Employer Project Management Co.

Consultant Contractor

Project:
FORTE (PLOTS D1D2) : MAIN CONTRACT WORKS

Check List for WIR Ref. / Sr. No.:


Abseil Hook Installation
Location (Attach sketches if necessary): Applicable Drawing No.:

Level (If Applicable): Revision No.:00


Item / Structure Description:

Status
No. Quality Checks Accepted Not Accepted

1 Cast-in anchors location, level & embedment

2 Pre-drilled Through hole Level & embedment

3 Roof level Abseil Hook plinth location and positioning

4 Roof level Abseil Eye hook embedment to the concrete plinths


Soffit mounted Abseil brackets fixation with stainless steel M16 nuts,
5
square, spring & flat washers tightened to 140-147 Nm.
6 Overall surface finish condition (galvanized, painted & mill finish)

7 Overall cleaning of the Abseil Hook.

Comments if any: -

For CONTRACTOR / QA/QC ENGINEER For AECOM / EMPLOYER

Name

Signature & Date

Form No. D1 D2 –ITP-A-71-FM-01, Revision: 0, Dated 28-07-2020