You are on page 1of 1

MINUTE OF MEETING

Date, Time : 22/12/2022 Approval by : Page :      1    of     1       


Place : Office Plant. Lt 1
1 2 3 4 5 6

Meeting Koordinasi Hopper Expander Line Pasting

No Item/Kondisi PIC DD
1 Tools Hopper Expander & Eksisting
- Mapping kaset & nakanuki hopper eksisting & expander (drawing masing-masing type) PROD 30 Des 22
- Register drawing kaset & nakanuki hopper to PRE PROD 28 Des 22

2 Maintenance Item (Schedule)


- Standar pengecekan hopper (critical point) PRE 30 Des 22
- Pembuatan checksheet pengecekan hopper MWS 13-Jan-23
- Setiap penggantian hopper include dengan shaft cylinder, baut & mur pengunci hopper, cover (depan & belakang) MWS W4 Jan 23
- Drawing part hopper expander rev. terbaru PRE 30 Des 22
- Pembuatan schedule PM hopper (per 2 minggu) MWS 13-Jan-23
- PRE mengirimkan drawing hopper eksisting PRE 30 Des 22

Note : *Mulai bulan ini setiap hopper expander (original design) breakdown langsung direct to MWS,
*Untuk hopper expander modifikasi (masih dalam project Eng) langsung direct to kaizen prod. & PRE

Keterangan
Hadir : HMD, BMK, IHS, BH, SPY, AR

Note: Participants present can be seen in the attendance list

Revision : 5

You might also like