CONSTRUCTION MOCK UP OF PATING WORK FOR SUBSTATION METE WALL AT LIFT STATION

DFT INSPECTION FOR PRIMER COAT


DATE OF INSPECTION 15-OCTOBER -2022
PICTURE -1 &2 PICTURE – 3 &4
CONSTRUCTION MOCK UP OF PATING WORK FOR SUBSTATION METE WALL AT LIFT STATION

VISUL INSPECTION FOR PUTTY PRIOR TO INTERMEDIATE COAT


DATE OF INSPECTION 16-OCTOBER -2022
POICTURE
CONSTRUCTION MOCK UP OF PATING WORK FOR SUBSTATION METER WALL AT LIFT STATION

VISUL & DFT INSPECTION FOR FIRST COAT PRIOR TO SECOND COAT
DATE OF INSPECTION 18-OCTOBER -2022
CONSTRUCTION MOCK UP OF PATING WORK FOR SUBSTATION METE WALL AT LIFT STATION

VISUL & DFT INTERMEDIATE COAT PRIOR TO FIRST COAT


DATE OF INSPECTION 17-OCTOBER -2022
PICTURES 1 PICTURES 2