Riviera P3 - 5 Building - Technical Submittal - Electrical

Project Name: Azizi Riviera Phase 3 Project Code: 1084P3

Client: Ms AZIZI DEVELOPMENTS Submittal Number: 1084P3-GABU-WF034975

M/s 360 Architectural Design Consultancy


Consultant: Date: 13/05/2022
LLc

ELECTRICAL WORKS IN
Contractor: Gardinia Building Contracting LLC Sub-discipline: CONNECTION WITH-
MECHANICAL SERVICES

Discipline: Electrical Specification ref: N/A

BOQ: Old Reference TDS-MEP-EL-155-R1

Sub Contractor:

EURASIA

DOCUMENT NUMBER REVISION TITLE TYPE STATUS


1084P3-GABU-RV48C308-ALS- LOAD SCHEDULE MD,
01 Calculation C-Revise and Resubmit
ELE-CAL-0001 SMDB, DB ( CP03-008)

Final Review and Comments


Asim Matloob (Gardinia Building Contracting LLC) - Refer to the comments on the Load schedule and
comply.
Follow the DEWA NOC comments
Coordinate with the specialist for actual power requirement.
Ensure all mechanical load shall be the actual load as per the approved material submittal.
Gian Nicolas (360degree) - Checked and verified. No comments

Submittal Status: Completed Date: 24/05/2022

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Riviera P3 - 5 Building - Technical Submittal - Electrical

Gardinia Review STATUS: Completed

APPROVER: Asim Matloob (Gardinia Building ESCALATION:


Contracting LLC)

Document No. Title Type Revision Status FILE REPLACED

503_6_Document_13-05
1084P3-GABU-RV48C308- LOAD SCHEDULE MD, C-Revise and -2022-16-39-34_TS-
Calculation 01
ALS-ELE-CAL-0001 SMDB, DB ( CP03-008) Resubmit MEP-EL-0155-360-EUA-
Load Schedule.pdf
Refer to the comments on the Load schedule and comply.
Follow the DEWA NOC comments
Comments:
Coordinate with the specialist for actual power requirement.
Ensure all mechanical load shall be the actual load as per the approved material submittal.

MEP Project Manager STATUS: Completed

APPROVER: Mohit soni (Gardinia Building Contracting ESCALATION:


LLC)

Document No. Title Type Revision Status FILE REPLACED

1084P3-GABU-RV48C308- LOAD SCHEDULE MD, C-Revise and


Calculation 01
ALS-ELE-CAL-0001 SMDB, DB ( CP03-008) Resubmit
Comments:

360 Review STATUS: Completed

APPROVER: Gian Nicolas (360degree) ESCALATION:

Document No. Title Type Revision Status FILE REPLACED

1084P3-GABU-RV48C308- LOAD SCHEDULE MD, I-Checked


Calculation 01
ALS-ELE-CAL-0001 SMDB, DB ( CP03-008) and Verified
Comments: Checked and verified. No comments

360 Review STATUS: Completed

APPROVER: Alfredo Vivar (360degree) ESCALATION:

Document No. Title Type Revision Status FILE REPLACED

1084P3-GABU-RV48C308- LOAD SCHEDULE MD, C-Revise and


Calculation 01
ALS-ELE-CAL-0001 SMDB, DB ( CP03-008) Resubmit
1. Refer to the comments on the Load schedule and comply.
2. Follow the DEWA NOC comments Coordinate with the specialist for actual power
Comments:
requirement.
3. All mechanical load shall be the actual load as per the approved material submittal.

Project Manager STATUS: Completed

APPROVER: Mohammed Alshaqra (360degree) ESCALATION:

Document No. Title Type Revision Status FILE REPLACED

1084P3-GABU-RV48C308- LOAD SCHEDULE MD, C-Revise and


Calculation 01
ALS-ELE-CAL-0001 SMDB, DB ( CP03-008) Resubmit
Comments: Refer to above comments

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.