Comment Response Sheet (CRS)

Project Title Van Phong 1 BOT Thermal Power Plant Project

Document Title MATERIAL STORAGE_Interior Finish, Door & Document Type For Information
Window Schedule

Document No VP1-0-L4-A-UYC-35101 Returned Status RE Prepared by L4

CRS No VP1-0-L4-A-UYC-35101-CRS CRS Issued Date 04/02/2021 Engineer Project

No. Section/ Owner’s Comment Response to Comment Review Status O/C * Remarks
Page Date
[Self modification]
1 Page 1 of 1 1.The shutter door size was modified as per 15/04/2021 O
maintenance concept.
2.The double door type of lobby was modified as
per maintenance method.
3. A louver has been added according to HVAC
design information for ventilation of material
storage area.

Additional Notes (if any)


* O - Open, C – Closed

Page 1 of 1