The document provides a cost estimate for fabricating a fuel tank for a Jupiter. It lists the materials, quantities, unit prices, and total prices for 16 different material items. It also provides estimates for labor costs including 25 hours for a supervisor at Rp 75,000/hour, 50 hours each for a welder and helper at Rp 50,000 and Rp 30,000/hour respectively, and equipment costs including 3 hours for a Hiab truck at Rp 900,000/hour and 50 hours each for a welding machine and generator at Rp 50,000 and Rp 30,000/hour. The total estimated cost is Rp 59,698,000.
The document provides a cost estimate for fabricating a fuel tank for a Jupiter. It lists the materials, quantities, unit prices, and total prices for 16 different material items. It also provides estimates for labor costs including 25 hours for a supervisor at Rp 75,000/hour, 50 hours each for a welder and helper at Rp 50,000 and Rp 30,000/hour respectively, and equipment costs including 3 hours for a Hiab truck at Rp 900,000/hour and 50 hours each for a welding machine and generator at Rp 50,000 and Rp 30,000/hour. The total estimated cost is Rp 59,698,000.
The document provides a cost estimate for fabricating a fuel tank for a Jupiter. It lists the materials, quantities, unit prices, and total prices for 16 different material items. It also provides estimates for labor costs including 25 hours for a supervisor at Rp 75,000/hour, 50 hours each for a welder and helper at Rp 50,000 and Rp 30,000/hour respectively, and equipment costs including 3 hours for a Hiab truck at Rp 900,000/hour and 50 hours each for a welding machine and generator at Rp 50,000 and Rp 30,000/hour. The total estimated cost is Rp 59,698,000.
COST ESTIMATE SERVICE OF FABRICATE FUEL TANK FOR JUPITER
UNIT PRICE TOTAL PRICE
DESCRIPTIONS JUMLAH SATUAN IDR IDR A MATERIAL 1 WF 200x100 4 btg Rp 2.200.000,00 Rp 8.800.000,00 2 Plat 6 mm 6 lbr Rp 2.150.000,00 Rp 12.900.000,00 3 Pipa 3" sch 40 5 btg Rp 1.600.000,00 Rp 8.000.000,00 4 Besi Siku 60x60 10 ea Rp 500.000,00 Rp 5.000.000,00 5 Plat 16 mm 6 ea Rp 250.000,00 Rp 1.500.000,00 6 Pipa 3/4 1 btg Rp 500.000,00 Rp 500.000,00 7 Elbow 3/4 4 ea Rp 50.000,00 Rp 200.000,00 8 Baut 16 mm 32 ea Rp 30.000,00 Rp 960.000,00 9 Baut 12 mm 4 ea Rp 25.000,00 Rp 100.000,00 10 Ball Valve 3/4 2 ea Rp 200.000,00 Rp 400.000,00 11 Brether 2" 1 ea Rp 4.500.000,00 Rp 4.500.000,00 12 Soket drat 2" untuk receiver 2 ea Rp 75.000,00 Rp 150.000,00 13 Slang Indikator 3/4 1,5 mtr Rp 250.000,00 Rp 375.000,00 14 Nipple King 3 ea Rp 300.000,00 Rp 900.000,00 15 Cat (All White) 12 ltr Rp 87.000,00 Rp 1.044.000,00 16 Cat Dasar Proxy / Dana Lug 12 ltr Rp 87.000,00 Rp 1.044.000,00 17 Thinner 15 ltr Rp 50.000,00 Rp 750.000,00 Sub Total A Rp 47.123.000,00 B MAN POWER & EQUIPMENT 1 Supervisor 25 Hour Rp 75.000,00 Rp 1.875.000,00 2 Welder 50 Hour Rp 50.000,00 Rp 2.500.000,00 3 Helper 50 Hour Rp 30.000,00 Rp 1.500.000,00 4 Hiab Truck 3 Hour Rp 900.000,00 Rp 2.700.000,00 5 Welding Machine 50 Hour Rp 50.000,00 Rp 2.500.000,00 6 Genset 50 Hour Rp 30.000,00 Rp 1.500.000,00 Sub Total B Rp 12.575.000,00 Grand Total ( A + B ) Rp 59.698.000,00