You are on page 1of 6

IV.

PEKERJAAN MEP
PEKERJAAN : PEMBANGUNAN GEDUNG RUMAH POTONG HEWAN MODERN
SUB PEKERJAAN : PEMBANGUNAN GEDUNG RUMAH POTONG HEWAN MODERN LOKASI : JL. TROSOBO MINGAS, KRIAN - KABUPATEN SIDOARJO
BILL QUALITY PEKERJAAN MEP
OBO MINGAS, KRIAN - KABUPATEN SIDOARJO
NO URAIAN PEKERJAAN HARGA SATUAN S Vol
(Rp) A
T
PEKERJAAN STANDARD

A. PEKERJAAN ELEKTRIKAL RPH

i Pekerjaan Panel

1 MDP 88,200,000.00 Unit 1.00


2 PP-PL 9,450,000.00 Unit 1.00
4 PP-SP 8,820,000.00 Unit 3.00
6 PP-PS 8,280,000.00 Unit 2.00
7 Panel Incoming Cubical 100,237,500.00 Unit 1.00
8 Panel Outgoing Cubical 422,820,000.00 Unit 1.00
9 Transformer 400 KVA 209,587,500.00 Unit 1.00

Sub. Total
ii Instalasi Kabel Feeder Instalasi Tegangan Rendah

1 Kabel Feeder Instalasi Rendah dari PLN ke MDP


NYFGbY 4 X ( 4 X 95 mm2) 4,200,000.00 150.00

3 Kabel Feeder Instalasi Rendah dari MDP ke PP-PL


NYY 4 X 10 mm2 + BC 1 X 6 mm2 89,100.00 m2 10.00
4 Kabel Feeder Instalasi Rendah dari MDP ke PP-AC
NYY 4 X 185 mm2 + BC 1 X 50 mm2 1,179,000.00 m2 25.00
5 Kabel Feeder Instalasi Rendah dari MDP ke PP-SP
NYY 4 X 2,5 mm2 + BC 1 X 4 mm2 32,400.00 m2 230.00
7 Kabel Feeder Instalasi Rendah dari MDP ke PP-PS
NYY 4 X 2,5 mm2 + BC 1 X 4 mm2 32,400.00 m2 175.00
8 Grounding :
GR-1 Power BC 1 x 50 mm2 38,700.00 m2 50.00
GR-2 Bangunan BC 1 x 50 mm2 38,700.00 m2 100.00
Sub Total
iii Pekerjaan Instalasi Penerangan

1 Armature lampu :
Lampu Downlight Inbow
DLS 900lm - RB 4 " 157,500.00 bh 8.00
DLS 2000lm - RB 6" 220,500.00 bh 5.00
Lampu TL Outbow :
Balk Prem - 1x36 - Ess. LED Tube 1200 mm 16 W 436,500.00 bh 28.00
Weatherproff - 1x36- Ess. LED Tube 1200 mm 16 W 792,000.00 bh 20.00
Weatherproff - 2x36- Ess. LED Tube 1200 mm 16 W 1,422,000.00 bh 81.00
2 Peralatan Instalasi :
Saklar 1 Gang 1 Way 27,000.00 bh 11.00
Saklar 2 Gang 1 Way 27,000.00 bh 18.00
Stop Kontak Umum 16 A 1 gang ( 2P+E ) Schuko 27,000.00 bh 21.00
3 Instalasi :
Instalasi Penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC HI 20 mm2 211,500.00 ttk 145.00
Instalasi Stop Kontak 1 Ø, NYM 3 x 2.5 mm2 dalam conduit PVC HI 20 mm2 216,000.00 ttk 21.00
Instalasi kabel tray 200x100 c/w support 317,000.00 m' 44.00
Instalasi canal C 100 c/w support 74,200.00 m' 180.00
Sub total

B PEKERJAAN MEKANIKAL

i Pekerjaan Instalasi Air Bersih

1 Instalasi Pompa Booster 1Ø, NYM 3 x 2,5 mm2 dalam conduit PVC HI 20 mm2 1,620,000.00 ttk -
pompa transfer sumur dalam otomatis - semi jet 9ari tanah kedalaman ± 15 meter
JD basic 7 / 1,85 kW, Kapasitas = 2X36 liter/menit, Head = 60 m 43,200,000.00 set 1.00
Instalasi Pompa Booster 1Ø, NYM 3 x 2,5 mm2 dalam conduit PVC HI 20 mm2 1,260,000.00 ttk 1.00
2 Gate valve, Bronze Body, Screwed, Class 125 :
Ø25 mm / 1" 256,500.00 bh 6.00
Ø 32 mm / 1 1/4 " 310,500.00 bh 6.00
Ø 40 mm / 1 1/2 " 409,500.00 bh 1.00
9 Pemipaan polypropelyne (PPR) Class PN 10 :
Ø 32 mm / 1" 88,200.00 m2 107.51
Ø 32 mm / 1 1/4 " 108,000.00 m2 75.69
Ø 63 mm / 2" 189,000.00 m2 25.00
11 Tandon air bersih kap. 12 m3 23,400,000.00 set 1.00

Sub Total
ii Pekerjaan Instalasi Air Bekas, Kotor & Vent

1 Pemipaan PVC AW Kelas 10 kg/cm2 :


Ø 75 mm / 2 1/2" 62,100.00 m3 2.73
Ø 90 mm / 3" 81,000.00 m3 41.98
Ø 160 mm / 6" 193,500.00 m3 106.29
2 Pemipaan PVC D Kelas 5 kg/cm2 :
Ø 40 mm / 1 1/4 " 34,200.00 m3 15.00
3 Lain-lain
Septic tank bio filter kapasitas 3 m3 9,720,000.00 set 1.00
Sub Total
Total
Jumlah KETERANGAN
harga

88,200,000.00
9,450,000.00
26,460,000.00
16,560,000.00
100,237,500.00 Item/Harga Baru
422,820,000.00 Item/Harga Baru
209,587,500.00 Item/Harga Baru

873,315,000.00

630,000,000.00

891,000.00

29,475,000.00

7,452,000.00

5,670,000.00

1,935,000.00
3,870,000.00
679,293,000.00

1,260,000.00
1,102,500.00

12,222,000.00
15,840,000.00
115,182,000.00

297,000.00
486,000.00
567,000.00

30,667,500.00
4,536,000.00
13,948,000.00
13,356,000.00
209,464,000.00

43,200,000.00
1,260,000.00

1,539,000.00
1,863,000.00
409,500.00

9,482,382.00
8,174,520.00
4,725,000.00
23,400,000.00

94,053,402.00
169,533.00
3,400,380.00
20,567,115.00

513,000.00

9,720,000.00
34,370,028.00
1,890,495,430.00