SUBTOTAL Rp 17,759,440.80
1.2 KABEL FEEDER
1 Main Panel ke Panel Penerangan 1 Mtr 65.00 Rp 189,750.00 Rp 12,333,750.00
NYY 4 x 10 mm2 + BC 10 mm2
2 Panel Penerangan 1 ke Panel Penerangan 2 Mtr 65.00 Rp 129,250.00 Rp 8,401,250.00
NYY 4 x 4 mm2 + BC 4 mm2
SUBTOTAL Rp 20,735,000.00
SUBTOTAL Rp 10,000,000.00
SUBTOTAL Rp 17,759,440.80
4.2 KABEL FEEDER
1 Main Panel ke Panel Penerangan 2 Mtr 65.00 Rp 189,750.00 Rp 12,333,750.00
NYY 4 x 10 mm2 + BC 10 mm2
2 Panel Penerangan 2 ke Panel Penerangan 3 Mtr 65.00 Rp 129,250.00 Rp 8,401,250.00
NYY 4 x 4 mm2 + BC 4 mm2
SUBTOTAL Rp 20,735,000.00
SUBTOTAL Rp 10,000,000.00
SUBTOTAL Rp 17,759,440.80
7.2 KABEL FEEDER
1 Main Panel ke Panel Penerangan 3 Mtr 65.00 Rp 189,750.00 Rp 12,333,750.00
NYY 4 x 10 mm2 + BC 10 mm2
2 Panel Penerangan 3 Mtr 65.00 Rp 129,250.00 Rp 8,401,250.00
NYY 4 x 4 mm2 + BC 4 mm2
HARGA SAT JML HARGA
URAIAN PEKERJAAN SAT VOL
(Rp) (Rp)
PEKERJAAN ELEKTRIKAL LT. 1 SUBTOTAL Rp 20,735,000.00
SUBTOTAL Rp 10,000,000.00
SUBTOTAL Rp 13,117,250.00
TOTAL Rp 655,437,257.90
DIBULATKAN Rp 655,438,000.00