You are on page 1of 50

West Karoun Area NGL 3200 Project

Specification For Painting


PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 1 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

13-Feb-2018

SPECIFICATION FOR PAINTING

Contract No. : ‫ن‬.‫ت‬.‫ – م‬91 – 754 Date: 20/01/2013

Client : Yadavaran Persian Gulf Gas Refining Co.

D12 13.Feb.2018 AFC (Revised As Indicated) Al.Gitinezhad S.Movahedi Me. Fouladi B. Tabatabaie A. Divan Bachari
D11 13.Jul.2016 AFC (Revised As Indicated) Al.Gitinezhad S.Movahedi Me. Fouladi B. Tabatabaie M. Sakhaie
D10 25.Jan.2016 AFC (Revised As Indicated) AL.Gitinezhad S.Movahedi Me. Fouladi J.Jazayeri M.Sakhaie
D09 28.Dec.2015 AFC (Revised As Indicated) AL.Gitinezhad S.Movahedi Me. Fouladi J.Jazayeri M.Sakhaie
D08 23.Nov.2015 AFC (Revised As Indicated) AL.Gitinezhad S.Movahedi Me. Fouladi J.Jazayeri M.Sakhaie
D07 14.Oct.2015 AFC (Revised As Indicated) AL.Gitinezhad S.Movahedi Me. Fouladi J.Jazayeri M.Sakhaie
D06 22.Sep.2015 AFC (Revised As Indicated) AL.Gitinezhad S.Movahedi Me. Fouladi J.Jazayeri M.Sakhaie
D05 06.Jun.2015 AFC (Revised As Indicated) AL.Gitinezhad S.Movahedi Me. Fouladi J.Jazayeri M.Sakhaie
D04 29.Apr.2015 Approved for Construction AL.Gitinezhad S.Movahedi Me. Fouladi P. Heydari M.Sakhaie
D03 26.Jan.2015 Approved for Construction A.vosoughi M.Amini M.Mesbahzadeh P. Heydari M.Sakhaie
D02 12.Jan.2015 Approved for Construction A.vosoughi M.Amini M.Mesbahzadeh E.Hamidkerdar M.Sakhaie
D01 22.Sep.2014 Issued For Comments A.vosoughi M.Amini M.Mesbahzadeh E.Hamidkerdar M.Sakhaie
D00 12.Feb.2014 Issued For Comments A.vosoughi M.Amini M.Mesbahzadeh E.Hamidkerdar A.Abbasi
Contractor’s Client
Rev. Issue Date Purpose of Issue Prepared Checked Approved
Approval Approval
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 2 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
TABULATION OF REVISED PAGES

Page REVISION
D00 D01 D02 D03 D04 D05 D06 D07 D08 D09 D10 D11 D12
1. X X X X X X X X X X
2. X X X X X X X X X X
3. X
4. X X X
5. X X X X X
6. X X X X
7. X X X
8. X X X X X
9. X X X X X X
10. X X X X X
11. X X X X X
12. X X X X
13. X X X X
14. X X X
15. X
16.
17.
18. X
19. X
20. X
21.
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 3 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

Table of Content

1. GENERAL STATEMENT ................................................................................................................. 4


2. ADDENDUM ........................................................................................................................................ 4
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 4 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
1. GENERAL STATEMENT
The attached Painting Specification General Specification No. NGGG-001-ENPI-SPPA-0001
Rev.B02 is confirmed as the Project Specification, except as amended herein, and
renumbered/reissued as specification No. NGWK-0001-ENPI-SPPA-2308 for west karoun area
NGL3200 Project.

2. ADDENDUM
The following items refer to the attached Painting Specification General Specification No.NGGG-
001-ENPI-SPPA-0001 REV B02 the clauses set out below modify or replace the existing clauses in
the original specification as noted.

(Page-4-Section 1.1):
Shall be replaced with:

The purpose of constructing this factory is to receive Sour Gas from ARVANDAN oil field and
process it to produce the following products:
• C2+
• Lean Gas
• Sulfur
The above mentioned products have been intended for internal consumption as well as export
purposes. The NGL plant will be constructed in 2 phases.

• Feed
500 million ft3 per day Sour Gas in 2 phases (250 million ft3 in each phase)

• Location

South West of Ahwaz (Jofeir)

(Page-4-Section 1.2):
Shall be replaced with:

PROJECT West Karoon NGL3200 Plant

CLIENT Yadavaran Persian Gulf Gas Refining Co.


West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 5 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

OWNER Persian Gulf Petrochemical Industries Co.(PGPIC)

CONSULTANT Energy Industries Engineering & Design (EIED)

CONTRACTOR Khatam-al Anbiya (Construction Headquarter-Noah


Expert Group) is Lead organization that is selected for
completing of the project from design to start up. All
other organizations that perform a part of the project on
behalf of this lead organization shall be called as sub-
contractor.
SUB- E/EP/EPC Contractors who shall execute at least
CONTRACTOR Engineering & procurement of the project packages and
who co-operates with each other various combinations
for successful completion of her project.
VENDOR Refers to person(s) or company (ies) entering into
contract or agreement to supply and /or fabricate the
material and /or Equipment with the requirements of the
Project.
SUPPLIER Any organization which will be selected to supply the
equipment or/and materials from one or more vendors.
Purchaser Organization that release an inquiry for material or
equipments for use in Project as a legal representative of
Client / Contractor.
PLANT Shall mean permanent facilities designed, constructed and
completed as a result of execution of the WORK.
SITE Shall mean the premises and places on, under, in, over or
through which the WORK is to be executed or carried
out including Contractor's engineering office and the
PLANT.
May is used where alternatives are equally acceptable;

Shall Is used where a provision is mandatory

Should Is used where a solution is preferred

Will Is used normally in conjunction with a request from


CONTRACTO

Page-5-Section 1.3:
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 6 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
“Basic Engineering” shall be replaced by
“Detail Engineering”.

Clause 2.2 should be replaced with the following (Page-6):

2.2 PAINT SCHEDULE


Project surface preparation and paint schedules are indicated in following Tables. All temperature
ranges indicated in the tables are maximum operating of the pipe and/or equipment and not design
temperatures.
Painting are required for all A/G Piping, Towers, Vessels, Drums, Exchangers, Columns, External
Surface of Storage Tanks, Steel structures (such as shelters and etc.), Pipe rack, Ladder & Platforms,
Handrail, Stairway and Cages, and Galvanized surfaces (except galvanized piping items which do not
require painting (note-1)) as following:
Painting for miscellaneous mechanical & electrical equipment, firefighting & first aid equipment,
machinery, switch transformers, instruments, instrument panels, consoles and cabinets shall be
according to manufacturer’s standard and should be subject to contractor approval.
Note-1: Just Galvanized piping in fire water services shall be painted according with the RAL number
specified in section “paint color schedule”.
Table 1- External Painting systems for carbon steel and low alloy steels
System
NO Description
Coat

Atmospheric exposure (Up to + 120 °C)- Insulated except Personnel Protection


1 CN-1
Insulation

Atmospheric exposure (Up to + 120 °C)- Uninsulated and Personnel Protection


2 CN-2
Insulation

Atmospheric exposure(120 °C to 200 °C)- Insulated except Personnel Protection


3
Insulation
CN-3
Atmospheric exposure(120 °C to 200 °C)- Uninsulated and Personnel Protection
4
Insulation

Atmospheric exposure (200 °C to 450 °C)-Insulated except Personnel Protection


5
Insulation
CN-4
Atmospheric exposure (200 °C to 450 °C)-Uninsulated and Personnel Protection
6
Insulation
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 7 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

System
NO Description
Coat

7 Epoxy based fire protection CN-5

8 Cement based fire protection CN-6

Table 2- Internal Painting systems for carbon steels


NO Description System Coat

1 Gas Condensate I-1

2 Diesel Oil I-2

3 Methanol I-3

4 Industrial water (Fire, Raw, Demineralized, etc.) I-4

5 Potable water I-5

6 Spheres I-3

Table 3- External Painting systems for stainless steels


NO Description System Coat

1 Atmospheric exposure (Up to 120 °C)-Uninsulated SN-1

2 Atmospheric exposure (Up to 120 °C)-Insulated SN-2

3 Atmospheric exposure (120 °C to 450 °C) SN-3

Table 4- External Painting systems for Galvanized Surfaces

NO Description System Coat

Atmospheric exposure- Hot Dip Galvanized


1 ON-1
Up to 120 °C
Note: Galvanized surfaces to be painted when specified for color coding or safety consideration
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 8 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

Table 5- External Painting systems for carbon steel, low alloy steel and stainless steel Buried
Equipment
NO Description System Coat

1 Buried Equipment Up to 180 °C BE-1

Table 6- Detail of Painting System for carbon steel and low alloy steels
Total DFT
System

Surface Cleanness layer Painting System DFT (μm)


(μm)

1 Epoxy Phenolic 1*150


CN-1 Sa2 ½ 300
2 Epoxy Phenolic 1*150

Zinc Rich Epoxy


M-TP-205
1 1*75
Inorganic Zinc Rich (Note-1)
D12
M-TP-210
CN-2 Sa2 ½ 275
MIO H.B Epoxy
2 1*150
M-TP-220
Polyurethane
3 1*50
M-TP-235
Inorganic Zinc Rich
1 1*75
M-TP-210
CN-3 Sa3 125
Silicon Acrylic
2 2*25
M-TP-168
Inorganic Zinc Rich
1 1*75
M-TP-210
CN-4 Sa3 125
Heat resistant
2 1*25
aluminum silicone paint
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 9 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

Total DFT
System

Surface Cleanness layer Painting System DFT (μm)


(μm)

Heat resistant
3 1*25
aluminum silicone paint
Zinc Rich Epoxy
1 1*75
M-TP-205
CN-5 Sa2 ½ 175
MIO H.B Epoxy
2 1*100
M-TP-220
Inorganic Zinc Rich
CN-6 Sa3 1 1*75 75
M-TP-210

Note-1: Just for pipes, fittings and flanges for which the first layer would be done at field shop. D12

Table 7- Detail of Internal Lining System for carbon steel and low alloy steels

Total DFT
System

Surface Cleanness layer Lining System DFT (μm)


(μm)

1 Epoxy Phenolic 1*150

I-1 Sa2 ½ 2 Epoxy Phenolic 1*150 450

3 Epoxy Phenolic 1*150

Polyamide Epoxy
1 1*125
M-TP-215
Polyamide Epoxy
I-2 Sa2 ½ 2 1*125 375
M-TP-220
Polyamide Epoxy
3 1*125
M-TP-225
Inorganic Zinc Rich
I-3 Sa3 1 1*75 75
M-TP-210
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 10 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

Total DFT
System

Surface Cleanness layer Lining System DFT (μm)


(μm)

Zinc Rich Epoxy


1 1*50
M-TP-205
I-4 Sa2 ½ 450
High build epoxy topcoat
2 2*200
M-TP-225
High build epoxy
1 1*150
I-5 M-TP-215
Sa2 ½ 300
(Note) High build epoxy topcoat
2 1*150
M-TP-225

Note: Paint manufacturer shall provide health certifications from valuable Iranian organizations such
as Research Institute of Petroleum Industries (RIPI) or Research Institute of Ministry of Power for
paints to be used as internal coating for potable water tanks.

Table 8- Detail of Painting System for stainless steels


DFT Total DFT
System

Surface Profile (μm) layer Painting System


(μm) (μm)

Epoxy primer
1 2*100
Sweep blasting with non-metallic and M-TP-215
SN-1 chloride free grit to obtain anchor 250
profile of approximately 25 to 85 μm Polyurethane topcoat
2 1*50
M-TP-235
Sweep blasting with non-metallic and Epoxy primer
SN-2 chloride free grit to obtain anchor 1 2*100 200
profile of approximately 25 to 85 μm M-TP-215

Heat resistant
1 1*25
Sweep blasting with non-metallic and aluminum silicone
SN-3 chloride free grit to obtain anchor 50
profile of approximately 25 to 85 μm Heat resistant
2 1*25
aluminum silicone
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 11 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

Table 9- Detail of Painting System for Galvanized Surfaces


Surface Total DFT
System

layer Painting System DFT (μm)


Cleanness (μm)

Wash Primer
1 1*15
M-TP-180
Polyamide Epoxy
ON-1 SSPC-SP1 2 1*50 115
M-TP-220
Polyurethane topcoat
3 1*50
M-TP-235

Table 10- Detail of Painting System for External Painting for carbon steel, low alloy steel and
stainless steel Buried Equipment
Surface Total DFT
System

layer Painting System DFT (μm)


Cleanness (μm)

1 Phenolic Epoxy 100 To 150

BE-1 Sa2 ½ 2 Phenolic Epoxy 150 400 To 450

3 Phenolic Epoxy 150


Note: Primers/paints and solvents used to stainless steel surfaces shall be chloride free.
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 12 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
The following table shall be used as split of painting works:

Table 11- split of painting works


At Construction
Item At Vendor Shop At Field
At Field
Shop
Primer &
1.Steel Structure Intermediate & ----- Touch-up
Top coat
2. Above and under Complete Paint
External ----- Touch-up
Ground Equipment/Heat System
Exchanger and Air Cooler/ Complete Paint
Heater Boxes Internal ----- -----
System
Complete Paint
External ----- -----
System
3.Tanks
Complete Paint
Internal ----- -----
System
Complete Paint
4. Furnace ------ Touch-up
System
Complete Paint
5. Ducts and Stacks- Flare and Blow downs ----- Touch-up
System
Complete Paint
6. Pumps, Compressors and Drivers ----- Touch-up
System
Pipe, Fittings, Intermediate &
--------- Up to Primer
Flange Top Coat
7. Piping
Intermediate &
Valves (Note 1) Up to Primer ------
Top Coat
Complete Paint
8. Electrical and Instrumentation ------ Touch-up
System
9. Fire Equipments/Hydrants, Fire Hose Boxes, Complete Paint
------ Touch-up
etc. System

Note 1:
If the operating temperature of valve is cleared, valves shall be painted at manufacturer`s shop
completely. With the exception this one, carbon steel valves shall be blast cleaned and primed at
Manufacturer’s shop taking into account the following criteria:
One coat of 75 μm Inorganic Zinc Rich M-TP-210.

Clause 2.3 should be replaced with the following (Page-10):

2.3 PAINT COLOR SCHEDULE


The color schedule given in following shall be used for appearance and identification of steelworks,
pipe works, equipment, instruments, tanks, machineries safety and fire equipment etc.
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 13 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
Steel Structure
(Including structures and piping supports inside equipments’ and packages’ vendor scope of work)
Main steel structures and pipe racks Brown beige RAL 1011

Piping supports up to 120 °C Light beige RAL 1001

Piping supports 120 °C and above Aluminum RAL 9006

Handrail (excluding toe plate and midrail) Black RAL 9005

Handrail (toe plate, mid-rail, upper rail and post) Orange RAL 2003

Stairway (excluding toe plate, mid-rail, upper rail


Black RAL 9005 , See Pic-1
and post)

Safety gates Orange RAL 2003

Platforms See Pic-3

Ladder and cage See Pic-2

Equipment
Vessels up to 120 °C Light ivory RAL 1015

Vessels over 120 °C Aluminum RAL 9006

Exchangers and Air cooler header boxed up to Light ivory RAL 1015
120 °C

Exchangers and Air cooler header boxed over Aluminum RAL 9006
120 °C

Tanks except water and fuel oil tanks Light ivory RAL 1015

Water tanks Aluminum RAL 9006

Fuel oil Tanks Brown Beige RAL 1011

Ducts Aluminum RAL 9006


West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 14 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC

Ejectors Same as piping

Forced draft fans Manufacturer Standard

Cooling tower fans Manufacturer Standard

Mono rail/ hoist Same as crane

Strainers Same as piping

Silencers Same as equipment

Tank mixer Manufacturer Standard

Machinery
Pumps, compressors and drives Manufacturer Standard

Electrical & Instrument Equipment


Conduit and Fittings Manufacturer Standard

Switches, starters, etc. Manufacturer Standard

Fuse boxes, electric distribution boards RAL 7032 or 7035

Motor Manufacturer Standard

Electrical Control panels RAL 7032 or 7035

Instrument panels RAL 7035

Instrument Valves Same as Piping

Note: For S.S. body Valves painting color is not required, in these cases the color code only to be
considered for actuators

Actuator for on/off valves and control valves to be segregated based on Fail position
(Open/Close or locked)
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 15 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
Brilliant Green, To BS 381C. No.221
Fail Open:

Fail Close: Red, RAL 3000

Fail Lock: Arctic Blue, To BS 381C. No.112

Piping
Piping up to 120°C Light ivory RAL 1015

Piping over 120 °C Aluminum RAL 9006

Fire water, Foam line Red RAL 3000

The following paragraph should be added in "Surface Preparation" section: (page-15)

"Surfaces to be painted, which cannot be blast cleaned due to inaccessibility or impracticality (e.g. oil
or instrument air tubing) may be cleaned either mechanically or chemically upon the approval of the
Company's representative."

The following paragraph: (page-15)

NOTE: Low grade stainless steel such as ANSI 302, 304, 304L, 321, 347, 316, 316L, 317, 317L shall
be painted. Should be replaced with: Stainless steel is not normally required to be painted but where
insulation is to be applied to stainless steel equipment, painting shall be applied based on Table 3. Zinc
containing paints are not allowed for this purpose.
Stainless steel items that are to be stored in the open air for long periods or are to be shipped as deck
Cargo, protective coating should be specified by the company.

The following paragraph should be added in "Surface Preparation" section: (page-15)

"Before painting, stainless steel surfaces shall be cleaned degreased and blast cleaned with a non-
metallic abrasive (the use of copper slag or coal slag is not allowed).

The following paragraph should be replaced with “Paint system applicable shall be in
accordance with Table 2, Paint Schedule” (Page 23).
“Paint system applicable shall be in accordance with Clause 2.2, Paint Schedule”

The following paragraph should be replaced with “Paint Color Schedule shall be in accordance
with Table 3” (Page 23).
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 16 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
“Paint Color Schedule shall be in accordance with Clause 2.3.”

Table 4 should be modified as following (Page24):


Rows 8,9 shall be deleted.
Row 19 shall be changed to “Lean Gas”
Row 20 shall be changed to “Acid Gas”
Row 25 shall be changed to “Service water (Utility, Raw, Plant, …)”

The following paragraph shall be move from clause 3.9 to clause 3.11. (Page-26):
Adherence Check:

Paint adherence shall be checked as per ASTM method D 3359. Method A (X-cut) shall be used for
paint film thicker 125 microns, Method B (lattice pattern) shall be used for paint films up to 125
microns.
Test Method A: An X-cut is made in the film to the substrate; pressure-sensitive tape is applied over
the cut and then removed. Acceptable rating is 5A (No peeling or removed) or 4A (Trace peeling or
removed along incisions).
Test Method B: A lattice pattern with either six or eleven cut in each direction(cross cut) is made in the
film to the substrate, pressure-sensitive tape is applied over the lattice and then removed, and adhesion
is evaluated by comparison with descriptions and illustration. Spacing between the cut lines shall be 1
mm for film thicknesses up to 50 microns and 2 mm for film thicknesses from 50 to 125 microns.
Acceptable results are rate 5B (The edges of the cut are completely smooth, none of the squares of the
lattice is detached) or 4B (Small flakes of the coating are detached at intersections, less than 5% of the
area is affected. If the test is unsatisfactory, the entire surface shall be blast cleaned and repainted.
Recoating after this destructive test is at the Applicator’s expense.

The following paragraph should be added in "Quality Control and Testing" section: (page-28)
"Surface preparation and/or paint application operations shall not commence until relative humidity
is less than the limits set. Moisture on the surface being prepared or painted shall be measured every
day with a surface moisture indicator before beginning surface preparation operations or applying a
coat of paint."

The following paragraph should be added in "Quality Control and Testing" section: (page-28)
Dry paint thickness shall be measured with a magnetic probe, such as Micro test or Elcometer or
equivalent. It is imperative that the magnetic probe be calibrated for each thickness of coating steel
support with a nonmagnetic block whose thickness is as close as possible to the coating being checked.
The equipment shall be calibrated at least twice a day in order to achieve the specified dry film thickness,
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 17 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
wet film thickness be checked during the coating application with wet film thickness gauges. Each coat's
thickness and total thickness shall be checked. Make five (5) separate spot measurements spaced evenly
over each section of the structure 10 square meters in area (divide the entire surface in 10 square meter
areas).
On each spot, make 3 readings by moving the probe a short distance for each new gage reading. Discard
any unusually high or low gage reading that cannot be repeated consistently. On each spot, make 3
readings by moving the probe a short distance for each new gage reading. Discard any unusually high
or low gage reading that cannot be repeated consistently.

The following paragraph should be added in "Quality Control and Testing" section: (page-28)
Porosity Check is used only for internal lining. Coating integrity shall be checked with a direct current
holiday detector. The electrode shall consist of an eighty (80) cm2 cellulose sponge soaked in a 1 %
detergent solution in potable water. The instrument shall be calibrated and checked every hour to
indicate a coating porosity of 80 000 ohms under a voltage of 67.5 volts between the ground and wet
sponge. A resistance of 90 000 ohms indicates no porosity. An alternating current holiday detector may
be used. In this case, the voltage between the painted steel surface and the test electrode shall be 5 volts
per micron of paint coat thickness. The inspector shall mark defective areas for repair. Any porous area
shall be repaired. When the number of pores is greater than 3 per square meter, the entire area shall be
blast cleaned and repainted as per this specification."

The following paragraph should be added in "Quality Control and Testing" section: (page-28)
A Roughages or Keane-Tator comparator shall be used in determining anchor pattern of blasted
surfaces, when a fixed anchor pattern rang is required by a specific painting system. Replica tape also is
a proper technique for roughness measurement.

The following paragraph should be added in "Quality Control and Testing" section: (page-28)
The air’s relative humidity shall be measured with a psychomotor. Surface preparation and/or paint
application operations shall not commence until relative humidity is less than the limits set in this
specification. Relative humidity shall be measured and recorded a minimum of six (6) times a day
whence two (2) times before commencement of work. Moisture on the surface being prepared or
painted shall be measured every day with a surface moisture indicator before beginning surface
preparation operations or applying a coat of paint.

The following paragraph should be added in "Quality Control and Testing" section: (page-28)
The adherence testing shall be done on fully cured systems only.
Pull off test shall be carried out for paint systems with dry film thickness above 400 µm. Pull off test
shall be checked as per ASTM method D4541 or ISO 4624 standards.

The following paragraph should be added in "“GUARANTEE" section: (page-29)


West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 18 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
Contractors undertaking painting and/or coating work, which is to be carried out in accordance with
this Specification, shall guarantee the quality of their coating work.
The following paragraph should be replaced with “The Painting Contractor and the paint manufacturer
shall jointly guarantee the coating systems applied for a period of two years from the date of application
“ in “GUARANTEE" section: (page-29)
“The Painting Contractor and the paint manufacturer shall jointly guarantee the coating systems applied
for a period of five years from the date of application.”
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 19 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 20 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
West Karoun Area NGL 3200 Project
Specification For Painting
PROJ. UNIT DISC. DOC. SEQ. REV. Class: 1
Page 21 of 21
NGWK 0001 ENPI SPPA 2308 D12 Status: AFC
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 1 of 29 0001
NGGG 001 ENPI SPPA B02

Painting Specification

B02 Final Issue R.Ramezani S.Omidbeiki A.Nemati 90.07.25


B01 Issued For Approve R.Ramezani S.Omidbeiki A.Nemati 90.06.27
B00 Issued For Comments R.Ramezani S.Omidbeiki A.Nemati 90.05.22

REV. STATUS PREPARED CHECKED APPROVED DATE REMARK

REVISION DESCRIPTION:
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‪ ،‬ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬
‫ﺷﻤﺎره ﻗﺮارداد ‪-88-650‬م ت ن‬
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ )‪(NGL-3200‬‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ ‫‪Painting Specification‬‬

‫‪Proj. Code‬‬ ‫‪Scope‬‬ ‫‪Disc. Code‬‬ ‫‪Doc. Type‬‬ ‫‪Seq. No‬‬ ‫‪Rev.‬‬
‫‪Page 2 of 29‬‬ ‫‪0001‬‬
‫‪NGGG‬‬ ‫‪001‬‬ ‫‪ENPI‬‬ ‫‪SPPA‬‬ ‫‪B02‬‬

‫‪REVISION INDEX‬‬
‫‪REVISION‬‬ ‫‪REVISION‬‬ ‫‪REVISION‬‬
‫‪PAGE‬‬ ‫‪PAGE‬‬ ‫‪PAGE‬‬
‫‪B00 B01 B02‬‬ ‫‪B00 B01 B02‬‬ ‫‪B00 B01 B02‬‬

‫‪1‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪40‬‬ ‫‪79‬‬


‫‪2‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪41‬‬ ‫‪80‬‬
‫‪3‬‬ ‫‪x‬‬ ‫‪42‬‬ ‫‪81‬‬
‫‪4‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪43‬‬ ‫‪82‬‬
‫‪5‬‬ ‫‪x‬‬ ‫‪44‬‬ ‫‪83‬‬
‫‪6‬‬ ‫‪x‬‬ ‫‪45‬‬ ‫‪84‬‬
‫‪7‬‬ ‫‪x‬‬ ‫‪46‬‬ ‫‪85‬‬
‫‪8‬‬ ‫‪x‬‬ ‫‪47‬‬ ‫‪86‬‬
‫‪9‬‬ ‫‪x‬‬ ‫‪48‬‬ ‫‪87‬‬
‫‪10‬‬ ‫‪x‬‬ ‫‪49‬‬ ‫‪88‬‬
‫‪11‬‬ ‫‪x‬‬ ‫‪50‬‬ ‫‪89‬‬
‫‪12‬‬ ‫‪x‬‬ ‫‪51‬‬ ‫‪90‬‬
‫‪13‬‬ ‫‪x‬‬ ‫‪52‬‬ ‫‪91‬‬
‫‪14‬‬ ‫‪x‬‬ ‫‪53‬‬ ‫‪92‬‬
‫‪15‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪54‬‬ ‫‪93‬‬
‫‪16‬‬ ‫‪x‬‬ ‫‪55‬‬ ‫‪94‬‬
‫‪17‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪56‬‬ ‫‪95‬‬
‫‪18‬‬ ‫‪x‬‬ ‫‪57‬‬ ‫‪96‬‬
‫‪19‬‬ ‫‪x‬‬ ‫‪58‬‬ ‫‪97‬‬
‫‪20‬‬ ‫‪x‬‬ ‫‪59‬‬ ‫‪98‬‬
‫‪21‬‬ ‫‪x‬‬ ‫‪60‬‬ ‫‪99‬‬
‫‪22‬‬ ‫‪x‬‬ ‫‪61‬‬ ‫‪100‬‬
‫‪23‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪62‬‬ ‫‪101‬‬
‫‪24‬‬ ‫‪x‬‬ ‫‪63‬‬ ‫‪102‬‬
‫‪25‬‬ ‫‪x‬‬ ‫‪64‬‬ ‫‪103‬‬
‫‪26‬‬ ‫‪x‬‬ ‫‪x‬‬ ‫‪65‬‬ ‫‪104‬‬
‫‪27‬‬ ‫‪x‬‬ ‫‪66‬‬ ‫‪105‬‬
‫‪28‬‬ ‫‪x‬‬ ‫‪67‬‬ ‫‪106‬‬
‫‪29‬‬ ‫‪x‬‬ ‫‪68‬‬ ‫‪107‬‬
‫‪30‬‬ ‫‪69‬‬ ‫‪108‬‬
‫‪31‬‬ ‫‪70‬‬ ‫‪Appendix‬‬
‫‪32‬‬ ‫‪71‬‬ ‫‪1‬‬
‫‪33‬‬ ‫‪72‬‬ ‫‪2‬‬
‫‪34‬‬ ‫‪73‬‬ ‫‪3‬‬
‫‪35‬‬ ‫‪74‬‬ ‫‪4‬‬
‫‪36‬‬ ‫‪75‬‬ ‫‪5‬‬
‫‪37‬‬ ‫‪76‬‬ ‫‪6‬‬
‫‪38‬‬ ‫‪77‬‬ ‫‪7‬‬
‫‪39‬‬ ‫‪78‬‬ ‫‪8‬‬
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 3 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE OF CONTENTS
1.  GENERAL ................................................................................................... 4 
1.1.  INTRODUCTION ........................................................................................................... 4 
1.2.  DEFINITION OF CONTRACTING PARTIES...........................................................4 
1.3.  SCOPE .............................................................................................................................. 5 
1.4.  REFERENCED STANDARDS ...................................................................................... 5 
1.5.  UNITS ............................................................................................................................... 6 
2.  MATERIALS ............................................................................................... 6 
2.1.  COATING MATERIALS ............................................................................................... 6 
2.2.  PAINT SCHEDULE ........................................................................................................ 6 
2.3.  PAINT COLOR SCHEDULE ......................................................................................10 
2.4.  VENDOR DATA ........................................................................................................... 14 
3.  APPLICATION ......................................................................................... 14 
3.1.  GENERAL REQUIREMENTS ................................................................................... 14 
3.2.  SURFACE PREPARATION ........................................................................................ 15 
3.3.  STORAGE AND PREPARATION OF PAINTS ....................................................... 17 
3.4.  PAINTING APPLICATION ........................................................................................19 
3.5.  PREPARATION OF SHOP PRIMED SURFACES FOR OVERCOATING .........23 
3.6.  PAINT SYSTEM ...........................................................................................................23 
3.7.  PAINT COLOR SCHEDULE ......................................................................................23 
3.8.  COLOR CODING ......................................................................................................... 24 
3.9.  SAFETY REQUIREMENTS .......................................................................................26 
3.10.  INSPECTION ................................................................................................................ 27 
3.11.  QUALITY CONTROL AND TESTING .....................................................................27 
3.12.  IDENTIFICATION ....................................................................................................... 28 
3.13.  MARKING OF PIPING MATERIAL ........................................................................ 29 
3.14.  GUARANTEE................................................................................................................ 29 
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 4 of 29 0001
NGGG 001 ENPI SPPA B02

1. GENERAL
1.1. INTRODUCTION
Petroleum Engineering & Development Company a subsidiary of Iranian oil ministry , has intended to
award the project as a EPCF contract, On behalf of the National Iranian Oil Company ( N.I.O.C )
engaged in the business of the development and production of hydrocarbons in Islamic Republic of Iran
The purpose of constructing this factory is to receive 500 million ft3 per day Sour Gas from West Karron
Oil fields (Darkhoein, Yadavaran, Jofeir, Bande Karkhe, Azadegan and North Azadegan) and processing
and production of the materials as below:
C2+
Lean gas
Sulfur
N2
CO
The above mentioned products have been intended for internal consumption as well as export
purposes.The Factory (NGL unit) will be constructed in 2 phases.

► Feed
500 million ft3 per day Sour Gas in 2 phases (250 million ft3 in each phase)
► Location
Ahvaz, at the west side of Karoon River.
► Scope of work
Preparing Basic Engineering Documents.

1.2. DEFINITION OF CONTRACTING PARTIES

Client: Petroleum Engineering & Development Company (PEDEC)

Consultant: Pars Consulting Engineers

Engineering sub Contractor: Petro Frayand Arya & Keisun Pars

Contractor: The Company which will be selected in tender to Supply E.P.C.F


services (Engineering, Procurement, Construction, Finance,
assembling, Pre-commissioning, commissioning, etc.).

Vendor: The Company which will be selected to supply the equipment and
materials and produces technical documentation mainly related to
the production of the ordered supply.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 5 of 29 0001
NGGG 001 ENPI SPPA B02

Sub-vendor: The person, firm, or corporation which supplies Vendor with


materials, machinery, tools, equipment, articles, items, or other
work services which are used by Vendor in connection with this
Purchase Order.

The word “shall” indicates a requirement.


The word “should” indicates a recommendation.

1.3. SCOPE
This Specification defines the minimum technical requirements for the design, manufacture, inspection,
testing and supply of Painting Specification for the Basic Engineering of NGL-3200 project.

1.4. REFERENCED STANDARDS


Throughout this specification, the following standards are referred to. The edition of these standards that
are in effect at the time of publication of this specification shall, to the extent specified herein, form a part
of this specification. The applicability of changes in standards and codes that occur after the date of
standard shall be mutually agreed upon by the Owner and the Vendor.

SSPC STANDARDS Surface Preparation


SIS-055900 Surface Preparation
IPS-C-TP-101 Construction Standard for Surface Preparation
IPS-C-TP-102 Construction Standard for Surface Painting
IPS-E-TP-100 Engineering Standard for Paints
IPS-M-TP-105 Material & Equipment Standard for Asphalt Mastic (cold applied)
IPS-M-TP-115 Material & Equipment Standard for Red Lead, Iron Oxide and
Alkyd Intermediate Paint
IPS-M-TP-130 Material & Equipment Standard for Colored Alkyd Paint for Top Coat
(finish) Except White
IPS-M-TP-168 Material & Equipment Standard for Acrylic Silicon Finish Paint for
Temperature Applications Up to 230°C
IPS-M-TP-175 Material & Equipment Standard for Silicone Alkyd Paint (white or
colored) as Top Coat (finish)
IPS-M-TP-190 Material & Equipment Standard for Coal Tar Epoxy Polyamide Paint
as Primer, Intermediate and Top Coat
IPS-M-TP-205 Material & Equipment Standard for Zinc-Rich Epoxy Paint (Organic
Zinc-Rich) As Primer, Intermediate and Top Coat
IPS-M-TP-210 Material & Equipment Standard for Zinc Silicate (Inorganic
Zinc Rich) Paint as Primer, Intermediate and Top Coat
IPS-M-TP-215 Material & Equipment Standard for Epoxy Polyamide Primer
IPS-M-TP-220 Material & Equipment Standard for Epoxy Polyamide Intermediate Paint
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 6 of 29 0001
NGGG 001 ENPI SPPA B02

IPS-M-TP-225 Material & Equipment Standard for Epoxy Polyamide Paint as Top Coat
IPS-M-TP-226 Material & Equipment Standard for Epoxy Polyamide Paint
IPS-M-TP-235 Material & Equipment Standard for Two Packs Aliphatic Polyurethane
Paint as Top-Coat

1.5. UNITS
This specification is based on international standard SI units except where otherwise is specified.

2. MATERIALS
2.1. COATING MATERIALS
All coating materials shall be furnished in unopened containers and shall be labeled as to identify them as
material specified for the job.

All coating material shall be boxed and vigorously stirred for a time sufficient to thoroughly mix again
the pigments and vehicles.

Thinners shall be supplied form the paint manufacturer.

If coating material requires the addition of a catalyst, the pot life under application conditions shall be
clearly stated on the label.

General description of painting materials and reference number of paints to be used for this project are
indicated in Table 1.

Before proceeding with any purchasing actions by EPC contractor, the list of painting manufacturers shall
be reviewed and confirmed by Project Owner.

2.2. PAINT SCHEDULE


Project surface preparation and paint schedules are indicated in Table 2. All temperature ranges indicated
in the tables are maximum operating of the pipe and/or equipment and not design temperatures.

Dry film thicknesses as shown in Table 2 are minimum requirement.


‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 7 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 1

PRIMERS AND COATING MATERIALS

REF. NO. GENERAL DESCRIPTION

► 105 Asphalt mastic (cold applied) ace. to IPS-M-TP-105

► 115 Red lead iron oxide raw linseed oil and alkyd primer ace. to IPS-M-TP-115

► 130 Colored alkyd paint (except white) ace. to IPS-M-TP-130

► 168 Acrylic silicon finish paint for temperature applications up to 230°C ace. to
IPS-M-TP-168

► 175 Silicon alkyd paint ace. to IPS-M-TP-175

► 190 Epoxy polyamide paint ace. to IPS-M-TP-190

► 205 Zinc-rich epoxy paint (organic zinc-rich) ace. to IPS-M-TP-205

► 210 Zinc silicate (inorganic zinc rich) paint ace. to IPS-M-TP-210

► 215 Epoxy polyamide primer ace. to IPS-M-TP-215

► 220 Epoxy polyamide intermediate paint ace. to IPS-M-TP-220

► 225 Epoxy polyamide paint as top coat ace. to IPS-M-TP-225

► 226 Epoxy polyamide ace. to IPS-M-TP-226

► 235 Two pack aliphatic polyurethane paint ace. to IPS-M-TP-235

► Silicone Aluminum intermediate and top coat


‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 8 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 2
SURFACE PREPARATION AND PAINT SCHEDULE

PRIMER TIE-COAT TOP-COAT


SURFACE TEMP
SERVICE REF REF REF REMARKS
PREPARATION RANGE DFT DFT DFT
NO. NO. NO.
1- STRUCTURAL STEEL
SHOP FABRICATED/SITE
FABRICATION AND
TOUCH UP OF SHOP
FABRICATED
1-1 STRUCTURAL STEEL SHOT BLAST TO
UPTO 75 150 100
WORK. NEAR WHITE 210 220 235
120OC MIC MIC MIC
NON FIREPROOFED METAL SA 21/2
SHOT BLAST TO
1-2 STRUCTURAL STEEL UPTO 100 100
NEAR WHITE 215 - - 235
WORK.FIREPROOFED 120OC MIC MIC
METAL SA 21/2

2-PIPING

2-1 PIPING SHOP SHOT BLAST TO


UPTO 70 100 100
FABRICATED/SITE NEAR WHITE 215 220 235 NOTE 1
120OC MIC MIC MIC
FABRICATION METAL SA 21/2
SHOT BLAST TO 121OC
AND TOUCH UP OF 70 25 25
NEAR WHITE TO 210 168 168 NOTE 2
SHOP FABRICATED MIC MIC MIC
METAL SA 21/2 200 C O

SHOT BLAST TO 201OC


70 SILICONE 30 SILICONE 25
NEAR WHITE TO 210 NOTE 2
MIC ALUM. MIC ALUM. MIC
METAL SA 21/2 300 O
C
ORIGINAL
3-VESSELS, TOWERS, PAINTING BY
HEAT EXCHANGERS MFR.,TOUCH
AND AIR COOLER UP BY
HEADERS CONTRACTOR
NOTE5
SHOT BLAST TO
3-1 EXTERNAL UPTO 70 100 100
NEAR WHITE 215 220 235 NOTE 1
SURFACES 120OC MIC MIC MIC
METAL SA 21/2
SHOT BLAST TO 121OC
70 25 25
NEAR WHITE TO 210 168 168 NOTE 2
MIC MIC MIC
METAL SA 21/2 200OC
SHOT BLAST TO 201OC
70 SILICONE 30 SILICONE 30
NEAR WHITE TO 210 NOTE 2
MIC ALUM. MIC ALUM. MIC
METAL SA 21/2 300 O
C
SHOT BLAST TO
3-2 VESSELS INTERNAL UPTO 150
WHITE 210 - - - - NOTE 7
SURFACES 400OC MIC
METAL SA 3
SHOT BLAST TO
3-3 HEAT EXCHANGERS UPTO 150 150 150
NEAR WHITE 190 190 190 NOTE 3
INTERNAL 120OC MIC MIC MIC
METAL SA 21/2
4- FIRED HEATERS, SHOT BLAST TO
UPTO 70 25 25
STACKS, DUCTS, FLARE, NEAR WHITE 210 168 168
200OC MIC MIC MIC
EXTERNAL SURFACES METAL SA 21/2
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 9 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 2
SURFACE PREPARATION AND PAINT SCHEDULE

PRIMER TIE-COAT TOP-COAT


SURFACE TEMP
SERVICE REF REF REF REMARKS
PREPARATION RANGE DFT DFT DFT
NO. NO. NO.

5- TANKAGE

5-1 EXTERNAL SHOT BLAST TO 100


UPTO 70 150
SURFACES, SHELL AND NEAR WHITE 215 220 235 MIC(TWO NOTE 1
90OC MIC MIC
FIXED ROOF PLATES FINISH SA 21/2 COATS)
5-2 STARWAYS,
STATRTHREAD, SHOT BLAST TO HOT DIP
UPTO 150
GANGWAYS, STAYING WHITE 210 - - - - GALVANIED
90OC MIC
AND OTHER EXTERNAL METAL SA 3 PREFERRED
PARTS
5-3 INTERIOR
SURFACES, (BOTTOM
PLATE SHELL, ROOF SHOT BLAST TO
UPTO 150 150
PLATE & STRUCTURE) NEAR WHITE 190 190 190 150 MIC
90OC MIC MIC
FOR ALL TANKS FINISH SA 21/2
EXCEPT AS SPECIFIED
BELOW
5-4 INTERIOR SHOT BLAST TO
UPTO 75 80
SURFACES, FRESH NEAR WHITE 205 220 225 125 MIC
90OC MIC MIC
WATER FINISH SA 21/2
5-5 INTERIOR SHOT BLAST TO
UPTO 75 80
SURFACES, POTABLE NEAR WHITE 205 220 225 125 MIC NOTE 6
90OC MIC MIC
WATER FINISH SA 21/2
5-6 INTERIOR
SURFACES, LUBE OIL
SHOT BLAST TO
BOTTOM PLATE & UPTO 70 100
NEAR WHITE 215 220 225 70 MIC NOTE 4
LOWER HALF OF 90OC MIC MIC
FINISH SA 21/2
BOTTOM SHELL
COURSE
5-7 INTERIOR SHOT BLAST TO
UPTO 70 40
SURFACES, ROOF WHITE 115 130 130 40 MIC
90OC MIC MIC
PLATES & STRUCTURE FINISH SA 3
6- MISCELLANEOUS
MECHANICAL &
ELECTRICAL
EQUIPMENT, FIRE
TO MANUFACTURER ‘S STANDARD NOTE 5
FIGHTING & FIRST AID
EQUIPMENT,
MACHINERY, SWITCH
TRANSFORMERS, ETC.
7- INSTRUMENTS,
INSTRUMENT PANELS,
TO MANUFACTURER STANDARD, BUT WITH SPECIFED COLOR IF APPLICABLE NOTE 5
CONSOLES AND
CABINETS
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 10 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 2
SURFACE PREPARATION AND PAINT SCHEDULE

PRIMER TIE-COAT TOP-COAT


SURFACE TEMP
SERVICE REF REF REF REMARKS
PREPARATION RANGE DFT DFT DFT
NO. NO. NO.

8- OIL AND GAS


PIPELINES
8-1 ABOVE GROUND
PIPING, FLANGES,
SHOT BLAST TO
VALVES, FITTING, MITER UPTO 70 150 100
NEAR WHITE 215 220 235
BENDS, PIPE SUPPORTS, 90OC MIC MIC MIC
FINISH SA 21/2
VESSELS AND
FABRICATION
8-2 UNBURIED
UNDERGROUND
STRUCTURES (SUCH AS SHOT BLAST TO
UPTO 800 800 800
VALVES IN VALVE NEAR WHITE 105 105 105
90OC MIC MIC MIC
BOXES IN FINISH SA 21/2
UNDERGROUND GAS
PIPELINE)

NOTES:

1- For insulated surfaces, only coats of primer and tie-coat are required.

2- For insulated surfaces in temperatures above 120°C, several coats of sprayed Aluminum shall be
applied to provide total 175 microns DFT.

3- Only channels and floating heads.

4- Upper half of bottom course & rest of the shell to be shop primed only.

5- For equipment subject to paint damage during transportation, installation, etc., the equipment
manufacturer shall quote the painting system used (painting layers and paint manufacturers) for
future use of touch-up painting.

6- Paint manufacturer shall provide health certifications from valuable Iranian organizations such as
Research Institute of Petroleum Industries (RIPI) or Research Institute of Ministry of Power for
paints to be used as internal coating for potable water tanks.

7- Suitability of selected paint system to be checked for applicable internal services in detail engineering.

2.3. PAINT COLOR SCHEDULE


The color schedule given in Table 3 shall be used for appearance and identification of steelworks, pipe
works, equipments, instruments, tanks, machineries safety and fire equipments etc.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 11 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 3 - PAINT COLOUR SCHEDULE


FOR STRUCTURES, PIPE WORKS, TANKS AND SAEETY
AND FIRE EQUIPMENT ETC.

ITEM
COLOUR
1. FLOW DIRECTION. STEEL WORK
GREEN
a) MAIN STEEL STRUCTURAL LIGHT ORANGE, TOBS 381C.
b) STAIRWAYS, PLATFORMS, No. 557
HAND RAILS, LADDERS

2. PIPEWORK

2.1 INSIDE PLANT BOUNDARIES


a) PRODUCT LINES WHITE
b) STEAM LINES ALUMINUM
c) WATER LINES ALUMINUM
d) FIRE MAINS SIGNAL RED, TO BS 381C. No.
537
e) FOAM LINES SIGNAL RED, TO BS 381C. No.
537
f) DANGEROUS, POISONOUS CANARY YELLOW, TO BS
CHEMICALS AND GASES 381C. No. 309
g) NATURAL GAS LINES CANARY YELLOW, TO BS
381C. No. 309
h) SOUR GAS LINES DARK YELLOW MIDDLE
i) GLYCOL LINES BLACK
j) CRUDE OIL LINES MIDDLE BROWN, TO BS 381C.
NO. 411
k) VALVES, FLANGE TO FLANGE WHITE AND CANARY
YELLOW, TO BS
ON GAS-LINES 381C No. 309 BANDS
l) AIR SUPPLIES ARCTIC BLUE, TO BS 381C. No.
112
m) ALL VALVES: CANARY YELLOW, TO BS
SMALLER THAN 7 cm (3") 381C. No. 309
LARGER THAN 7 cm (3") CANARY YELLOW BANDS
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 12 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 3 - PAINT COLOUR SCHEDULE


FOR STRUCTURES, PIPEWORKS, TANKS
AND SAFETY AND FIRE EQUIPMENT ETC.

ITEM COLOUR
TO BE WRITTEN IN BLACK ON
n) LINE CONTENTS: ALUMINUM BACKGROUND WITH
ARROW FOR FLOW DIRECTION.
o) IDENTIFICATION: TO BE BANDS 10cm. (4") WIDE AT
VALVES AND FLANGES ON
ALUMINUM BACKGROUND

2.2 PIPES,COLUMNS, SUPPORTS IN WALK DIAGONAL WHITE AND CANARY


WAYS YELLOW (BS 381C. No. 309) BANDS
OF 15cm

3. SAFETY COLOUR SCHEME

a) FIRE FIGHTING EQUIPMENT SIGNAL RED, TO BS 381C. No. 537


INCLUDING FIRE PUMPS, HOSE-
STATIONS, FIRE MONITORS,
SUPPORTING TOWERS AND FIRE
HYDRANTS C02 BOTTLES
IN SUBSTATIONS.
b) SAFETY SHOWERS AND OTHER SAFETY BRILLIANT GREEN, TO BS 381C. No.
INSTALLATIONS. 221
c) DANGEROUS OBSTRUCTIONS ALTERNATIVE BANDS OF BLACK
AND CANARY YELLOW
d) RELIEF AND SAFETY VALVES CANARY YELLOW, TO BS 381C. No.
309
e) DANGEROUS OR EXPOSED PART OF CANARY YELLOW, TO BS 381C. No.
MACHINERY 309
f) DANGER POINTS OF ELECTRICAL ARCTIC BLUE, TO BS 381C. No. 112
INSTALLATION
g) FIRST AID EQUIPMENT WHITE LETTERING BRILLIANT
GREEN, TO BS 381C. No. 221
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 13 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 3 - PAINT COLOUR SCHEDULE


FOR STRUCTURES, PIPEWORKS, TANKS AND SAEFTY
AND FIRE EQUIPMENT ETC.
ITEM COLOUR

h) BREATHING APPARATUS MASKS BRILLIANT GREEN, TO BS 381C. NO. 221


AND OTHER SAFETY EQUIPMENT

i) FIRE ESCAPES AND LADDERS INCL.


SAFETY LOOPS SIGNAL RED, TO BS 381C. No. 537

4. NOTICES ON SIGNBOARDS

a) PLANTS USING CAUSTIC SODA OR BLACK LETTERS ON YELLOW


ACIDS BACKGROUND

b) PLANTS WITH HIGH RED LETTERS ON YELLOW


CONCENTRATION OF HYDROGEN BACKGROUND
SULPHIDE

5. STENCILING

a) CONTRACTORS SHALL PUT STENCIL


MARKING ON TANKS, VESSELS,
EQUIPMENT NUMBERS IN
ENGLISH/FARSI

b) STORAGE TANKS SHALL HAVE


DIGITS STENCILED IN BLACK
MINIMUM OF 1.5 m.
HIGH AT LEAST ON TWO SIDES
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 14 of 29 0001
NGGG 001 ENPI SPPA B02

2.4. VENDOR DATA


Vendor shall provide 6 sets of coating and paint materials method of preparation, mixing and application
procedures and data in the following manner:

► Two sets with proposal

► Four sets with each consignment

In case some coating and paint materials require special chemicals and/or thinners, sufficient amount shall
be provided with each consignment bearing in mind item 8.1 above. The required amount of such
chemicals, additives, agents or thinners shall be clearly stated in vendor's proposal.

Each coating and paint material container, in addition to paint manufacturer's standard commercial
information, shall bear the Owner's reference number as stated in this specification, date of manufacture,
shelf life and pot life.

All paints, primers and solvents (when recommended by paint vendor) shall be supplied in 20 lit.
Containers unless manufacturer recommends otherwise.

3. APPLICATION
3.1. GENERAL REQUIREMENTS
All work carried out by the Painting Contractor shall be subject to the approval of Owner's representative.
The inspector shall have the right to reject any of the performed work which in his opinion does not
conform to this specification.

The Painting Contractor's responsibilities shall include but not be limited to furnishing of all manpower,
tools, materials, consumables, transportation, inspection requirements, etc. required for surface
preparation and painting.

Whilst the content of this specification defines the essential requirements of surface preparation and
painting, they do not relieve the Painting Contractor from his responsibility to carry out the work in
accordance with the appropriate codes standards listed in section 2.0.

The paint manufacturer's instruction shall be followed at all times. Particular attention shall be paid to the
following:

► Proper storage to avoid exposure, as well as extremes of temperature

► Surface preparation prior to painting

► Mixing & thinning

► Application of paints and recommended limit on time intervals between coats.


‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 15 of 29 0001
NGGG 001 ENPI SPPA B02

► Pot-life of two-pack materials.

► The minimum time before over coating

► The maximum time, if any, to over coating for proper adhesion between coats.

The following materials do not require shop or field painting:

► High grade Stainless steel, nickel, aluminum and other metals not subject to corrosion, concrete
and masonry surfaces.

NOTE: Low grade stainless steel such as ANSI 302, 304, 304L, 321, 347, 316, 316L, 317, 317L shall be
painted.

For Galvanized, cadmium plated or bichromated surfaces:

► These surfaces shall be brushed then degreased with a suitable solvent and primed with a suitable
phosphating primer before painting or blast swept and cleaned from dust prior to painting.

Precautions shall be taken to prevent paint from being applied to nameplates, couplings, shafts, valve
stems, bearings, control valves, instrument glasses, moving parts and other machined surfaces.

Machined surfaces and thread surfaces shall be protected with temporary rust preventive paint.

It is intended that to the extent possible, surface preparation and coating to be performed in the Painting
Contractor's yard to minimize site work.

All equipment supplied by Owner such as vessels, coolers, machinery and their associated panels shall be
painted in fabricators shop by the equipment suppliers. The Painting Contractor shall perform touch up
painting and repaint those areas of equipment where the coating has been damaged during shipment and
transit.

All prefabricated piping systems and steel structures shall be (primed) in the Painting Contractor's shop
prior to installation at the site.

The Painting Contractor shall investigate the painting of the overall system after erection and tests. The
touch up painting of the damaged areas with primer coat and application of the intermediate and top coats
shall be carried out after tests.

Bolting:

► Carbon steel bolting and law grade stainless steel bolting shall be painted after tightening.
On stainless steel surface only zinc free paints shall be used. The bolting shall be de-greased and
have its surface prepared before paint application.

3.2. SURFACE PREPARATION


Surfaces to be painted shall be cleaned and prepared before any paint is applied.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 16 of 29 0001
NGGG 001 ENPI SPPA B02

All oil and grease, dirt, welding slag and fume deposit, rust and loose mill scale, prevent good adhesion
and should be removed. Weld edges shall be free from weld spatter. Welds and edges shall be ground
smooth and corners rounded and the weld areas shall be cleaned of salt deposits, etc.

Particular care should be taken to prevent rusting and/or contamination of cleaned or primed surfaces.

Blast cleaning shall not be carried out on wet surfaces or surfaces which will be wet after blasting; nor
shall blast cleaning be carried out when surface temperature is less than 3°C above ambient dew point, or
when the relative humidity is greater than 80% or beyond daylight hours on exterior location.

Prepared surfaces should be primed generally within four hours or before visible re-rusting occurs.

Cleaned surfaces shall never be left overnight prior to coating, in such case reblasting or recleaning is
necessary.

No acid washes or other cleaning solutions or solvents shall be used on metal surfaces that have been
blasted. This includes inhibitive washes intended to prevent rusting.

Chipping, scraping and Steel wire brushing using manual or power driven tools can not remove firmly
adherent mill scale and shall only be used where blast cleaning is impractical, with the approval of client
and in accordance with the grade ST2 or ST3 as will be specified.

Surface irregularities including weld spatter, rough capping, undercut and slag together with sharp or
rough edges and burrs, surface laminations and laps shall be removed or made smooth prior to
commencement of surface preparation. Such irregularities which become apparent after surface
preparation by blast cleaning or hot acid pickling shall be similarly treated.

Blasting operations shall never be allowed in the vicinity of painting work or near to a wet paint surface.

Metallic abrasives such as cast steel or chilled iron shot or grit shall be used as abrasives for blast
cleaning of steel surfaces. Size and hardness of shot and grit abrasives shall be according to the
requirements of Table Bl of IPS-C-TP-101. In general, the acceptable sizes of abrasives shall be within
the range of 0.500 to 1.40 millimeter. Non-metallic abrasives such as silica sands shall not be used for
blast cleaning.

All abrasives shall be free of dust, dirt and other foreign matter and shall be kept dry at all the times.

Residual shot, grit and dust shall be completely removed after blasting preferably by vacuum cleaning,
but otherwise by air blast or fibber brush.

The compressed air supply used for blasting shall be free of water and oil. Adequate separators and traps
shall be provided and these shall be kept emptied of water and oil. Accumulations of water and oil shall
be removed from the air receiver by regular purging.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 17 of 29 0001
NGGG 001 ENPI SPPA B02

This clause shall also apply to air used for the dusting of cleaned surfaces. The pressure and the volume
of compressed air supply for blast cleaning shall meet the work requirement.

The cleaning method to be used shall be as per Table 2.

The surface preparation specified shall be in accordance with Swedish standards SIS 055900 or B.S or
SSPC standards. The level of cleanliness in different standards is as indicated here below:

TYPE OF SURFACE

PREPARATION SIS 055900 SSPC BS

HAND TOOL CLEANING ST 2 SP-2 _

POWER TOOL CLEANING ST 3 SP-3 _

WHITE METAL BLAST CLEANING SA3 SP-5 FIRST QUALITY

NEAR WHITE BLAST CLEANING SA 21/2 SP-10 SECOND QUALITY

COMMERCIAL BLAST CLEANING SA2 SP-6 THIRD QUALITY

Shop primed and other previously painted surfaces scheduled for painting shall be examined for bare and
marred spots. All such areas shall be adequately prepared, cleaned and touched-up with matching type
priming materials before application of other paint.

Blast cleaned surfaces may be protected for short periods by a thin coat of pre-treatment or pre-
fabrication primer. It is imperative that such gap primers should be applied as a continuous coating in an
even manner to achieve a minimum film thickness of 20 microns. Such primers do not replace the full
thickness of permanent primer.

► Required Roughness:

All surfaces shall be blast cleaned to obtain a total angular roughness Rt included:
Between 30 and 50 microns when total thickness of the coat of painting applied is less than 400
microns,
Between 50 and 80 microns when total thickness of the coat of painting applied is greater than 400
microns,
Only dry blasting techniques are allowed. Compressed air for abrasive blasting shall not contain
any trace of oil or water. Blasting nozzle pressure shall not be less than 6.2 bar g (90 psi g). The use
of SPONGEJET process with the proper equipment is approved.

3.3. STORAGE AND PREPARATION OF PAINTS


Paints shall be stored in a well ventilated store room, away from sunshine or excessive heat. The paints
shall be maintained at a temperature between 4°C and 27°C. However, the manufacturer's instructions for
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 18 of 29 0001
NGGG 001 ENPI SPPA B02

storage temperature shall also be considered. Open air storage shall be avoided particularly for primers
and undercoats.

The maximum storage time for paints shall be in accordance with the manufacturer's instructions.

Paint drums/cans shall not be opened unless required for use. The label information shall be legible in
accordance with code and shall be checked at the time of use.

The drums of heavy paints which settle during storage period (such as red lead oxide primer and etc.)
shall be rolled every six weeks. Turning the drums on their ends is not allowed.

Paints shall not be used if it has gelled, or if it has thickened to such an extent that more than 5% by
volume (10% by volume for priming paints) of the correct thinners is required to bring it to brushing
consistency.

Where a skin has formed in the container, the skin shall be cut loose from the sides of the container,
removed and discarded. If the volume of such skins is more than 2% of the remaining paint, the paint
shall not be used

Mixing

► Mixing shall be carried out by powered mixers and/or shakers. Only small quantities shall be mixed
by hand mixing.
Mixing directions as furnished by the manufacturer shall be followed.
Mechanical agitation during application shall be sufficient to keep pigment in solution.

► Mixing in open containers shall be done in a well ventilated area away from sparks or flames.

► Paints mixed in original container shall not be transferred until all settled pigment is incorporated
in the vehicle.

► Paints shall not be mixed or kept in suspension by using a bubbling air stream.

► Paint shall not remain in spray pots or buckets overnight but shall be gathered in a closed container
and remixed before use.

► When mixing two-component paints, check and remix each component individually. Then blend
the two components at low speed until the mixture is completely uniform in color. Often, the two
components are supplied in different colors so that a good mix can be achieved. Do not mix more
than a few liters at a time since the exothermic caused by the mixture may be so high as to make
the paint solidify in the container.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 19 of 29 0001
NGGG 001 ENPI SPPA B02

► Hand mixing of paints is allowed for only containers up to 5 liters. All large containers shall be
rolled on its side before opening, then mixed by mechanical agitators and brought to a uniform
consistency. Where pigment separation readily occurs such as heavy or metallic pigments,
prevention shall be made for continuous mixing during application.

Thinning

► Paint shall be thinned in accordance with the manufacturer's instructions. Only thinners of the type
recommended by the paint manufacturer shall be used.

3.4. PAINTING APPLICATION

All painting shall be carried out in conformity with this specification and with the paint manufacturer's
recommendation.

The accepted methods of applying coating on site are by brush and spray. Choice of method is usually
determined by the nature of the work or the type of material to be applied.

Painting Contractor shall be responsible for ensuring that he is in possession of the latest available issue
of the paint data sheets and product safety data sheets printed by the paint manufacturer of the particular
batch of paint to be applied. Such data shall include specific recommendations and instructions
concerning shelf life, pot life thinners, directions for thinning and mixing, drying time, curing time,
recommended spray equipment, safety equipment, cleanings solvent and any other provisions for
application of both prime and finish coats. Product safety data sheets shall include information concerning
general composition, physical data, hazards and precautions during and after application, toxicity/first aid,
storage, spillage and waste disposal.

These recommendations shall be considered an inherent part of this standard and followed accordingly.

Painting Contractor shall avoid contamination of any adjacent items of plant and equipment by paint
overspray, drips or spillage, providing appropriate protection where necessary. Stainless Steel and high
Nickel-Chromium alloy surface shall be protected against overspray or paint drips, particularly those
containing metallic pigments. If any such contamination does occur, the paint shall be immediately and
thoroughly removed by Painting Contractor.

Painting shall not take place under adverse weather conditions, in particular rain, fog, snow or when such
conditions are likely to occur before the paint has become dry. Panting shall not take place in the
following conditions:

► At temperatures below 5°C.


‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 20 of 29 0001
NGGG 001 ENPI SPPA B02

► When the relative humidity is greater than 85%.

► When the metal surface temperature is less than 3°C above the ambient dew point.

► Outside daylight hours on exterior locations.

► In the case of exterior locations, painting may also be suspended due to wind speed at the discretion
of Owner. In cases where moisture tolerant coatings are used, painting may proceed on damp
surfaces within the limits recommended by the manufacturer of the particular coating being
applied.

The method of application shall be selected to ensure that the paint is applied in a uniform manner to the
prescribed film thickness without any runs, sags or other blemishes. The pressure and volume of the
compressed air used for spray application shall meet the work requirement and be free from oil and water
contamination. Traps, separators and filters shall be emptied and cleaned regularly. Application of
primers on wire brushed surfaces shall be by brush.

Brush application of paint shall be in accordance with the following:

► Brushes shall be of a style and quality that will permit proper application of paint. Round or oval
brushes generally are considered most suitable for rivets, bolts, irregular surfaces and rough or
pitted steel. Wide flat brushes are suitable for large flat areas, but they should not have a width of
over 125mm.

► The brush shall not be dipped more than one-third of bristle length into the paint to avoid
overloading the bristles and filling the "heel" with paint. The brush shall be held at an angle of
about 45° to the work.

► The brushing shall be done so that a smooth coat, as mealy uniform in thickness as possible is
obtained. There should not be deep or detrimental brush marks.

► Excessive pressure shall not be applied to the brush. When the surface has been completely covered
with paint, the wet area shall be brushed cross-wise to ensure uniformity, and finally brushed
lightly to smooth out brush marks and laps. On large areas this final light brushing shall be in
vertical direction.

Air spray application shall be in accordance with the following:

► The equipment used shall be suitable for the intended purpose, shall be capable of properly
atomizing the paint to be applied and shall be equipped with suitable pressure regulators and
gauges. The air caps, nozzles and needles shall be those recommended by the manufacturer of the
equipment for the material being sprayed. The application equipment shall be kept in satisfactory
and perfectly clean condition to permit proper paint application.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 21 of 29 0001
NGGG 001 ENPI SPPA B02

► Moisture traps or separators shall be provided to remove oil and condensed water from the air.
These traps or separators shall be of adequate size and shall be drained periodically during
operations. The air from the spray gun impinging against the surface shall show no condensed
water or oil.

► The pressure on the material in the pot and of the air at the gun shall be adjusted for optimum
spraying effectiveness. The atomizing air pressure on the gun shall be high enough to atomize the
paint but not so high as to cause excessive fogging of paint, excessive evaporation of solvent, or
loss by overspray.

► Sprayed coating shall be cross-spray-applied to ensure uniform coverage free of runs and sags.

► The spray gun shall be held at right angles to work and make even passes. The passes shall be
overlapped by 50% on the previous one. The trigger of the gun should be released at the end of
each stroke.

► At the end of each day or upon completion of the job, the gun shall be cleaned thoroughly by
spraying the thinner through the gun and forcing it into container by holding the cloth over the air
cap. The air cap shall be removed and the fluid tip washed with thinner. The cap shall be immersed
in thinner and the holes cleaned with a matchstick but not with nail or wire. The spray gun shall
never be immersed in the thinner. The gun shall be lubricated at regular intervals.

Airless spray application shall be in accordance with the following:

► Since very high pressure is involved in this method, caution shall be exercised in the handling of
airless spray equipment; in particular, the spray gun shall never be pointed towards any part of
body whilst the equipment is in operation.

► Fluid tips shall be of proper orifice size and fan angle, and the fluid control gun of proper
construction, as recommended by the manufacturer of the material being sprayed and the
equipment being used. Fluid tips shall be of the safety type with shields to prevent penetration of
the skins by the high pressure stream of paint.

► For good results the gun shall be held at right angle to the work and about 300mm away and the
operator should start at the bottom and work upwards. The speed of the operating strokes should be
much faster than for normal spraying.

Successive passes of the gun shall overlap only slightly since the spray pattern is of uniform
thickness throughout its width. Paint must never be allowed to dry in the gun. Cleaning instructions
must be strictly followed.

► Airless paint spray equipment shall always be provided with an electric ground wire in the high
pressure line between the gun and the pumping equipment.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 22 of 29 0001
NGGG 001 ENPI SPPA B02

Further, the pumping equipment shall be suitably grounded to avoid the build-up of any
electrostatic charge on the gun. The manufacturer's instructions shall be followed properly in this
respect.

► Inorganic zinc rich paints shall be applied by airless spray method.

To ensure that the minimum thickness is achieved on all angles, corners, bulkheads, welds, etc., such
edges shall be stripe painted separately before applying the main system. Holding primers shall only be
permitted where they are obtained from the same manufacturing source as the main priming coats, and
where the manufacturer is able to provide a full guarantee that satisfactory intercoat adhesion will occur.

No coating shall be put on edges prepared for field welds or within six inches of these edges.

Where further painting is to be carried out, Zinc Silicate primers shall be sealed with a tie coat as soon as
practical after complete curing has taken place, to avoid salt or chemical contamination and to seal the
porous nature of the primer. The tie coat shall be selected to ensure sound adhesion to the Zinc Silicate
primer and be compatible with the finishing coat process.

Overspray and dry spray of inorganic Zinc Silicate primers shall be removed prior to application of
subsequent tie coats or top coats.

In all instances where two or more coats of the same paint are specified, such coatings shall be of
contrasting colors so that each stage of the work can be readily identified and film thickness determined
accordingly.

Intervals between coats shall comply with manufacturer's recommendations and should generally be kept
to the absolute minimum in order to prevent contamination between coats. Where contamination occurs
between coats, this shall be completely removed, generally by washing with a suitable detergent solution
and rinsing with clean fresh water.

All points of damage to paintwork incurred at any stage of the work, including shop welding operations,
shall be re-prepared by blast cleaning to the original standard and recoating with the specified priming
coat to restore the film thickness. In all such instances preparation shall extend 25 mm into the sound
paintwork and a further 25mm of sound paintwork shall be lightly blasted to etch the surface. Repainting
shall then cover the prepared surface and the etched paintwork. Where blast cleaning cannot be carried
out, surface preparation of points of damage by scraping and power wire brushing is acceptable provided
specific approval is given by Owner. In such instances, modification of the originally specified primer
may be necessary to suit the changed method of surface protection.

Preparation of weld margins shall be preceded by the removal of masking tape where fitted and shall
involve the removal of all flux, welding spatter and other foreign matter. Where blast cleaning is used,
this may be by means of portable vacuum blast apparatus. Where power wire brushing is used, excessive
cleaning to the extent this is liable to produce a polished surface shall be avoided.

Where touching up prior to top coating of Zinc based primers involved, this shall be preceded by
thorough cleaning with solvent or an emulsion type cleaner to remove all oil and grease. This shall be
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 23 of 29 0001
NGGG 001 ENPI SPPA B02

followed by thoroughly hosing down with clean potable water which in the case of surfaces that have not
been tie coated shall be carried out in conjunction with manual scrubbing with stiff brushes in order to
remove all surface dirt and other contaminants, Zinc corrosion products (white rust), etc.

After the preparation as described in specification, the surfaces shall be allowed to thoroughly dry out and
shall be subjected to a thorough inspection to establish effectiveness of the cleaning operations.

► Drying Painted Surfaces:

An additional coat of paint shall not be applied until the previous coat is dry.

Read Manufacturer‘s instructions for drying times with respect to ambient temperature and humidity.

Paint shall not be dried under conditions that may cause wrinkling, blistering, pore formation or other
injurious defects.

No drier shall be added to paint.

Paint shall be protected from rain, condensation, snow or freezing until it is completely dry( refer to
Manufacturer’s technical data sheet).

3.5. PREPARATION OF SHOP PRIMED SURFACES FOR OVERCOATING


Any primed surface which has been exposed for more than a few days will have become contaminated
and should be cleaned down with fresh water and allowed to dry before over coating.

Primed and painted surfaces which have been exposed to marine conditions, including shipment overseas,
will be contaminated with salt and should be lightly wire brushed, then washed with fresh water, before
over coating.

Although Zinc rich primers are very effective in preventing rusting, extended exposure develops a surface
contaminated of Zinc corrosion products which can impair the adhesion of subsequent coats. Zinc rich
primers, both organic and inorganic which have been exposed long enough to develop white surface
staining, should be prepared for over coating by one of the following methods:

► Light blast cleaning and dust removal.

► Wire brushing, followed by water washing.

► Scrubbing with fresh water, using bristle brushes.

3.6. PAINT SYSTEM


Paint system applicable shall be in accordance with Table 2, Paint Schedule.

3.7. PAINT COLOR SCHEDULE


Paint Color Schedule shall be in accordance with Table 3.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 24 of 29 0001
NGGG 001 ENPI SPPA B02

3.8. COLOR CODING


The color coding given in Table 4 shall be used for identification of piping services.

TABLE 4 - COLOR CODING


CODE
BASE COLOR
ITEM FLUID COLOR
BAND
BAND
1 Boiler Feed Water Green Grey

2 Blow Down Silver Grey Orange

3 Chemical Additives Violet Blue

4 Chemical Drain Brown Yellow

5 Closed Drain Header Green Blue

6 Condensate Return Silvery Grey Blue

7 Cooling Water Green Silver Gray

8 Sweet Crude Oil Orange Black

9 Sour Crude Oil Orange Green

10 Potable Water Green White

11 Waste Water Green Violet

12 Dematerialize Water Green Red

13 Fuel Gas Yellow Gray

14 Gas Oil Black Yellow

15 Hydrocarbon Yellow Green

16 Instrument Air Light Blue White

17 Lubrication Oil Black White

18 MP Condensate Green Brown

19 Sweet Gas Yellow Brown

20 Sour Gas Yellow Orange


Yellow
21 Nitrogen White
Yellow
22 Flare Gas Blue

23 Oily Water Sewer Black Blue


‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 25 of 29 0001
NGGG 001 ENPI SPPA B02

TABLE 4- COLOR CODING


ITEM FLUID BASE COLOR BAND CODE COLOR BAND

24 Plant Air Light Blue Orange

25 Service Water Green

26 Steam Silver Grey -

27 Steam Tracing Silver Grey Yellow

28 Vent Gas Brown Black

Notes:

► Painted bands shall be compatible with the underlying paint system or insulation jacketing and
shall be provided at the following significant points of plant:

 Commencement and termination of pipe run


 Branches
 Local to valve
 1,5 m away from connection to equipment

► The width of the basic color band shall be 2 x 120 mm.

► The code color band shall be positioned in the centre of the basic color and shall be of the
following widths:

 Pipes up to NPS 8" : 50 mm wide


 Pipes NPS 10" and above : 100 mm wide
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 26 of 29 0001
NGGG 001 ENPI SPPA B02

3.9. SAFETY REQUIREMENTS

The Painting Contractor shall adhere strictly to the safety requirements stated in the following paragraphs
and shall also comply with any additional safety requirements furnished by the Owner Representative.

Scaffolding shall be completely rigid and stable. High scaffolding shall be tied to the structure being
painted. Scaffolding shall be so placed that it will not interfere with the work of other crafts or the
operation of the operating systems. The scaffolding shall be such that workers will be able to stand up
with body and arms free of scaffolding or staging and structure being worked on.

Containers used on scaffolds shall be securely fastened to prevent them from being knocked off.

Where there is possibility of flammable gas in the atmosphere, all tools such as brushes, scrapers and
chisels used to clean steel surfaces shall be of the non-sparking type.

All oil or paint-soaked rags shall be stored in closed containers. Clothes, overalls, etc. shall be stored to
prevent fire from spontaneous combustion.

Sand to blast hose shall be kept grounded to prevent static electricity buildup.

Paint products shall be stored in a place specified by the Owner and in accordance with the paint
manufacturer's instructions.

Positive ventilation shall be provided in areas where paints are mixed and thinned, and where painting is
being done. Solvent drums shall be grounded, and containers receiving solvents shall be electrically
bonded to the drums by a suitable cable and clamp.

In no case shall sandblast cleaning be done on surfaces of hydrocarbon containing tanks, vessels and
equipment that are in service. In this case surface cleaning shall be performed by water
blasting with fresh water.

Sand blasting shall be done only if and when it has first been determined that the atmosphere is gas free.

► Adherence Check:

Paint adherence shall be checked as per ASTM method D 3359. Method A (X-cut) shall be used for paint
film thicker 125 microns, Method B (lattice pattern) shall be used for paint films up to 125 microns.

Test Method A: An X-cut is made in the film to the substrate; pressure-sensitive tape is applied over the
cut and then removed. Acceptable rating is 5A (No peeling or removed) or 4A (Trace peeling or removed
along incisions)

Test Method B: A lattice pattern with either six or eleven cut in each direction(cross cut) is made in the
film to the substrate, pressure-sensitive tape is applied over the lattice and then removed, and adhesion is
evaluated by comparison with descriptions and illustration. Spacing between the cut lines shall be 1 mm
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 27 of 29 0001
NGGG 001 ENPI SPPA B02

for film thicknesses up to 50 microns and 2 mm for film thicknesses from 50 to 125 microns. Acceptable
results are rate 5B (The edges of the cut are completely smooth, none of the squares of the lattice is
detached) or 4B (Small flakes of the coating are detached at intersections, less than 5% of the area is
affected. If the test is unsatisfactory, the entire surface shall be blast cleaned and repainted. Recoating
after this destructive test is at the Applicator’s expense.

3.10. INSPECTION

Painting Contractor shall advise client before commencing specific paint applications.

Owner shall have the right to inspect the paintwork at all stages and to reject any and all tools,
instruments, materials, staging or equipment or work, which do not conform to the specification.

The acceptance or rejection of preparatory work and application is the sole right of Owner or his
authorized representative.

Each coat shall be checked by the inspector prior to the application of the next coat. Areas found to
contain runs, over sprays, roughness, pinholes or other signs of improper application shall be repaired in
accordance with the manufacturer's recommendations and this specification at Painting Contractor's
expense.

Finished paintwork shall have the correct shade, degree of gloss and events and be free from tackiness
after drying/curing and from cracks, holidays, runs, sage, wrinkles, patchy ness, brush marks or other
defects that may be deleterious to the quality of the coating.

Prior final acceptance of completed work, a joint inspection shall be made by Painting Contractor and
client and an agreed inspection report signed by both parties.

Owner's representative shall be promptly notified in writing of any adverse conditions which could affect
the quality of the coating application where either responsibility for the resultant coating or any remedial
work entailed may be subject to dispute.

3.11. QUALITY CONTROL AND TESTING


Painting Contractor shall submit to Owner for approval, his proposed quality control and testing
procedures covering all phases of surface preparation and paint application as may be carried out in the
shop and/or field respectively and associated procedures which define how control is established and
maintained.
‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 28 of 29 0001
NGGG 001 ENPI SPPA B02

The procedures shall form part of the "Quality Assurance Manual".

The quality control procedures shall be in the form of an inspection and test plan which references all test
procedures, witness points, acceptance and rejection criteria, frequency of testing and how control of
quality is measured and maintained.

Tests shall ensure that the quality of the surface coating is in accordance with that specified and shall
include, but shall not be limited to thickness testing, adhesion testing, holiday testing, abrasion testing,
solvent testing, etc.

All dry film thickness given in project specification shall be strictly adhered to and shall be measured in
accordance with SSPC-PA2. The maximum tolerance on dry film thickness for each coat shall be in
accordance with recommendations of the paint manufacturer, which once established shall not be
exceeded. The film thickness shall be checked with calibrated film thickness gauges, using the magnetic
resistance or eddy currents principle, such as Elcometer, Micro test, Tinsley, etc., and following the
procedures covered in SSPC-PA2. The equipment shall be calibrated at least twice daily in accordance
with the manufacturer's recommendations.

In order to achieve the specified dry film thickness, frequent checks of wet film thickness shall be carried
out during the paint application with film thickness gauges such as the Elcometer wheel or comb type.

In the event of the film thickness not meeting the specified requirements, additional coats(s) of the paint
concerned shall be applied in compliance with the specified requirements.

The degree of curing of epoxy resin based paint systems shall be checked by the determination of the
resistance of the coating to methyl ethyl ketone (MEK).

After rubbing the coating for one minute with a rag soaked in MEK, the coating shall not be softened and
shall resist scraping with a fingernail.

The adhesion of the primer to the Steel substrate and the intercoat adhesion of the subsequent coats(S)
and primer after curing shall be determined by alternative methods at the discretion of Owner.

Adhesion to the Steel substrate may be determined in accordance with X-cut tape tests described in
ASTM D3359, Method A for specified film thickness in excess of 125 microns; and Method B for
specified film thickness up to 125 microns.

The criteria for acceptance of adhesion tests shall, unless otherwise agreed, be a scale of A4 for ASTM
D3359, Method A, and a scale of B4 for ASTM D3359, Method B.

3.12. IDENTIFICATION
The Painting Contractor shall furnish a written record of surface preparation and protective coating
system used on all major plant vessels equipment, machinery, piping and structures as applicable. This
record,, in addition to the requirements of NACE RP-01-76 shall include:

► Date of surface preparation and protective coating applied.


‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره و ﻧﻈﺎرت در اﻣﻮر ﺳﻄﺢ اﻻرﺿﻲ و ﺗﺤﺖ اﻻرﺿﻲ در ﻛﻠﻴﻪ ﻣﺮاﺣﻞ اﺟﺮاي‬
‫ ﺟﺎﻧﺒﻲ و زﻳﺮ ﺳﺎﺧﺘﻬﺎ‬،‫ﻃﺮح ﺗﻮﺳﻌﻪ ﻣﻴﺪان ﻧﻔﺘﻲ آزادﮔﺎن و ﭘﺮوژه ﻫﺎي داﺧﻠﻲ‬
‫م ت ن‬-88-650 ‫ﺷﻤﺎره ﻗﺮارداد‬
(NGL-3200) ‫اراﺋﻪ ﺧﺪﻣﺎت ﻣﺸﺎوره اﺣﺪاث ﻛﺎرﺧﺎﻧﻪ ﮔﺎز و ﮔﺎز ﻣﺎﻳﻊ‬
‫ﺷﺮﻛﺖ ﻣﻠﻲ ﻧﻔﺖ اﻳﺮان‬
‫ﺷﺮﻛﺖ ﻣﻬﻨﺪﺳﻲ و ﺗﻮﺳﻌﻪ ﻧﻔﺖ‬ Painting Specification

Proj. Code Scope Disc. Code Doc. Type Seq. No Rev.


Page 29 of 29 0001
NGGG 001 ENPI SPPA B02

► Manufacturer and the company paint number for each coat.

If non-specification paint is used, use manufacturer's code number.

3.13. MARKING OF PIPING MATERIAL

If identification of piping is required by Owner, the Painting Contractor shall mark such piping with
stenciled letters located along the main axis of the pipe and easily visible from the ground that indicated
the piping designation system.

Stenciled letters shall be 25mm high and in black.

Letters shall be stenciled on the piping or piping insulation in the following locations:

► On each side of each valve within 150mm of the valve.

► Within 150mm from the point where the line terminates at a vessel, equipment or other pipe.

► Within 150mm from the points where the line enters and leaves pipe runs.

Flow Direction

► Flow direction should be stenciled at points significant for plan operation by black arrow symbol
RAL 9005 (white arrow RAL 9002 in case of black color schedule).

3.14. GUARANTEE
The Painting Contractor and the paint manufacturer shall jointly guarantee the coating systems applied for
a period of two years from the date of application. During this period, no coating failures such as
cracking, peeling, delaminating, loss of adhesion, etc. shall occur for the intended service conditions.

You might also like