You are on page 1of 5

BACK UP PERHITUNGAN VOLUME

NO KODE URAIAN PEKERJAAN Panjang Lebar Tebal QTY SAT

A PERMINTAAN STOK LISTRIK


A.1 Kabel NYM HY Uk. 3 x 1.5 mm - - - 1.00 roll
A.2 Stop kontak Uticon 5 lubang 100.00 pcs
A.3 Terminal Kabel 4 mm 40.00 pcs
A.4 Kabel Duct TC 6 50.00 pcs
A.5 Lampu LED E27 9 Watt 100.00 pcs
A.6 Lampu LED TL 9 Watt 100.00 pcs
A.7 Lampu LED TL 18 Watt - - - 100.00 pcs
A.8 In Bow Dos - - - 60.00 pcs
A.9 Isolasi 3M - - - 50.00 pcs
A.10 Kabel NYM Uk. 3 x 2.5 mm 1.00 roll

Page 1 of 5
RENCANA ANGGARAN BIAYA
PERMINTAAN STOK LISTRIK

SATUAN TOTAL
NO URAIAN PEKERJAAN VOL SAT

Material Material
1 2 3 4 6 8 = (3) x (6)

A PERMINTAAN STOK LISTRIK Rp 25,020,000.00


A.1 Kabel NYM HY Uk. 3 x 1.5 mm 1.00 roll Rp 1,350,000.00 Rp 1,350,000.00
A.2 Stop kontak Uticon 5 lubang 100.00 pcs Rp 38,000.00 Rp 3,800,000.00
A.3 Terminal Kabel 4 mm 40.00 pcs Rp 18,000.00 Rp 720,000.00
A.4 Kabel Duct TC 6 50.00 pcs Rp 18,000.00 Rp 900,000.00
A.5 Lampu LED E27 9 Watt 100.00 pcs Rp 42,000.00 Rp 4,200,000.00
A.6 Lampu LED TL 9 Watt 100.00 pcs Rp 51,000.00 Rp 5,100,000.00
A.7 Lampu LED TL 18 Watt 100.00 pcs Rp 68,000.00 Rp 6,800,000.00
A.8 In Bow Dos 60.00 pcs Rp 5,000.00 Rp 300,000.00
A.9 Isolasi 3M 50.00 pcs Rp 8,000.00 Rp 400,000.00
A.10 Kabel NYM Uk. 3 x 2.5 mm 1.00 roll Rp 1,450,000.00 Rp 1,450,000.00

JUMLAH Rp 25,020,000.00

Balikpapan, …………………………..

Teknik - Umum RSPB

Kepala

Lusiana Umar

Page 2 of 5
RENCANA ANGGARAN BIAYA
0

PROGRESS PEKERJAAN
NO URAIAN PEKERJAAN VOL SAT BOBOT
BOBOT PRESENTASE

1 2 3 4 9= (7) + (8) 9= (7) + (8) 9= (7) + (8)

A PERMINTAAN STOK LISTRIK #N/A #N/A


A.1 Kabel NYM HY Uk. 3 x 1.5 mm 1.00 roll #N/A #N/A 80.00
A.2 Stop kontak Uticon 5 lubang 100.00 pcs #N/A #N/A 100.00

A.3 Terminal Kabel 4 mm 40.00 pcs #N/A #N/A 80.00

B #N/A #N/A #N/A

B.1 P-151 #N/A #N/A #N/A #N/A #N/A 100.00

B.2 P-180 #N/A #N/A #N/A #N/A #N/A 100.00

B.3 P-076 #N/A #N/A #N/A #N/A #N/A 100.00

B.4 P-014 #N/A #N/A #N/A #N/A #N/A 100.00

B.5 P-155 #N/A #N/A #N/A #N/A #N/A 60.00

B.6 P-016 #N/A #N/A #N/A #N/A #N/A 60.00

B.7 #N/A #N/A #N/A #N/A #N/A 100.00

B.8 P-121 #N/A #N/A #N/A #N/A #N/A -

B.9 P-255 #N/A #N/A #N/A #N/A #N/A -

B.10 #N/A #N/A #N/A #N/A #N/A 20.00

C #N/A #N/A #N/A


C.1 #N/A #N/A #N/A #N/A #N/A 100.00

C.2 #N/A #N/A #N/A #N/A #N/A 100.00

C.3 P-255 #N/A #N/A #N/A #N/A #N/A 100.00

C.4 #N/A #N/A #N/A #N/A #N/A 85.00

D #N/A #N/A #N/A


D.1 #N/A #N/A #N/A #N/A #N/A 90.00

D.2 P-363 #N/A #N/A #N/A 75.00


#N/A #N/A
D.3 P-364 #N/A #N/A #N/A #N/A #N/A -
D.4 P-367 #N/A #N/A #N/A #N/A #N/A 90.00

E #N/A #N/A #N/A

E.1 #N/A #N/A #N/A #N/A #N/A 100.00

E.2 #N/A #N/A #N/A #N/A #N/A 100.00

Page 3 of 5
PROGRESS PEKERJAAN
NO URAIAN PEKERJAAN VOL SAT BOBOT
BOBOT PRESENTASE

1 2 3 4 9= (7) + (8) 9= (7) + (8) 9= (7) + (8)


E.3 #N/A #N/A #N/A #N/A #N/A 50.00
E.4 #N/A #N/A #N/A #N/A #N/A 100.00
E.5 #N/A #N/A #N/A #N/A #N/A -

F #N/A #N/A #N/A


F.1 A-240 #N/A #N/A #N/A #N/A #N/A 100.00
F.2 #N/A #N/A #N/A #N/A #N/A 100.00
F.3 #N/A #N/A #N/A #N/A #N/A 100.00
F.4 #N/A #N/A #N/A #N/A #N/A 100.00
F.5 #N/A #N/A #N/A #N/A #N/A 100.00
F.6 A-233 #N/A #N/A #N/A #N/A #N/A 100.00

F.7 #N/A #N/A #N/A #N/A #N/A 70.00

F.8 #N/A #N/A #N/A #N/A #N/A 100.00


F.9 #N/A #N/A #N/A #N/A #N/A 100.00
F.10 #N/A #N/A #N/A #N/A #N/A 100.00
F.11 #N/A #N/A #N/A #N/A #N/A 100.00

F.12 #N/A #N/A #N/A #N/A #N/A 100.00

F.13 #N/A #N/A #N/A #N/A #N/A 100.00


F.14 #N/A #N/A #N/A #N/A #N/A 100.00
F.15 #N/A #N/A #N/A #N/A #N/A 100.00

G #N/A #N/A #N/A

G.1 #N/A 2.00 #N/A #N/A #N/A 100.00

G.2 #N/A #N/A #N/A #N/A #N/A 100.00

G.3 #N/A #N/A #N/A #N/A #N/A 50.00

G.4 #N/A #N/A #N/A #N/A #N/A 50.00

G.5 #N/A #N/A #N/A #N/A #N/A 50.00

G.6 #N/A #N/A #N/A #N/A #N/A 100.00

G.7 #N/A #N/A #N/A #N/A #N/A 50.00


G.8 #N/A #N/A #N/A #N/A #N/A 100.00
G.9 #N/A #N/A #N/A #N/A #N/A 100.00

H #N/A #N/A #N/A


H.1 P-380 #N/A #N/A #N/A #N/A #N/A 80.00
H.2 P-381 #N/A #N/A #N/A #N/A #N/A 80.00
H.3 #N/A #N/A #N/A #N/A #N/A -
H.4 P-401 #N/A #N/A #N/A #N/A #N/A 80.00
H.5 P-402 #N/A #N/A #N/A #N/A #N/A 80.00
H.6 P-404 #N/A #N/A #N/A #N/A #N/A 100.00

Page 4 of 5
PROGRESS PEKERJAAN
NO URAIAN PEKERJAAN VOL SAT BOBOT
BOBOT PRESENTASE

1 2 3 4 9= (7) + (8) 9= (7) + (8) 9= (7) + (8)


H.7 #N/A #N/A #N/A #N/A #N/A 100.00

H.8 #N/A #N/A #N/A #N/A #N/A 100.00

H.9 P-389 #N/A #N/A #N/A #N/A #N/A 100.00


H.10 P-382 #N/A #N/A #N/A #N/A #N/A -

I #N/A #N/A #N/A


I.1 P-180 #N/A #N/A #N/A #N/A #N/A 100.00

I.2 #N/A #N/A #N/A #N/A #N/A 100.00

I.3 P-048 #N/A #N/A #N/A #N/A #N/A 100.00

I.4 #N/A #N/A #N/A #N/A #N/A 80.00

I.5 #N/A #N/A #N/A #N/A #N/A 80.00

I.6 #N/A #N/A #N/A #N/A #N/A -

I.7 P-185 #N/A #N/A #N/A #N/A #N/A 90.00

I.8 P-185 #N/A #N/A #N/A #N/A #N/A 90.00

I.9 #N/A #N/A #N/A #N/A #N/A -


I.10 P-183 #N/A #N/A #N/A #N/A #N/A 20.00
I.11 #N/A #N/A #N/A #N/A #N/A 60.00
I.12 #N/A #N/A #N/A #N/A #N/A -

JUMLAH #N/A #N/A -

Balikpapan, …………………………..
Teknik - Umum RSPB
Kepala

Lusiana Umar

Page 5 of 5

You might also like