Professional Documents
Culture Documents
Item Description D
SUB-PROJECT PARTICULARS
Name of Parties
D Employer: Gamworks
Kanifing Industrial Area
DRAWINGS/SKETCHES
H Dwg Nr (Architectural):
J Dwg Nr (Engineer):
1
Construction of Bansang Access Road Preliminaries
Road Works
Construction of Tar Road within the village of Bansang including all the
required hydraulic Structures and slope protection works
2
Construction of Bansang Access Road Preliminaries
B .2 The Contractor shall include or allow for complying with the Conditions of
Contract and for the convenience of pricing, the headings of articles are
set out below. The Contractor shall be deemed to have full knowledge of
such articles before pricing this item.
C TABLE OF CLAUSES
A GENERAL
1 Definitions
2 Interpretation
5 Delegation
6 Communications
7 Subcontracting
8 Other Contractors
9 Personnel
11 Employer's Risks
12 Contractor's Risks
13 Insurance
3
Construction of Bansang Access Road Preliminaries
19 Safety
23 Instructions
24 Disputes
26 Replacement of Adjudicator
B TIME CONTROL
27 Program
29 Acceleration
31 Management Meetings
32 Early Warning
C QUALITY CONTROL
33 Identifying Defects
34 Tests
35 Correction of Defects
36 Uncorrected Defects
D COST CONTROL
37 Bill of Quantities
39 Variations
4
Construction of Bansang Access Road Preliminaries
43 Payments.
44 Compensation Events
45 Tax
46 Currencies
47 Price Adjustment
48 Retention
49 Liquidated Damages
50 Bonus
51 Advance Payment
52 Securities
53 Dayworks
54 Cost of Repairs
56 Taking Over
57 Final Account
59 Termination
61 Property
5
Construction of Bansang Access Road Preliminaries
63 Suspension of Credit
The Contract/Sub-contract
Quality standards/Control
Security/Safety/Protection
Facilities/temporary works/services
Mechanical plant
Temporary works
Nominated sub-contracts
Nominated suppliers
6
Construction of Bansang Access Road Preliminaries
Provisional
dayworks
7
Construction of Bansang Access Road Preliminaries
BILL No 1 SUMMARY
Page 1
Page 2
Page 3 -
Page 4 -
Page 5 -
Page 6 -
Page 7 2,000,000.00
8
Construction of Bansang Access Road Preliminaries
9
Construction of Bansang Access Road Bill 2 - Main Bill
Item Description Qty. Unit Rate Amount (GMD)
1 Earthwork
2 Concrete Works
3 Reinforcement
4 Form Work
5 Drainage
Preliminaries -
TOTAL 4,165,875.00