Design of Drain for trench-01

1 Area - paved ground Sq.m 26445


Run-Off Co-eff. 0.70
Rain fall mm/hr 100.00
Flow - Un paved ground cu.m/sec 0.51

2 Area - Road Sq.m 0


Run-Off Co-eff. 0.80
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.00

Total Flow Required cu.m/sec 0.00

Width mm 750.00
Average depth mm 900.00

Area of cross section Sqm 0.6750 1800

Wetted Perimeter m 2.550

Hydraulic mean depth m 0.2647

Slope in 1000
Roughness Co.efficient 0.015
Velocity m/sec 0.8691

Total Flow - achieved cu.m/sec 0.5867

Note: Starting depth =0.3m,


Ending depth = 1050m
Considering average depth =900
Free board depth = 0.30
Design of Drain for trench-01

1 Area - paved ground Sq.m 11206


Run-Off Co-eff. 0.70
Rain fall mm/hr 100.00
Flow - Un paved ground cu.m/sec 0.22

2 Area - Roof Sq.m 20045


Run-Off Co-eff. 0.90
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.50

3 Area - Landscape Sq.m 24512


Run-Off Co-eff. 0.30
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.20

Total Flow Required cu.m/sec 0.92

Width mm 1000.00
Average depth mm 900.00

Area of cross section Sqm 0.9000 1800

Wetted Perimeter m 2.800

Hydraulic mean depth m 0.3214

Slope in 1000
Roughness Co.efficient 0.015
Velocity m/sec 0.9892

Total Flow - achieved cu.m/sec 0.8903

Note: Starting depth =0.3m,


Ending depth = 1050m
Considering average depth =900
Free board depth = 0.30
Design of Drain for trench-01

1 Area - paved ground Sq.m 11206


Run-Off Co-eff. 0.70
Rain fall mm/hr 100.00
Flow - Un paved ground cu.m/sec 0.22

2 Area - Roof Sq.m 20045


Run-Off Co-eff. 0.90
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.50

3 Area - Landscape Sq.m 24512


Run-Off Co-eff. 0.30
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.20

Total Flow Required cu.m/sec 0.92

Width mm 1000.00
Average depth mm 900.00

Area of cross section Sqm 0.9000

Wetted Perimeter m 2.800

Hydraulic mean depth m 0.3214

Slope in 1000
Roughness Co.efficient 0.015
Velocity m/sec 0.9892

Total Flow - achieved cu.m/sec 0.8903

Note: Starting depth =0.3m,


Ending depth = 1050m
Considering average depth =900
Free board depth = 0.30
Design of Drain for trench-01

1 Area - paved ground Sq.m 11206


Run-Off Co-eff. 0.70
Rain fall mm/hr 100.00
Flow - Un paved ground cu.m/sec 0.00

2 Area - Roof Sq.m 15683.5


Run-Off Co-eff. 0.90
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.39

3 Area - Landscape Sq.m 0


Run-Off Co-eff. 0.30
Rain fall mm/hr 100.00
Flow - Road cu.m/sec 0.00
550
Total Flow Required cu.m/sec 0.39
700

Width mm 600.00
Average depth mm 700.00

Area of cross section Sqm 0.4200 1800

Wetted Perimeter m 2.000

Hydraulic mean depth m 0.2100

Slope in 750
Roughness Co.efficient 0.015
Velocity m/sec 0.8601

Total Flow - achieved cu.m/sec 0.3612

Note: Starting depth =0.3m,


Ending depth = 1050m
Considering average depth =900
Free board depth = 0.30