 2018
BMU Description:
- Asbeil Hooks on the Roof level

42
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
7.0 LIST OF CONSULTANTS / CLIENTS
APPROVALS

43
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
44
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
45
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
46
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
47
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
8.0 DRAFT WARRANTY

48
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
49
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore
50
E.W. Cox Middle East LIC. NO. 521367 P.O. Box 33654 t +971 4 511 8200 f +971 4 511 8300 w www.coxgomyl.com
Abu Dhabi | Brisbane | Dubai | Guangzhou | Hong Kong | London | Macau | Madrid | Melbourne | Moscow | New York | Perth | Shanghai | Sydney | Singapore

You might also like