Riviera P3 - 5 Building - Technical Submittal - Mechanical

Project Name: Azizi Riviera Phase 3 Project Code: 1084P3

Client: Ms AZIZI DEVELOPMENTS Submittal Number: 1084P3-GABU-WF028346

M/s 360 Architectural Design Consultancy


Consultant: Date: 31/03/2022
LLc

GENERAL REQUIREMENTS
Contractor: Gardinia Building Contracting LLC Sub-discipline:
FOR HVAC WORKS

Discipline: HVAC Specification ref: N/A

BOQ: Old Reference TDS-MEP-ME-161

Sub Contractor:

EURASIA

DOCUMENT NUMBER REVISION TITLE TYPE STATUS


GRILLS AND DIFFUSERS
1084P3-GABU-RV48C308-ALS-
00 TECHNICAL DATA-CP03- Calculation B-Approved as Noted
HVA-CAL-0001
008

Final Review and Comments


Ahmad Hamdan (Gardinia Building Contracting LLC) - - the proposed selection is accepted
- contractor to comply to all comment on air outlet material submittal
- RAL colour must be as per arch approval and sample approval
Gian Nicolas (360degree) - Checked and verified. No comments.
Ahmed Said (360degree) - - the proposed selection is accepted - contractor to comply to all comment
on air outlet material submittal and coordination shop drawings - RAL colour must be as per arch
approval and sample approval

Submittal Status: Completed Date: 01/04/2022

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Riviera P3 - 5 Building - Technical Submittal - Mechanical

Gardinia Review STATUS: Completed

APPROVER: Ahmad Hamdan (Gardinia Building ESCALATION:


Contracting LLC)

Document No. Title Type Revision Status FILE REPLACED

GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
- the proposed selection is accepted
Comments: - contractor to comply to all comment on air outlet material submittal
- RAL colour must be as per arch approval and sample approval

MEP Project Manager STATUS: Completed

APPROVER: Mohit soni (Gardinia Building Contracting ESCALATION:


LLC)

Document No. Title Type Revision Status FILE REPLACED

GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
Comments:

360 Review STATUS: Completed

APPROVER: Gian Nicolas (360degree) ESCALATION:

Document No. Title Type Revision Status FILE REPLACED

GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS I-Checked
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- and Verified
CP03-008
Comments: Checked and verified. No comments.

360 Review STATUS: Completed

APPROVER: Ahmed Said (360degree) ESCALATION:

Document No. Title Type Revision Status FILE REPLACED

GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
Comments:

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Riviera P3 - 5 Building - Technical Submittal - Mechanical

Project Manager STATUS: Completed

APPROVER: Mohammed Alshaqra (360degree) ESCALATION:

Document No. Title Type Revision Status FILE REPLACED

GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
Comments: Refer to above comments

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.