Previous specimen = 5

Total Specimen Wet Connection Date: 10-11-2021 to 12-11-2021

Batching Casting of
Load cell Micro concrete
5+1 = 6 Activity formwork precast
configuration Cube Casting
preparation connection -I

Date: 15-11-2021 to 20-11-2021

Batching, Strain gauge preparation, Casting of precast connection-II (3), Tension test of SSWM
6+3 = 9 Activity
with Sikadur, Formwork for the bond test

Tension Test
Date: 22-11-2021 to 26-11-2021

Batching, Strain gauge preparation, Casting of precast connection-III (3), Specimens for bond
9+3 = 12 Micro Concrete = 2 Activity
test

Bond Test
Date: 29-11-2021 to 4-12-2021

Reinforcement preparation, Batching, Strain gauge preparation, Casting of precast connection-


12+3 = 15 Activity FEM
IV (3)

Date: 6-12-2021 to 10-12-2021

15+3 = 18 Micro Concrete = 6 Activity Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-V (3)
Date: 13-12-2021 to 18-12-2021

Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-VI (3),
18+3=21 Micro Concrete = 9 Activity
Testing of precast connection -I

Date: 20-12-2021 to 25-12-2021

Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-VII (3) Testing and
21+3=24 Micro Concrete = 12 Activity
retrofitting of precast conenction-II

Date: 27-12-2021 to 1-1-2022

Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-VIII (3) Testing and
24+3 = 27 Micro Concrete = 15 Activity
retrofitting of precast coonection-III

Date: 03-01-2022 to 7-1-2022

Micro Concrete = 18 Activity Micro Concrete for the precast connection, Testing and retroftiing of precast connection-IV

Date 10-1-2022 to 15-1-2022

Micro concrete = 21 Activity Micro concrete for precast connection, Testing and retroftiing of precast connection-V

Date 17-1-2022 to 21-1-2022

Micro concrete = 24 Activity Micro concrete for precast connection, Testing and retroftiing of precast connection-VI

Date 24-1-2022 to 29-1-2022

Micro concrete = 24 Activity Remaining retrofitting and testing

Date 31-1-2022 to 5-2-2022

Activity Remaining retrofitting and testing