SCOPE OF WORK

Document No : FORM-ENG-001 Responsibility : Engineering


REV. 01 Date : February 26, 2016 Page : 1 of 1
No. : 1 of 1 Customer : SIS Part Name : THUMBLER
Date : August 25, 2022 Job No. : Model/Unit : EX 3600

SSC ID : SSC SA-9412 Quote No. : Part No. : 1029151


PLANNED PROCESS
Work Std. Time Date Finish Insp.
No. Process Description 
Center Hrs Start Finish Start Finish Sign Sign
1 Remove Crack GENWELD 2.0
2 Inspection Crack QC 0.5
3 Welding Crack Crack GENWELD 2.0
4 Welding Damage Area Spline & Reshape  GENWELD 8.0
5 Welding Worn Out Surface  GENWELD 2.0
10 Undercutting Floating Seal Seat Area A  GENWELD 1.0
20 Undercutting Floating Seal Seat Area B  GENWELD 1.0
30 Grinda Claw Before Weld  GENWELD 4.0
40 Weld Build Up OD Thumbler  GENWELD 12.0
50 Weld Build Up Claw  GENWELD 20.0
60 Weld Build Up Floating Seal Seat A  GENWELD 3.0
70 Weld Build Up Floating Seal Seat B  GENWELD 3.0
90 Machining Floating Seal Seat Area A  CNC VL 4.0
100 Machining Floating Seal Seat Area B  CNC VL 4.0
105 Machining ID Spline (Ex-Weld) CNC VL 2.0
110 Machining OD Thumbler  CNC VL 8.0
120 Machining OD Thumbler  MILL 10.0
130 Handressing Claw Length  GENWELD 18.0
135 Polish Spline  HD 2.0
140 Handressing & Cleaning  HD 6.0
150 Post Inspection  QC 1.0
160 Painting  HD 2.0
170 Packing  HD 1.0
180 Final Inspection  QC 0.5

REMARKS

sow partial
UN-PLANNED PROCESS / REWORK
Work Std. Time Date Finish Insp.
No. Process Description 
Center Hrs Start Finish Start Finish Sign Sign

Issued by: (Engineering) Reviewed by: (Engineering Spv.) Received by: (Production Spv.)

ANSAR Date: MI'RAJUDIN Date: Date:


Prcs. No : 1-3
Process Definition : Repair Crack

Dimension Record (Critical Dim.) X: X' :


Inspection Requirement: Y: Y': Rev:00

Prcs. No : 4
Process Definition : Welding Damage Area Spline & Reshape

Weling Local Damage & Worn Out Sline


Material : E71T
Rehape Spline (Finishing by Grinding)

Dimension Record (Critical Dim.) X: X' :


Y: Y' :
Inspection Requirement: Rev:00

2
Prcs. No : 5
Process Definition : Welding Worn Out Surface

Welding Worn Out Surface


Material : E71T

Dimension Record (Critical Dim.) X: X' :


Inspection Requirement: Y: Y': Rev:00

Prcs. No : 10-20
Process Definition : Undercutting Floating Seal Seat A, B

Undercutting By Grinding
STRIPPING THIS AREA
1-1.5 mm Thickness
1.5mm THICKNESS

ALL INDICATION SHOULD BE REPAIRED


BEFORE CONTINUE TO NEXT PROCESS

DETAIL A&B
A

B
Dimension Record (Critical Dim.) X: X' :
Y: Y' :
Inspection Requirement: Rev:00

3
Prcs. No : 30-50
Process Definition : Weld Build Up OD Thumbler Claw

MATERIAL WELD BUILD UP HEXAGON &


OD AREA : E91T + HV450 (MIX)
FINISH WITH HV450
515±1
760±1

±1
532
MATERIAL WELD BUILD UP CLAW
AREA : E91T + HV 600 (MIX)
` FINISH WITH HV600
77

Ø4

90
1

±2

WELD BUILD UP OD THUMLER AS DIMENSION BELOW


PRE HEAT : 200°-300° C
CHECK DIMENSI ACTUAL WELD MAT'L : E91T + HV450 MIXING (HEX & OD)
WELD MAT'L : E91T + HV 600, 3 LAYER / 10 MM (CLAW)

Dimension Record (Critical Dim.) X: X' :


Inspection Requirement: Y: Y': Rev:00

Prcs. No : 60-70
Process Definition : Weld build Up Duo Cone Seals

Don't Weld Surface

Dimension Record (Critical Dim.) X: X' :


Y: Y':
Inspection Requirement: Rev:00

4
Prcs. No : 90-100
Process Definition : Machining Duo Cone seals

18.5-0.05 21 -0.05
+0.1 +0.1

DETAIL A&B
+0.1
Ø444 -0
Ø457.474±0.1
Ø462.146±0.1
Ø461.3±0.1

R0.5
10°

A
R6

15±0.3

2 LANDS
(366)

Ø490±2
366±1
5

376±1

Dimension Record (Critical Dim.) X: X' :


Y: Y' :
Inspection Requirement: Rev:00

5
Prcs. No : 110
Process Definition : Reshape Claw

detail for claw

Dimension Record (Critical Dim.) X: X' :


Y: Y' :
Inspection Requirement: Rev:00

6
Prcs. No : 120 Prc
Process Definition : Machining OD Thumbler

Dimension Record (Critical Dim.) X: X' :


Y: Y' :
Inspection Requirement: Rev:00