No. JOB SITE TAG UNIT MODEL UNIT TYPE STATUS HM/KM BD DATE PROBLEM PLAN ACTION ETA PARTS REMAKS DAY READY PR DATE PO DATE SCHEDULE BD Replace Oil Engine, Water Sparator, Oil Filter, Fuel 1 BKL UN AB 231 PC-400SE-8R P1 OPS 10.042 11-Dec-21 0 PM IV 11-Dec-21 Filter Replace Oil Engine, Water Sparator, Oil Filter, Fuel 2 BKL UN TR 135 SCANIA P-360 P1 OPS 9.526 11-Dec-21 0 PM II 11-Dec-21 Filter UNSCHEDULE BD A2B EQUIPMENT Progress Install Injector, Completed Check & 1 BKL UN AB 036 D7G P1 BD 1.166 20-Nov-21 21 Overheating Engine Groundtest 2 BKL UN AB 111 D155A-6 P3 BD 14.812 05-Dec-21 6 Radiator Leak Radiator Send Musi 2 for Repair 3 BKL UN AB 228 PC-300-8 P3 BD 7.452 28-Nov-21 13 Injector Problem Injector send to Musi 2 for Calibrasion 4 BKL UN AB 221 PC-400SE-8R P3 BD 9.464 07-Dec-21 4 Oil Cooler Leak Cooler Send to Musi 2 for Repair 5 BKL UN AB 226 PC-300-8 P3 BD 8.538 08-Dec-21 3 Injector Problem Injector send to Musi 2 for Calibrasion RIGID DUMP TRUCK EQUIPMENT Engine Noice - Supply pump assy swape ke TR 055 - Main harness swape ke TR 055 - Shaft & coupling dumper Wiring Harness Del Musi2 1 BKL UN TR 057 HD465-7R P3 BD 16.591 29-Jun-21 165 OH Engine - Musi 2 Waiting PR - Charge pump to TR 056 (Repair) - Bolt bracket transmisi swab ke TR 056 - Pipe Transmisi C/D to TR 056 - Serpo Valve C/D to TR 055 Tyre Ready, Plan Waiting Rotation Tyre UN TR 056 2 BKL UN TR 059 HD465-7R P3 BD 10.943 01-Dec-21 10 Low Power, Tyre No.5 Broken (Waiting Acces Road for move unit UN TR 056 from PIT PO 007215 (Tyre) 03-Dec-21 Part Complete Stop to Workshop) DUMP TRUCK EQUIPMENT Progress Running Engine - Done date 8/12/21 1 BKL UN TR 156 SCANIA P-360 P1 BD 6.601 07-Jul-21 157 Engine jamed (Unit Accident) Completed Part Waiting Parts, Cylinder Dump Sent Musi 2 Date 2 BKL UN TR 110 CWE 280 P3 BD 28-Aug-21 105 Cylinder Dump Abnormal 03/10/21 for Repair Plan Fabrikasi Valve Pump Dump 3 BKL UN TR 131 SCANIA P-360 P2 BD 21-Sep-21 81 Accident (Kaca Depan Pecah) Waiting Sling Lock Door by Trinity 13-Dec-21 Hub Axle Rear Repair di M2 Differential Axle Problem, Hub Axle Rear Crack, Oil Leak, Oil PO 006179 (Fan 4 BKL UN TR 169 SCANIA P-360 P3 BD 18-Oct-21 54 Transmission loaned to site Darmo & Final Drive loaned 28-Nov-21 Waiting Supply Colector C/D to UN TR 159 Radiator) to Musi 2 5 BKL UN TR 170 HINO 500 P3 BD 7.615 28-Oct-21 44 Engine Problem Plan OH Engine di Musi 2 Accident (Kaca Pintu Kiri Pecah, Spion Kiri Pecah, Mounting 6 BKL UN TR 180 SCANIA P-360 P3 BD 9.691 07-Nov-21 34 Waiting Progress Asuransi PO 007286 (Assuransi) Engine Broken) Progress Remove Differential 7 BKL UN TR 181 SCANIA P-360 P2 BD 7.532 28-Nov-21 13 Differential Problem C/D Part from UN TR 169 8 BKL UN TR 178 HINO 500 P3 BD 3.556 02-Dec-21 9 Engine Problem Plan OH Engine di Musi 2 DEWATERING EQUIPMENT 1 BKL UN AB 052 CF.48 H SS P2 BD 01-Dec-21 10 Supply Pump Problem Recommended parts TOWER LIGHT EQUIPMENT SUPPORT EQUIPMENT PO 006767 (Spring RR 15-Nov-21 Part Complete Injector Problem Waiting Parts Injector, Shock Absorber, Mounting No.1,4 & Clamp Spring) 1 BKL UN 864 TRITON(DC) P3 BD 03-Nov-21 38 Spring No.1,4 & Clamp C/D To LV 863 Engine RH-LH, Insulator T/M, Stopper T/F Mounting PR 006513 (Injector, etc) 05-Dec-21 Waiting PO FORD RANGER 2 BKL UN 862 P2 BD 15-Nov-21 26 Engine Can't Running Waiting Parts Injector PR 006628 (Injector) 10-Dec-21 Waiting PO AMBULANCE 3 BKL BUS 02 PS125 P2 BD 20-Nov-21 21 Propeller Shaft RR Broken Waiting Unit Move to Workshop Part Complete PO 007210 (Pompa 4 BKL UN 511 CWB45 P3 BD 30-Nov-21 11 Master Clutch Atas, Shaft Pompa Broken 03-Dec-21 Waiting Supply Ebara)