Professional Documents
Culture Documents
GENERAL REQUIREMENTS
Contractor: Gardinia Building Contracting LLC Sub-discipline:
FOR HVAC WORKS
Sub Contractor:
EURASIA
Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Riviera P3 - 5 Building - Technical Submittal - Mechanical
GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
- the proposed selection is accepted
Comments: - contractor to comply to all comment on air outlet material submittal
- RAL colour must be as per arch approval and sample approval
GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
Comments:
GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS I-Checked
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- and Verified
CP03-008
Comments: Checked and verified. No comments.
GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
Comments:
Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.
Riviera P3 - 5 Building - Technical Submittal - Mechanical
GRILLS AND
1084P3-GABU-RV48C308- DIFFUSERS B-Approved
Calculation 00
ALS-HVA-CAL-0001 TECHNICAL DATA- as Noted
CP03-008
Comments: Refer to above comments
Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract Documents or
variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.