Professional Documents
Culture Documents
A: No objection
Proposed Commercial & Residential Development at Kai Tak Area 4C Site 1, Kai Tak, Kowloon (NKIL B: No objection, subject to comments
6553) C: Amendment and resubmission required
HC202108 Updated: D: Rejected and resubmission required
MSS/S/003 Method Statement for Cap and Basement structure construction (B3/F-G/F) - 15/10/2021
MSS/S/005 Method Statement for Erection Works of Tower Crane (TC1, TC2 & TC3) - 15/11/2021
MSS/S/006 Method Statement for modification of hoarding, covered walkway and gantry - 15/11/2021
MSS/S/009 Method Statement for Drill-in rebar Proof Load Test - 30/11/2021
MSS/S/010 Method Statement for Erection of Steel Formwork for Columns - 30/11/2021
MSS/S/012 Method Statement for Installation, Climbing and Dismantling of Lift Shaft Platform - 31/12/2021
MSS/S/013 Method Statement for Dismantling of Lift Shaft Debris Catching Platform - 31/12/2021
Method Statement for Bamboo Scaffolding and Erection of Steel Post for Safety Lifeline at Tower
MSS/S/014 - 31/12/2021
edge
MSS/S/015 Method Statement for Aluminium Formwork Erection - 31/12/2021
MSS/S/016 Method Statement for Podium and Tower construction (1/F-Roof) - 31/01/2022
MSS/S/018 Method Statement for Tower Crane Climbing (TC1, TC2 & TC3) - 31/01/2022
MSS/S/019 Method Statement for Transfer Plate (including Post-Tensioning Works) - 31/01/2022
MSS/S/020 Method Statement for Excavation Works and Drainage Works - 31/03/2022
MSS/S/021 Method Statement for Installation of Material Delivery Platform (Superdek) for Towers - 31/03/2022
MSS/S/022 Method Statement for Installation and dismantling of Lift Shaft Debris Catching Platform - 31/03/2022
MSS/S/023 Method Statement for Installation and dismantling of Material Hoist & Passenger Hoist - 31/05/2022
MSS/S/024 Method Statement for Dismantling Tower Crane (TC1, TC2 & TC3) - 31/07/2022