CUSTOMER
ITC LIMITED
PAPERBOARDS & SPECIALTY PAPERS DIVISION
UNIT:TRIBENI , HOOGHLY DISTRICT,WEST BENGAL
PROJECT
1 X 12 MW COGENERATION POWER PLANT
OWNER’s CONSULTANT
SPB PROJECTS AND CONSULTANCY LIMITED
CHENNAI
SUPPLIER
ENMAS GB POWER SYSTEMS PROJECTS LIMITED
CHENNAI-600 018.
SIZE : A4 EN09-109-G-DOC-0602 0
√
SUBMITTED FOR APPROVAL INFORMATION REFERENCE RECORD CONSTRUCTION
http://slidepdf.com/reader/full/dbr-for-water-treatment 1/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 2 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
Rev Altered
Date Reason for Revision
No. Checked
http://slidepdf.com/reader/full/dbr-for-water-treatment 2/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 3 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
CONTENTS
SL.NO Page
DESCRIPTION
No.
1 INTRODUCTION 4
2 PROJECT INFORMATION AND DESIGN BASIS 5
2.1 SITE DATA 5
2.2 DESIGN CONDITIONS 5
2.3 POWER SUPPLY FOR ELECTRICAL SYSTEM 5
3 DESIGN BASIS 6
4.0 WATER SYSTEM DESIGN INPUTS 10
5.0 WATER SYSTEM CAPACITY – CALCULATIONS 10
6.0 WATER SYSTEM SCHEME 14
7.0 WATER TREATMENT SYSTEM DESCRIPTION 14
8.0 ELECTRICAL SYSTEM 17
9.0 CONTROL & INSTRUMENTATION SYSTEM 18
ANNEXURES
01 ANNEXURE – 01 – Raw Water Analysis Reports 19
Reports -1 ( Technical Contract document page no 09 OF 468) 19
Report -2 - Report No. W(D)/10-11/2873 dated 09.03.2011 20
Report – 3- Report No . W(D)/11-12/686 Sep 01 , 2011 23
02 ANNEXURE – 02 – Return Condensate Analysis Reports 25
Reports -1 ( Technical Contract document page no 09 OF 468) 25
Report – 3- Report No . W(D)/11-12/687 Sep 01 , 2011 26
http://slidepdf.com/reader/full/dbr-for-water-treatment 3/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 4 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
1. INTRODUCTION
M/s. ITC LIMITED, Paperboards & Specialty Papers Division, Unit: Tribeni (hereinafter
referred to as ITC) is developing a coal based Cogeneration Power Plant (CPP) in their existing
plant at Chandrahati, Dist. Hooghly, West Bengal. The generated power shall cater to the paper
plant needs and power plant auxiliary requirement.
This Design Basis Report (DBR) covers the details pertaining to Water Treatment system for
the above 12 MW Cogeneration Power Plant.
http://slidepdf.com/reader/full/dbr-for-water-treatment 4/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 5 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
iii Wind velocity (max) 50 m/sec (as per IS 875 Part III)
http://slidepdf.com/reader/full/dbr-for-water-treatment 5/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 6 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
3.1 RAW WATER ANALYSIS (For Power Cycle Make-up Stream & Cooling tower
Make-up Stream)
The raw water analysis reports received from the OWNER is provided in the enclosed
“ANNEXURE – 01 – RAW WATER ANALYSIS REPORTS”
The raw water analysis reports (Refer Annexure-1) were studied and selected maximum values
are indicted below. The system will be designed considering these parameters.
Sl
Test parameters Unit Design parameter
No.
1. Colour Hazen 1
2. Odour Unobjectionable
3. Taste: Agreeable
4. Turbidity NTU 4.2
5. pH 7.2-7.6
6. TSS ppm 10
7. TDS ppm 474
8. Total Hardness as caco3 ppm 294
9. Total Alkalinity ppm 405
10. Colloidal Silica as SiO2 mg/l 0.2
11. Sodium as Na mg/l 37.8
12. Potasium as K mg/l 12.6
13. Ammonium as NH4 mg/l <0.01
http://slidepdf.com/reader/full/dbr-for-water-treatment 6/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 7 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
Sl
Test parameters Unit Design parameter
No.
15. P - Alkalinity as CaCO3 mg/l Nil
16. M - Alkalinity as CaCO3 mg/l 293
17. Bi Carbonate as CaCO3 mg/l 293
18. Carbonate as CaCO3 mg/l Nil
19. Iron as (Ferrous ) mg/l <0.1
http://slidepdf.com/reader/full/dbr-for-water-treatment 7/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 8 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
Sl
Test parameters Unit Design parameter
No.
42. Lead as Pb mg/l < 0.05
43. Zinc as Zn mg/l < 0.05
44. Aluminium as Al mg/l < 0.03
45. Dissolved Volatile solids mg/l 88
46. Dissolved Fixed solids mg/l 250
The process condensate water analysis reports were studied and selected maximum values
are indicted below. The systems will be designed considering these parameter .
http://slidepdf.com/reader/full/dbr-for-water-treatment 8/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 9 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
The following are the proposed water treatment plant output parameters
TREATED WATER
SL.NO DESCRIPTION UNIT QUALITY
1 pH VALUE 6.5 – 8.5
2 TOTAL HARDNESS mg/l Nil
3 GENERAL APPEARANCE Clear & Colorless
http://slidepdf.com/reader/full/dbr-for-water-treatment 9/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 10 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
http://slidepdf.com/reader/full/dbr-for-water-treatment 10/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 11 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
SL.
DESCRIPTION UNIT Data
No
Spray water for process PRDS (as per HMBD Load
5.1.9. TPH 1.414
point LC-1)
Total Boiler Makeup Water requirement for AFBC
5.1.10. TPD 850.4
Boiler((5.1.8+5.1.9) x 24)
Net Process Condensate water available after
5.1.22. Clauses 4.1 & 4.4 ) considering blowdown losses m /hr 1.08
http://slidepdf.com/reader/full/dbr-for-water-treatment 11/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 12 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
SL.
DESCRIPTION UNIT Data
No
Total make up requirement during Boiler start up
5.1.23. m 3/hr 22.6
(5.1.21 + 5.1.22)
Total DM make up water requirement during 3
5.1.24. m /hr 35
operation (ref. Clause 5.1.10 / 24)
Make up capacity available through De-aerator make- 3
5.1.25. m /hr 35
up pumps (1W+1S)
DM Tank
DM make up water requirement per day (ref. Clause 3
5.1.26. m /day 850.4
5.1.24)
5.1.27. DM tank storage capacity as per contract m 2 X 250
5.1.28. DM storage tank provided m 2 X 250
5.1.29. Water volume of AFBC Boiler m 70
http://slidepdf.com/reader/full/dbr-for-water-treatment 12/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 13 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
SL.
DESCRIPTION UNIT Data
No
system (during start-up / non availability of waste
water)
5.3.4. Total Service Water requirement (ref.5.3.1 to 5.3.3) m3/day 60
5.3.5. Service water pump capacity (1W+1S) with margin m3/hr 5
5.4.0. Water requirement for Coal / Ash handling system
5.4.5. Available waste water from Water Balance Diagram m3/day 456
Neutralizing pit discharge pump capacity with 10%
5.4.6. m3/hr 21
margin
5.5.0. N-pit sizing
Case 1 Normal operation only reject from RO and UF
5.5.1. m3/hr 14.5
system from water balance
5.5.2. Case 2 MGF +ACF Backwash (20 min/one day) m3/regen. 29.6
5.5.3. Case 3. SAC or SBA regeneration (45 min/one day) m3/regen. 23
5.5.4. Case 4. MB regeneration (Once in 7 day for 90 min) m3/regen. 42
Out of the above the highest contributor in one hour
5.5.5. m3/hr 29.6
i.e 5.5.2, is considered for N-pit sizing
5.5.6. N-pit volume required considering 2 hrs holding time m3 60
Note :
Service cum potable water tank of 5 m3 capacity will be provided at the CHS MCC
room top. OWNER shall terminate the service water at the tank inlet. From this tank 2 x
100% service cum potable water pump will be provided. The CHS requirement will be
http://slidepdf.com/reader/full/dbr-for-water-treatment 13/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 14 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
met by the pumps. OWNER shall terminate the service water at the STG building Top
overhead tank. And Tank capacity for this will be 1.0 m3.
The power plant water treatment system consists of the following streams,
45 m3 /hr at 3.5 kg/cm2 of Clarified/ Bore well water for each stream at MGF inlet shall
be provided by OWNER at the terminal point.
The clarified/
suspended bore
solids well in
present water is passed
the water. Thisthrough
filter is aprovided
Multigrade filtera to
to keep reduce
check the
on the
suspended solids. The suspended particles in the feed water get entrapped in the filter
http://slidepdf.com/reader/full/dbr-for-water-treatment 14/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 15 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
media. The filter will have to be washed with effluent water for 10 to 15 mins daily.
Activated carbon provides an effective method for adsorbing a wide range of organic
Compounds and can be considered for use in the removal of organic disinfection by
products and organic precursors.
Activated carbon is used is known as granular activated carbon and is known as GAC.
Granular activated carbon is used in a vessel similar in construction to pressure sand
filter and hence referred to as activated carbon filter.
The Filtered water is then passed through the Ultra Filtration System for further
polishing.
Ultrafiltration
2x 100 % Ultra filtration unit (each stream complete with basket filter and UF module),
In addition, common Fast flush tank with necessary pumps and valves will be provided
for the UF system. The UF system shall be operated on fully automatic mode through
PLC. The UF system will be operated for 20 hours/day.
Ultra-filtration is a low-pressure membrane process for the removal of colloidal silica
and Colloidal Particles (measured in terms of Silt Density Index). The feed effluent
flows from the inside of the fibers, permeates through the membrane and is removed as
the product from the shell side.
The treated water collected in the UF product water storage tank will be pumped
through RO feed pumps(2W+1S) to the Micron Cartridge filters. The cartridge filters
will be followed by high pressure pumps (2W+1S) to boost the pressure of the water
and then feed into high-pressure Reverse Osmosis (RO) Permeators and Accessories.
The RO module shall be complete with micron cartridge filter, necessary dosing for de-
chlorination, anti-scalant. A bypass arrangement with a dump valve operated through
the Oxidation Reduction Potential (ORP) instrument shall be provided to safeguard the
RO membranes.
The skid shall be designed for 100% permeate flow required as per plant water balance
at minimum 70 – 75 % recovery.
The RO product water will be further passed through a degasser tower where the weak
acids and other corrosive gases will be released. Degassed water from the degasser
tower will get collected to the degassed water storage tank of 30 min holding capacity
http://slidepdf.com/reader/full/dbr-for-water-treatment 15/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 16 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
(30cu.m). Degassed water for make up to the auxiliary cooling water system and as feed
to the DM plant will be drawn from the degassed water tank through suitable pumps.
The RO and degasser system will be operated for 20 hours/day.
iii. DM Plant.
The treated water collected in the degassed water storage tank will be pumped to the
two DM plant streams through DM feed pumps (2W+1S). Each DM plant stream shall
consist of Stron Acid Cation (SAC) unit followed by Strong Base Anion (SBA) unit and
Mixed Bed (MB) unit. The product from MB (2 X 30m3/hr ) will be led to 2 nos of DM
storage tanks(MS - Epoxy coated), each of 250 m3 capacity. The DM water tanks shall
Process Condensate water will be pumped (By OWNER) to the Plate Heat Exchange
for reducing the temperature from 70 deg.C to 40 Deg.C. The condensate water
collected in the condensate return storage tank (50KL MS Epoxy coated) will be
pumped to the condensate polishing unit through CPU Feed Pump (1W+1S). The CPU
Unit shall consist of a multi grade filter (MGF) followed by a mixed bed (MB) unit. The
product from MB (1 X 21m3/hr) will led to 2 nos of common DM storage tanks.
View glass for resin level will be provided in MB Vessel.
Anion to cation ratio in MB shall be 2 : 1 and free board shall be 120%.
Regeneration time for MB is once in a days.
pH correction dosing system ( with 1W+1S pump) shall be located at the outlet of MB
to maintain the required pH of output water. The CPU plant is designed to operated for
20 hours/day.
The
watercooling
(40 m3tower
/hr atmake up watershall
3.5 kg/cm2) stream consists at
be provided of Multi-grade
a MGF and filter
a softener
(MGF) unit.
inletRaw
by
OWNER. Product water shall be stored in 75 kL MS Epoxy coated storage tank. The
http://slidepdf.com/reader/full/dbr-for-water-treatment 16/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 17 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
treated water shall be pumped to the cooling tower basin by Cooling Water make up
pump (1W+1S) of 40 m3/hr capacity each.
H2S04 dosing system (2 dosing pumps & one day tank of suitable capacity).
Non Oxidizing biocide (With dosing tank & ejector based dosing system)
Corrosion
capacity) & Scale Inhibitor dosing (2 dosing pumps & tank of suitable
Piping of UPVC material
Dosing tanks shall be Poly Ethylene semi transparent.
pH & temperature indicator (Gauge) in the Cooling water lines.
Local control panel with ON / OFF / TRIP indication and manual START /
STOP push buttons shall be provided.
One no. Side stream filter shall be provided. The capacity of side stream
filter shall be 5% of total circulating water capacity.
Motors will conform to the latest edition of applicable IS, IEC standards. Motor duty
will be Continuous. Motors will run continuously at rated output with variation in
supply voltage ± 10% and frequency of ± 5% and combined voltage and frequency
variation of absolute sum 10%. Motors will be suitable for operation at 50°C ambient
temperature. All LV Motors will be of energy efficient type, and will have EFF2
efficiency class.
Insulation
Motor winding will be of copper and will have class F insulation but limited to class B
temperature rise.
Bearings
In general motors’ will have anti-frictional ball bearing on both DE & NDE side. All
bearings will be 63 series wherever applicable or as per manufacturer’s standard.
http://slidepdf.com/reader/full/dbr-for-water-treatment 17/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 18 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
The method of cooling will be TEFC for LV Motors. Degree of protection for enclosure
will be IP55 for indoor and IPW55 for outdoor installation
Temperature Detectors
LV Motors rated from 55kW onwards will be provided with PTC100 thermistor for
winding temperature detection. Thermistors leads will be wired up to the separate
terminal box.
Space Heater
LV motors rated from 55kW onwards will be provided with Anti- moisture
condensation space heaters. The Space Heater will be switched on whenever the motor
is idle. Space heater wires will be wired up to a separate terminal box.
Motor Main Terminal Box
The terminal box will be capable of withstanding maximum system fault current
(50KA) for duration of 0.25 sec. The terminal box will be suitable to rotate by 360° in 4
steps and will be mounted on top of the motor body.
Earthing Provision
Double earthing provision for motor body and main terminal boxes will be provided.
Operation of the entire Water Treatment Plant is manual except for the UF/ RO Plants -
which will be automated with PLC systems and accordingly pneumatic actuated valves
will be considered at appropriate points in the UF/RO Plants. Two non-redundant
Programmable Logic Controllers (PLCs) will be used for the UF and RO Plants
automation. These PLCs will be supplied with Modbus RTU RS485 ports (Modbus
Slave to Main Plant DCS). Modbus communication is envisaged between PLC and
DCS for monitoring purpose.
For the remaining pumps, start / stop will be by manual operation. Pump trip for
avoiding dry run will be incorporated through level switches interlocked in MCC Panel.
For important Analog measurements, Transmitters will be used with in-built indication.
These analog parameters will be connected to DCS through hardwired for monitoring
purpose.
One No. raw water common header line flow measurement with Orifice and differential
pressure transmitter shall be provided.
http://slidepdf.com/reader/full/dbr-for-water-treatment 18/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 19 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
The following river water analysis as submitted by the OWNER is considered for
sizing the water treatment plant.
ppm,SO 4=0.5ppm
http://slidepdf.com/reader/full/dbr-for-water-treatment 19/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 20 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
http://slidepdf.com/reader/full/dbr-for-water-treatment 20/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 21 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
16 CaCO 3 as CaCO
Carbonate 3 IS:3025(Part-23)-1987 mg/l 293
Nil
17 Iron as (Ferrous ) APHA 20 Edn.3500FeB mg/l <0.1
18 Iron as (Ferric) APHA 20 Edn.3500FeB mg/l 0.23
19 Calcium as Ca APHA 20 Edn.3500CaB mg/l 56
20 Lima as CaO APHA 20 Edn.3500CaB mg/l 78
21 Magnesium as Mg APHA20Edn.3500MgB mg/l 17
22 Sulphate as SO 4 IS:3025(Part-24)-1986 mg/l <5
-
23 sulphide as S APHA20Edn.3500MgB mg/l <0.1
24 Chloride as Cl APHA 20 Edn.4500ClB mg/l 10
25 Nitrate as NO 3 APHA20Edn.4500NO3 mg/l 1.8
26 Nitrate Nitrogen as N APHA20Edn.4500NO3D mg/l 0.41
27 Nitrite as NO 2 APHA20Edn.4500- mg/l
NO 2B <0.02
28 Total Hardness as APHA 20 Edn.2340C mg/l
CaCO 3 212
29 Reactive Silica APHA 20 Edn.4500 mg/l
SiO 2C 12.1
30 Dissolved Phosphate APHA 20 Edn.4500 - PD mg/l
as PO 4 <0.003
31 Total phosphate as APHA 20 Edn.4500 - PD mg/l
PO4 <0.003
32 Copper as Cu APHA 20 Edn.3111B mg/l <0.05
33 Manganese as Mn APHA 20 Edn.3111B mg/l 0.08
34 Fluoride as F APHA 20 Edn.4500FD mg/l 0.48
35 Nickel as Ni APHA 20 Edn. 3111 B mg/l <0.05
36 Mercury as Hg APHA 20 Edn.3112B mg/l <0.001
37 Cadmium as Cd APHA 20 Edn. 3111 B mg/l <0.01
38 Total Chromium as Cr APHA 20 Edn. 3111 B mg/l <0.05
39 Arsenic as As APHA 20 Edn.3114C mg/1 0.008
Cyanide as CN APHA 20 Edn.4500CN- mg/l
40 F <0.05
41 Lead as Pb APHA 20 Edn.3111B mg/l <0.05
42 Zinc as Zn APHA 20 Edn.3111B mg/l <0.05
43 Aluminium as Al APHA 20 Edn.3111D mg/l <0.03
http://slidepdf.com/reader/full/dbr-for-water-treatment 21/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 22 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
D) If any wide variation in water analysis is observed during contract execution stage
resulting in addition / enhancement of any equipment the same shall be at additional cost.
Provision to add Ultra-Filtration in future to be made before RO. Same should be shown
in layout & P&ID. In case of requirement of UF due to colloidal silica more than 0.2mg/l
in raw water, supplier will provide on mutually agreed price, Necessary flanges & blinds
to be included.
http://slidepdf.com/reader/full/dbr-for-water-treatment 22/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 23 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
SAMPLE DRAWN BY US :
No. W(D)/11-12/686 Date : September 01, 2011 Page 1 of 2
Issued to : M/S I.T.C. LTD.
: P.S.P.D., Unit Tribeni, Chandrahati, Hooghly.
Your Ref. No. : Letter dtd. 19.08.2011
Sample Description : Water
Collection Source : Fresh Water from Surface Pump House.
Sample Collected on : 19.08.2011
Analysis Completed on : 29.08.2011
: IS : 1622 : 1981 & IS : 3025 (Part -
Method of Sampling 1) - 1987
Mode of Sampling : Grab
A. Microbiological Test Findings :
Sl Test parameters Test Method Unit Results
No.
1 Coliform APHA 20 Edn. 9222 B
Organism/100ml CFU 58
2 E. coli/100ml APHA 20 Edn.9222 D CFU Absent
3 TVC IS:5402:2002 CFU 730
4 Sulphate Reducing IS:13428:1998 Annex - 6
Bacteria Absent
http://slidepdf.com/reader/full/dbr-for-water-treatment 23/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 24 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
25
26 Fluoride
Phenolic as F
Compounds APHA
APHA 20
20 Edn.4500FD
Edn.5530C mg/l
mg/l 0.36
<0.001
27 Mercury as Hg APHA 20 Edn.3112B mg/l <0.001
28 Cadmium as Cd APHA 20 Edn. 3111 B mg/l <0.01
29 Selenium as Se APHA 20 Edn.3111B mg/l <0.01
30 Arsenic as As APHA 20 Edn.3114C mg/l < 0.001
31 Cyanide as CN APHA 20 Edn.4500CN- mg/l
F <0.05
32 Lead as Pb APHA 20 Edn.3111B mg/l <0.05
33 Zinc as Zn APHA 20 Edn.3111B mg/l < 0.05
34 Aluminium as Al APHA 20 Edn.3111D mg/l <0.03
35 Boron as B APHA 20 Edn 3500 -BC mg/l <1.0
36 Barium as Ba IS : 13428 : Annex F mg/l <0.1
37 APHA 20 Edn.4500 -
Free Carbondioxide mg/l 0.88
CO 2C
38 Carbonate as CaCO 3 IS:3025(Part-23)-1986 mg/l Nil
39 biCarbonate as CaCO 3 IS:3025(Part-23)-1986 mg/l 289
-
40 Sulphide as S APHA20Edn.4500 S B mg/l <0.1
41 Sulphide as H2S APHA20Edn.4500 S B mg/l < 0.1
42 Ammoniacal Nitrogen APHA 20 Edn. 4500 mg/l
NH 3 F <0.01
43 Ammonia as NH 3 APHA 20 Edn. 4500 mg/l
NH 3 F <0.01
44 BOD IS : 3025 (Part - 44) - mg/l
1993 <5.0
45 COD APHA 20EDn 5220 B mg/l <5.0
46 Dissolved Oxygen IS : 3025 (Part - 38) mg/l 6.2
47 Total Chromium as Cr APHA 20 Edn. 3111 B mg/l <0.05
48 Nickel as Ni APHA 20 Edn. 3111 B mg/l <0.05
49 Lima as CaO APHA 20 Edn.3500CaB mg/l 99.4
50 Iron as Fe(Ferrous ) APHA 20 Edn.3500FeB mg/l <0.1
51 APHA 20 mg/l
Nitrate Nitrogen as N Edn.4500NO3D 0.271
52 Total Dissolved
Phosphate as Po 4 < 0.003
http://slidepdf.com/reader/full/dbr-for-water-treatment 24/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 25 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
http://slidepdf.com/reader/full/dbr-for-water-treatment 25/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 26 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
If any wide variation in water analysis is observed during contract execution stage resulting in
SAMPLE DRAWN BY US :
No. W(D)/11-12/687 Date : September 01, 2011 Page 1 of 2
Issued to : M/S I.T.C. LTD.
: P.S.P.D., Unit Tribeni, Chandrahati, Hooghly.
Your Ref. No. : Letter dtd. 19.08.2011
Sample Description : Water
Collection Source : Condensed Water at Paper Machine.
Sample Collected on : 19.08.2011
Analysis Completed on : 29.08.2011
: IS : 1622 : 1981 & IS : 3025 (Part -
Method of Sampling 1) - 1987
Mode of Sampling : Grab
A. Microbiological Test Findings :
Sl Test parameters Test Method Unit Results
No.
1 Coliform APHA 20 Edn. 9222 B
Organism/100ml CFU <1
2 E. coli/100ml APHA 20 Edn.9222 D CFU Absent
3 TVC IS:5402:2002 CFU 2
4 Sulphate Reducing IS:13428:1998 Annex - 6
Bacteria Absent
B. Physical Test Findings:
1. Appearance when analysed : Clear. 2.Appearance After Filtration : Clear.
C. Chemical Test Findings:
Sl Test parameters Test Method Unit Results
No.
1 Colour: IS:3025-1964Clause-5 Hazen 1
2 Smell : Unobjectionable
3 TSS APHA 20 Edn. 2540 D mg/l <10
4 Turbidity APHA 20 Edn.2130B NTU <1
5 pH value at 25º C APHA 20 Edn.4500H+B …… 7.1
6 Conductivity at 25˚ C APHA 20 Edn 2510 B µs/cm 7
7 APHA 20 Edn. 4500 - mg/l
Colloidal Silica as SiO 2 SiO 2C < 0.1
8 Total Dissolved Solids APHA 20 Edn.2540C mg/l 4
9 Volatile Solids at 550˚C APHA 20 Edn.2540E mg/l <4
10 APHA 20 Edn. 3500 mg/l
Sodium as Na NaB <1
11 Potasium as K APHA 20 Edn. 3500 KB mg/l <1
http://slidepdf.com/reader/full/dbr-for-water-treatment 26/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 27 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
20
21 Nitrate as NO
Nitrite as NO 3 APHA20Edn.4500NO3D
APHA20Edn.4500- mg/l
mg/l < 0.1
2
NO 2B <0.02
22 Total Hardness as APHA 20 Edn.2340C mg/l
CaCO 3 1
23 Copper as Cu APHA 20 Edn.3111B mg/l <0.05
24 Manganese as Mn APHA 20 Edn.3111B mg/l < 0.05
25 Fluoride as F APHA 20 Edn.4500FD mg/l < 0.1
26 Phenolic Compounds APHA 20 Edn.5530C mg/l <0.001
27 Mercury as Hg APHA 20 Edn.3112B mg/l <0.001
28 Cadmium as Cd APHA 20 Edn. 3111 B mg/l <0.01
29 Selenium as Se APHA 20 Edn.3111B mg/l <0.01
30 Arsenic as As APHA 20 Edn.3114C mg/l < 0.001
31 Cyanide as CN APHA 20 Edn.4500CN- mg/l
F <0.05
32 Lead as Pb APHA 20 Edn.3111B mg/l <0.05
33 Zinc as Zn APHA 20 Edn.3111B mg/l < 0.05
34 Aluminium as Al APHA 20 Edn.3111D mg/l <0.03
35 Boron as B APHA 20 Edn 3500 -BC mg/l <1.0
36 Barium as Ba IS : 13428 : Annex F mg/l <0.1
37 APHA 20 Edn.4500 -
Free Carbondioxide mg/l 0.88
CO 2C
38 Carbonate as CaCO 3 IS:3025(Part-23)-1986 mg/l 1.0
39 biCarbonate as CaCO 3 IS:3025(Part-23)-1986 mg/l 1.0
-
40 Sulphide as S APHA20Edn.4500 S B mg/l <0.1
41 Sulphide as H2S APHA20Edn.4500 S B mg/l < 0.1
42 Ammoniacal Nitrogen APHA 20 Edn. 4500 mg/l
NH 3 F <0.01
43 Ammonia as NH 3 APHA 20 Edn. 4500 mg/l
NH 3 F <0.01
44 BOD IS : 3025 (Part - 44) - mg/l
1993 <5.0
45 COD APHA 20EDn 5220 B mg/l <5.0
46 Dissolved Oxygen IS : 3025 (Part - 38) mg/l 5.9
47 Total Chromium as Cr APHA 20 Edn. 3111 B mg/l <0.05
http://slidepdf.com/reader/full/dbr-for-water-treatment 27/28
7/23/2019 DBR for Water Treatment
12MW- ITC
DESIGN BASIS REPORT FOR WATER EN09-109-G-DOC- 00 28 of 28
LIMITED, TRIBENI
TREATMENT SYSTEM 0602
UNIT.
Note :
Minimum Detection Limit of TSS - 10mg/l,Colloidal Silica - 0.1mg/l, Iron - 0.1mg/l,Sulphate -
5.0mg/l,Nitrate - 0.02mg/l,Cu - 0.05mg/l
Phenolic Compounds - 0.001mg/l, Mercury - 0.01mg/l,Cd - 0.01mg/l,Se - 0.01mg/l,Chromium
Hexavalent - 0.01mg/l, As - 0.001mg/l,
CN - 0.05mg/l,Lead - 0.05mg/l,Al - 0.03mg/l,Zinc - 0.05mg/l,B - 1.0mg/l,Ba - 0.1mg/l,Sulphate as S -
0.1mg/l, H2S - 0.1mg/l,
Ammonical Nitrogen - 0.01mg/l,Ammonia - 0.01mg/l,BOD - 5.0mg/l,COD - 5.0mg/l,Cr - 0.05mg/l,Ni
- 0.05mg/l,Iron(Ferrous) - 0.1mg/l,
Total Dissolved Phosphate - 0.003mg/l,Volatile Solids - 4.0mg/l,Na - 1.0mg/l,K - 1.0mg/l,p-Alkalinity
- 2.0mg/l,m-Alkalinity - 2.0mg/l,
Ca - 1.0mg/l,Mg
0.1mg/l&Total - 1.0mg/l,Cl
Fixed - 2.0mg/l,Nitrate - 0.1mg/l,Nitrite - 0.02mg/l,Nitrate Nitogen -
Solids - 4mg/l.
http://slidepdf.com/reader/full/dbr-for-water-treatment 28/28