Date: January 28, 2022

Bridge Name:
Bridge Location:
District:
Consultancy:
Designer:
Response from the Consultant / Designer Final Remarks
General
Date: January 28, 2022

Bridge Name:
Bridge Location:
District:
Consultancy:
Designer:
Response from the Consultant / Designer Final Remarks
Reply of comments
1. The design is done in working stress method The design is revised in Limit state method i.e. as
i.e. as per IRC21. It is requested to revise the per IRC112.
design in Limit state Method i.e. as per IRC 112

2.0 The type of foundation in salient feature is The type foundation in salient feature is corrected
written as pile foundation when design is done
for open foundation. Please correct.

3.0 Ga.Pa./Na.Pa. name of both banks should be Ga.Pa./Na.Pa. name of both banks is given in salient
given in salient features. Please provide features.

4.0 Please provide survey reports containing Survey report is provided containing TOPO Map
TOPO Map including Dcards and axis reference including Dcards and axis reference points with
points with photographs as well. photographs as well.

On Hydrological Calculations
No hydrological analysis report was submitted. Detailed Hydrological analysis report is submitted
Detailed hydrology report shall be submitted with with design discharge calculation, HFL calculation
design discharge calculation, HFL calculation and and scour depth.
scour depth

On Geotech / Foundation