You are on page 1of 5

ENGINEERING

MEMO 28 Feb 2024


PANI PROJECT

EM NUMBER: 013/EM/PT-HPP/II/2024 PROJECT NAME: BOTUDULANGGA BRIDGE


PREPARED BY: Moh Hamdani DATE: 26.02.2024
SUBJECT : Propose Diapragma Design
LOCATION: Botudulangga Bridge
DISCIPLINE: Civil Works
TO: MMS – LAPI ITB OF:
REFERENCE DRAWING(S) OR DOCUMENT(S): REV.: DCN/FCN:

• LAPI-CI-DED-0052_4 • 1

SPECIFICATION(S): REV.: CN/FCR:


• • •

LOCATION:
INFORMATION REQUESTED:
Mengacu pada percepatan Pembangunan jembatan botudulangga bridge dan hasil diskusi antara MMS dan HPP terkait
perubahan desain diapragma yang mulanya direncakan precast dirubah menjadi in-situ, maka berikut kami lampirkan dan
ajukan desain penulangan diafargma girder PCI H170 dan H210 yang kemudian dikonfirmasi.

REASON FOR EM: To Approval The Design


DATE REPLY REQUIRED BY:
IMPACTS:

Page 1 of 3
PREPARED BY ENG.COORDINATOR : Moh Hamdani DATE: 26.02.24

REVIEWED BY PROJECT MANAGER : Kasmat Saleh Nur DATE: 26.02.24

RESPONSE BY: Fajar Alfin Nugroho DATE: 28.02.24

Please state jumlah rebar


atau jarak antar rebar
dalam penulangan

DOCUMENT REVIEW STATUS

Proceed, no exception taken

Proceed subject to incorporation


Date: 28.02.24
of changes indicated. Revise & Re-Submit

Do not proceed. Undertake changes By: Fajar A. N.


noted and re-submit

Review not required work may proceed Sign:

IMPORTANT
Acceptance with or without comments of vendor’s drawing or documents shall not relieve the
vendor from complying with all terms, conditions, codes, standard & requirements of order &
specification. Re-submit when a revision is made to the drawing or document by the
manufacture or by sub-sequent.

REVIEWED BY CONSULTANT COORDINATOR: DATE:


REFERENCE DRAWING(S) OR DOCUMENT(S) RESPONSE: REV.: DCN/FCN:
• • •
• • •

Page 2 of 3
SPECIFICATION(S) RESPONSE: REV.: CN/FCR:
• • •

Please replace PC Strand


dengan 2-D25 rebar dan
grouting semua lubang
pada diafragma tepi PCi
170 dan PCI 210

Please replace PC Strand


dengan 2-D25 rebar dan
grouting semua lubang
pada diafragma tepi PCi
170 dan PCI 210

Page 3 of 3
PREPARED BY ENG.COORDINATOR : Moh Hamdani DATE: 26.02.24

REVIEWED BY PROJECT MANAGER : Kasmat Saleh Nur DATE: 26.02.24

RESPONSE BY: UMAR SUNA DATE: 15.03.24

4 D13
53.54 m

4 D13
4 D13

4 D13

8 D13

Refer to LAPI Drawing


and please make sure concrete grade is min. 30 Mpa

DOCUMENT REVIEW STATUS

Proceed, no exception taken


Date: 19 Mar 24
Proceed subject to incorporation
of changes indicated. Revise & Re-Submit

Do not proceed. Undertake changes By:


Roni F
noted and re-submit

Review not required work may proceed Sign:

IMPORTANT
Acceptance with or without comments of vendor’s drawing or documents shall not relieve the
vendor from complying with all terms, conditions, codes, standard & requirements of order &
specification. Re-submit when a revision is made to the drawing or document by the
manufacture or by sub-sequent.

REVIEWED BY CONSULTANT COORDINATOR: DATE:


REFERENCE DRAWING(S) OR DOCUMENT(S) RESPONSE: REV.: DCN/FCN:
• • •
• • •

SPECIFICATION(S) RESPONSE: REV.: CN/FCR:


• • •

Page 2 of 3
Page 3 of 3