You are on page 1of 7

WORK INSTRUCTION

(WI-TM-029)

FLIGHT KIT CONTROL AT HOME BASE STATION

Originator :
Logistic Operation
09 February 2023
WORK INSTRUCTION
FLIGHT KIT CONTROL AT HOME BASE STATION No. : WI-TM-029

RECORD OF REVISIONS

WI No. & Issue Revision Description of Issue/Revision Date Suspersedes

WI-TM-029
0 NEW 30-07-2004 None
Issue A
• Reformatted the structures
& reissued WI-TM-029
WI-TM-029
0 • Add content & list of 21-11-2005 Issue A Rev.0
Issue B
effective pages 30-07-2004
• Add reference “RSM, “EM”
• Revise REFERENCES:”RSM
WI-TM-029
WI-TM-029 1.4.11”
1 28-09-2006 Issue B Rev.0
Issue B • Revise PURPOSE
21-11-2005
• Revise REQUIREMENT
WI-TM-029
WI-TM-029
0 • Organization changes 18-04-2008 Issue B Rev.1
Issue C
28-09-2006
WI-TM-029
WI-TM-029 • Added Handling procedure
1 04-06-2009 Issue C Rev.0
Issue C Flight kit on Part 7
18-04-2008
• Revise & add GENERAL
INFORMATION
WI-TM-029
WI-TM-029 • Revise & add DEFINITION
0 01-10-2021 Issue C Rev.1
Issue 4 • Revise flow process
04-06-2009
• Revise & add
REQUIREMENT
WI-TM-029
WI-TM-029 • Revise Flow Process
1 08-08-2022 Issue 4 Rev.0
Issue 4 • Revise Requirement
01-10-2021
Form No.: GMF/Q-036 R1

Issue : 4 Revision : 1 Date : 08 Agustus 2022 Page 2 of 6


Form No. : GMF/Q-034 R2 CONTROLLED COPY DO NOT DUPLICATE
WORK INSTRUCTION
FLIGHT KIT CONTROL AT HOME BASE STATION No. : WI-TM-029

1. GENERAL INFORMATION
1.1 Originator
Senior Manager Logistic Operation
1.2 Applicability
Material Movement Control
1.3 References
AMOM / RSQM / MOE / EM 2.2; 2.3.
1.4 Purpose
The Purpose of this Work Instruction is to provide guidance for controlling and monitoring
flight kit at home base station referring to the given schedule for certain flights.
1.5 Associated Procedures
1.6 Quality Records & Forms
GMF/A-111 Form (Shipping Document)
Form BC 4.1
Delivery Note

Issue : 4 Revision : 1 Date : 08 Agustus 2022 Page 3 of 6


Form No. : GMF/Q-034 R2 CONTROLLED COPY DO NOT DUPLICATE
WORK INSTRUCTION
FLIGHT KIT CONTROL AT HOME BASE STATION No. : WI-TM-029

2. DEFINITION :

BC 4.1 Notice document of re-release of goods from custom area to the other places

EI Engineering Instruction

Flight Kit Fly away kit or flight kit is a set of aircraft parts which is on board in the aircraft
to be used as part replacement if the aircraft is having trouble at Outstation.

MOM Minutes of Meeting

MRT Material Receiving Tag. A document as evidence of material inspection result.

OSA Outstation Plant

SP (Surat Pengiriman)

A document attached to the material contains information about material


descriptions, part number or asset number, and quantity for shipping

Issue : 4 Revision : 1 Date : 08 Agustus 2022 Page 4 of 6


Form No. : GMF/Q-034 R2 CONTROLLED COPY DO NOT DUPLICATE
WORK INSTRUCTION
FLIGHT KIT CONTROL AT HOME BASE STATION No. : WI-TM-029

3. RESPONSIBILITY AND PROCEDURE


3.1 PROCESS FLOW

PROCESS FLOW DOCUMENT RESPONSIBILITY

Start

Received Request
Information MOM / Email Logistic Controller

Update Flight Kit Monitoring Logistic Controller

Yes
Tools? Inform to tool store Email Logistic Controller

No

Inform to material
No
Logistic Controller
planner

Receive part from


Central Store SP, MRT, ARC / Serv Logistic Officer
Tag

Record PN, SN &


Expired date for Logistic Officer
each component

No
Part complete? Received tools from tool
SP Logistic Officer
store

Yes

Repackaging & Logistic Officer


weighing

Submit custom SP with stamped Logistic Officer


document by bonded

Send Flight Kit to Logistic Officer


Air Side

Handover Flight
Logistic Officer
Kit to EOB Flight Kit Checklist Form

Offload the Flight Shipping Desktop Logistic Officer


Kit Monitor

Is Flight Kit Yes Inform to PPC TL / OSA Logistic Controller


Consumed? for consume by sistem

No

Report Flight Kit Activities Flight Kit Checklist Form


Logistic Controller
to CSSM monthly Google Sheet Database

End

Issue : 4 Revision : 1 Date : 08 Agustus 2022 Page 5 of 6


Form No. : GMF/Q-034 R2 CONTROLLED COPY DO NOT DUPLICATE
WORK INSTRUCTION
FLIGHT KIT CONTROL AT HOME BASE STATION No. : WI-TM-029

3.2 REQUIREMENTS
3.2.1 Responsibilities
Logistic controller is responsible to control and monitor flight kit readiness (Quantity,
Expired date and supporting parts & documents ) to be onboard and offload according
to its flight schedule refer to list flight kit from customer or MOM.
Logistic officer is responsible to make sure flight kit onboard and offload according to
the flight schedule.

3.2.2 Flight Kit Preparation Procedure


1) Logistic Controller receive flight kit request from Material Planner refer to Minutes
of Meeting (MOM) or email.
2) Logistic Controller update flight kit monitoring.
3) Logistic Controller Inform Tool Store to prepare tools which is needed to be set as a
flight kit and coordinate to Material Planner to request aircraft parts that will be used
as flight kit.
4) Logistic Officer Received flight kit parts from tool store and central store and make
sure parts complete as mentioned to the MOM or email, If part or tools expiration
date insufficient , the part will return to store & request for new part or tools with a
sufficient expiration date.
5) Logistic Officer After the parts are complete, record their part number, serial number
and the expiration date for control shelf life of material or tools,
6) Logistic Officer Do packaging for flight kit parts to ensure the parts are safe to be
onboard, then measure for the flight kits weight.
7) Logistic Officer submit custom documents for all parts to bonded unit.
8) Logistic Officer must make sure and update the flight kit schedule before the flight
kit parts send to air side and ready to onboard.
9) After all document are complete, the flight kit parts are well packaged, and the
schedule had been confirmed, Logistic Officer send flight kit parts to air side and
handover flight kit parts to EOB contains of Flight kit Checklist Form.
10) Logistic Officer do offload flight kit parts refer to arrive schedule on shipping desktop
monitor.
11) If Flight kit parts have consumed by Outstation team, Logistic Controller inform to
PPC TL/OSA to consume by system and report flight kit activities to CSSM team
monthly for billing process to customer in google sheet database.
12) If Flight kit parts have not consumed or unused by Oustation team, Logistic
Controller report flight kit activities to CSSM team monthly for billing process to
customer in google sheet database.

Issue : 4 Revision : 1 Date : 08 Agustus 2022 Page 6 of 6


Form No. : GMF/Q-034 R2 CONTROLLED COPY DO NOT DUPLICATE

You might also like