• LAPI-CI-DED-0052_4 • 1
LOCATION:
INFORMATION REQUESTED:
Mengacu pada percepatan Pembangunan jembatan botudulangga bridge dan hasil diskusi antara MMS dan HPP terkait
perubahan desain diapragma yang mulanya direncakan precast dirubah menjadi in-situ, maka berikut kami lampirkan dan
ajukan desain penulangan diafargma girder PCI H170 dan H210 yang kemudian dikonfirmasi.
Page 1 of 3
PREPARED BY ENG.COORDINATOR : Moh Hamdani DATE: 26.02.24
IMPORTANT
Acceptance with or without comments of vendor’s drawing or documents shall not relieve the
vendor from complying with all terms, conditions, codes, standard & requirements of order &
specification. Re-submit when a revision is made to the drawing or document by the
manufacture or by sub-sequent.
Page 2 of 3
SPECIFICATION(S) RESPONSE: REV.: CN/FCR:
• • •
Page 3 of 3
PREPARED BY ENG.COORDINATOR : Moh Hamdani DATE: 26.02.24
4 D13
53.54 m
4 D13
4 D13
4 D13
8 D13
IMPORTANT
Acceptance with or without comments of vendor’s drawing or documents shall not relieve the
vendor from complying with all terms, conditions, codes, standard & requirements of order &
specification. Re-submit when a revision is made to the drawing or document by the
manufacture or by sub-sequent.
Page 2 of 3