Unit RFU OWN BD REMARK HM BD DATE BD TIME EST RFU PIT LOC
(2022) Number
PMS 300 Hrs (SC/PM) Complete engine parts, on progress Repair Bracket Torque Rod Apar, Repair hinge torque rod upper
DT2522 27932.5 1-Nov-22 06:57 24-Dec-22 Workshop
RH/LH, Install sliding operator seat, Complete parts. Resistor blower motor failure
Radiator contamination & Hose air pressure leaks (UNS/COS) Coolant mix oil, Dissamble oil cooler transmission, Replace Oil
DT1108 16818,7 2-Nov-22 8:55 25-Dec-22 Workshop
7 5 DH 2 Cooler done, Radio N/A, Lock steering N/A, Bolt lower shock abshorber N/A
SCANIA P410
DT1134 Rubber shock braker RH worn out, Clam spring RH missing (UNS-P/SUS) 22-Dec-22 7:43 24-Dec-22 Parkiran AMJ
SCANIA P380 1 0 DH 1 DT1096 Steering system linkage worn out & steering gearbox swap to unit ACP (UNS-P/STR) Waiting Part 22970 21-Apr-21 8:39 24-Dec-22 Workshop
4 3 DH 1 Engine blowby (UNS/ENG) Regasket cyl head, Repaired & Installed Intercooler, test performance still problem ECM to
GRADER XCMG GR3005 GR3053 6493 14-Dec-22 19:00 30-Dec-22 Workshop
solenoid cut off and solenoid Priming Pump problem. Continue troubleshooting
GRADER SANY STG230C-8S 2 2 DH 0
GRADER CATERPILLAR 14H 2 1 WBS 1 HGR3064 Transmission leak WBS
COMPACT CATERPILLAR CS10GC 1 1 DH 0
COMPACT SANY 1 1 DH 0
DOZER LIEBHER PR754 5 4 DH 1 Oil final drive mix with hydraulic oil (UNS-P/HYS) Waiting parts and Hyd pump swapped to TD1227 Disassembly Final drive
TD1217 6344,8 14-Oct-22 14:54 24-Dec-22 Pit Stop
assy for replace seal brake and disc brake
7 5 DH 2 TD1222 Transmission can't reversed, Finding particles in T/M and need to disassembly (WA) Operator seat swap to TD1242 5069.5 19-Nov-22 3:00 TBA Workshop
DOZER SHANTUI D22E
TD1242 Pin track link RH loose (UNS/UNC) On progress 4609,6 24-Dec-22 15:18 20:00 BC 3
Total 23 17 6
DEWATERING
PUMP DND LCCCH-200-610. 2 2 JMI 0
Total 2 2 0
SUPPORT & FACILITY
FT1129
MERCY 2528 3 3 DH 0 FT1153
FT1132
Total 3 3 0
Service truck
VOLVO FM380 1 1 DH 0 ST1093
MAINTENANCE COMPONENT
DESCRIPTION REMARK Description
CODE
CODE
STA Starting System
SC Plan Schedule Service, Replacement major component dari planner CRG Charging System
UNS Unschedule Breakdown, replace part saat breakdown yang tidak direncanakan planner ETC Electronic Control
UNS-P Unschedule Predictive Backlog, breakdown terprediksi sebelumnya (terdapat orderan) EFS Engine Fuel System