You are on page 1of 5

HARGA

NO URAIAN PEKERJAAN VOLUME SAT JUMLAH HARGA (Rp)


SATUAN (Rp)

01' PP Elektrikal lt. 2 02' 04' 05' 06'


(include pentanahan
E. PEKERJAAN
panel) lengkap MEKANIKAL/ELEKTRIKAL
1 terpasang dan 1.00 unit 6,500,000.00 6,500,000.00
- berfungsi dengan
Incoming feeder
MCCB 3P 16A 18KA
baik lengkap
(1 pcs)
Amperemeter
terpasang (0-50)A
(3 pcs) (0-500V) (1
Voltmeter
pcs)
Frekuensimeter (45-
55Hz) (1 pcs)
CT 50/5A (3 pcs)
Volt Selector Switch
(1 pcs)
Pilot lamp 220V (3
pcs)
fuse 4A (6 pcs)
Enclosure
Wiring & Accessories
Specification
(1 lot) : Plat
Thickness 1,5mm,
- Finishing
Outgoing powder
Feeder
MCB
coating1P 6A 6 kA (3
pcs)
MCB 1P 10A 6 kA (3
pcs)
a. Lantai Dasar
1 TKO LED 1 X 14,4 Watt 1.00 bh 417,000.00 417,000.00
2 Saklar Grid Switch 4 Modul 1.00 bh 150,000.00 150,000.00

b. Lantai 1
1 TKO LED 1 X 14,4 Watt 1.00 bh 417,000.00 417,000.00
2 Baret Square 20 Watt 1.00 bh 660,000.00 660,000.00
3 Saklar Tukar 2.00 bh 150,000.00 300,000.00
4 Saklar Grid Switch 5 Modul 2.00 bh 150,000.00 300,000.00
5 Titik Inst. Penerangan (NYM 3 X 2,5 mm²) dalam conduit high impact 20 2.00 titik 0.00

c. Lantai 2
1 TKO LED 1 X 14,4 Watt 34.00 bh 417,000.00 14,178,000.00
2 Baret Square 20 Watt 1.00 bh 660,000.00 660,000.00
3 Saklar Ganda 2.00 bh 150,000.00 300,000.00
4 Saklar Tukar 2.00 bh 150,000.00 300,000.00
5 Saklar Grid Switch 5 Modul 2.00 bh 150,000.00 300,000.00
6 Titik Inst. Penerangan (NYM 3 X 2,5 mm²) dalam conduit high impact 20 34.00 titik 100,000.00 3,400,000.00

IV. PEKERJAAN STOP KONTAK


a. Lantai Dasar
1 Stop Kontak Umum 200 VA 2.00 bh 0.00
2 Titik inst. Stop Kontak (NYM 3 X 2,5 mm²) dalam Conduit High Impact Ø 2.00 titik 0.00

c. Lantai 2
1 Stop Kontak Umum 200 VA 2.00 bh 0.00
2 Titik inst. Stop Kontak (NYM 3 X 2,5 mm²) dalam Conduit High Impact Ø 2.00 titik 0.00
3 Penggantung lampu 37.00 titik 6,300,000.00

PEK. PENERANGAN & INSTALASI KABEL AREA BAWAH RAM


1 TKO LED 1 X 14,4 Watt 10.00 bh 8,900,000.00
2 Saklar Grid Switch 4 Modul 1.00 bh 0.00
3 Titik Inst. Penerangan (NYM 3 X 2,5 mm²) dalam conduit high impact 20 10.00 titik 0.00

SUB. JUMLAH E. PEKERJAAN MEKANIKAL/ELEKTRIKAL 43,082,000.00

TOTAL RAB #REF!

TOTAL RAB Y DENGAN PPN 11 % #REF!


HARGA BARU

PEKERJAAN BARU
#REF!
#REF!

#REF!

870,400.00 60,255.00 124,218.00 22,062.00

8,900,000.00

pondasi gali psr suling


7.61 1.50 0.10 12.00
#REF! 2.03 4.50 4.50
#REF! 9.63 6.75 0.45 12.00
50.37 34.50 2.30
60.00 41.25 2.75
#REF!
#REF!
8,381,952.00 406,721.25 55,898.10 264,744.00

90,090,090.09
9,909,909.91
9,109,315.35