VP1-0-L4-A-UYC-35101 - B-MATERIAL STORAGE - Interior Finish, Door & Window Schedule
VP1-0-L4-A-UYC-35101 - B-MATERIAL STORAGE - Interior Finish, Door & Window Schedule
Document Title MATERIAL STORAGE_Interior Finish, Door & Document Type For Information
Window Schedule
No. Section/ Owner’s Comment Response to Comment Review Status O/C * Remarks
Page Date
[Self modification]
1 Page 1 of 1 1.The shutter door size was modified as per 15/04/2021 O
maintenance concept.
2.The double door type of lobby was modified as
per maintenance method.
3. A louver has been added according to HVAC
design information for ventilation of material
storage area.
Page 1 of 1
FOR INFORMATION