This document provides instructions for nighttime work at the Quebrada Blanca Fase 2 project. It was submitted by Consorcio Besalco QB2 S.A., the supplier/contractor, and given an initial review status of 1 by Bechtel, allowing work to proceed while incorporating any editorial comments if revised. The document number is 25800-500-V44-MHLP-02524 and is titled "Instructivo de Trabajo Trabajos Nocturnos", which translates to "Work Instruction Night Work".
This document provides instructions for nighttime work at the Quebrada Blanca Fase 2 project. It was submitted by Consorcio Besalco QB2 S.A., the supplier/contractor, and given an initial review status of 1 by Bechtel, allowing work to proceed while incorporating any editorial comments if revised. The document number is 25800-500-V44-MHLP-02524 and is titled "Instructivo de Trabajo Trabajos Nocturnos", which translates to "Work Instruction Night Work".
This document provides instructions for nighttime work at the Quebrada Blanca Fase 2 project. It was submitted by Consorcio Besalco QB2 S.A., the supplier/contractor, and given an initial review status of 1 by Bechtel, allowing work to proceed while incorporating any editorial comments if revised. The document number is 25800-500-V44-MHLP-02524 and is titled "Instructivo de Trabajo Trabajos Nocturnos", which translates to "Work Instruction Night Work".
Document Title: Instructivo de Trabajo Trabajos Nocturnos
Document Number: 25800-500-V44-MHLP-02524
Document Revision: 0
Document Submittal: 001
Equipment Number (if applicable): N/A
DOCUMENT REVIEW STATUS STAMP (To be filled by Bechtel)
Job No 25800 Project
SELLER/CONTRACTOR DOCUMENT REVIEW
Permission to proceed does not constitute acceptance or approval of design detail,
calculations, analysis, test methods, or materials developed or selected by Seller/Contractor, and does not relieve the Seller/Contractor from full compliance with contractual obligations
WORK MAY PROCEED, Editorial comments need only be
1 incorporated if document revised and resubmitted