QUALITY SYSTEM PROCESS DOC.NO.

REV.NO.
DB-PRD-P-01
02
Assembly and Production DATE 26.10.2023
PAGE NO PAGE 1 OF 2

1. PROCESS FLOW:

STEP. ACTIVITY RESP. REF. DOC.


NO
1. For Built-to Print (BTP) projects - Receive the Project -
Production files (BOM/Drawings/Procedures etc.) Leader
from customer
2. For Built-to Spec (BTS) projects - Receive the Project -
Production files (BOM/Drawings/Procedures etc.) Leader
from Design & Dev dept.
3. On the basis of Purchase order received from Commercial -
Customer, Sales order is created in SAP. / BD
4. Based on the details provided by customer/D&D, Engineering DB-ENGG-F-05
BOM is created.
5. PRs are generated for RM/bought out items for Production -
making items/Assemblies. Incharge
6. Production Order is raised in SAP. Purchase/ DB-PRD-F-05
Material Issue slip is made for the items to get Store In
issued from store to Production locations. charge
7. Material w.r.t Requisition is issued to production. Store In
Charge
8. As per production schedule given in Sales Order, Production DB/PRD/F/02
Production plan is prepared for executing the order Incharge
within the proposed timeframe.
9. Production activities will start once the Production Production DB/PRD/F/05
order is issued. Incharge
10. Production will ensure the availability of drawings, Production -
ATP, any specific instruction from design etc. In charge
before starting the Production.
11 Production will prepare Route card, Assembly Production -
Procedures, Work Instruction, etc. in accordance In charge
with design requirements before starting the
production activities.
12. Production activities are monitored through Route Production DB/PRD/F/01
cards and recorded where needed. Incharge
13. Perform Integration & Testing as per Acceptance Production DB/ENGG/F/06
Test Procedure (ATP). Incharge

Prepared By: Gurunath Approved By : Vishwakarma Issued By: Shilpa Shree

Date: 26.10.2023 Date: 26.10.2023 Date: 26.10.2023


QUALITY SYSTEM PROCESS DOC.NO.
REV.NO.
DB-PRD-P-01
02
Assembly and Production DATE 26.10.2023
PAGE NO PAGE 2 OF 2

2. Change History
Rev No. Rev. Date Details of Change Change Change
Recommended Approved By
By
00 16.03.2021 AS 9100D MR MR
01 05.12.2022 Some requirements of Additive MR MR
Manufacturing was added
02 26.10.2023 As per the observation found during MR MR
External Audit of AS9100D

Prepared By: Gurunath Approved By : Vishwakarma Issued By: Shilpa Shree

Date: 26.10.2023 Date: 26.10.2023 Date: 26.10.2023