KZ-KCC OCT, TSI CONTAINER AND DG YARD ELECTRICAL SITE

Document Title 1: ACCEPTED(REVIEWED AND AGREED)


ACCEPTANCE TEST REPORT
2: COMMENTS TO BE INCORPORATED AND RESUBMITTED
Client No.
● 3: REJECTED, DO NOT START WORK(COMMENTS TO BE INCORPORATED AND RESUBMITTED)
3Party no. KZ02-EL-REP-T5-4001 4: FOR INFORMATION
5: DOCUMENT REQUIREMENT CANCELLED

Prime Reviewer: Amit Nehra

Description Comments
No. Rev Comment Raised by Date 3Party Response
(reference) Incorporated

Refer to attached Mark-up for


comments. Please consolidate
All comments as per mark up is
your response against each
1 A01 Amit Nehra 12-May-2020 incorporated in the revised KZ02-EL- YES
comment in the CRS sheet and
REP-T5-4001-A02.
submit with next submission of the
revision.

As per the comment 5 Tests, which


are to be carried out before energising
the system is explained in the SAT
Refer to comments made on the
Procedure KZ02-EL-PRO-T5-4001.
2 A02 Cover Page. Page 1/6 Procedure KZ02-EL-PRO-T5- Amit Nehra 12-May-2020 YES
And details of ITR/Test Reports with
4001-001
document number are tabulated and
the ITR/Test Reports are embeded in
SAT Procedure document.

Page 1 of 2
Description Comments
No. Rev Comment Raised by Date 3Party Response
(reference) Incorporated

As per BP Electrical standards, (5


Tests) 1. container power supply
cable IR Test,
2. MCB & ELCB Trip Test
3. All MCB & ELCB Polarity test
4. Earth fault loop impedance Test
Foot Note. Page 6/6
3 A02 5. Electrical system earth test YES
at the bottom.
will be carried out before energising &
commissioning the Electrical systems.
The results will be entered in the
respective ITR/Test Reports which are
embedded along with Site acceptance
Procedure KZ02-EL-PRO-T5-4001.

Page 2 of 2