Batching Casting of
Load cell Micro concrete
5+1 = 6 Activity formwork precast
configuration Cube Casting
preparation connection -I
Batching, Strain gauge preparation, Casting of precast connection-II (3), Tension test of SSWM
6+3 = 9 Activity
with Sikadur, Formwork for the bond test
Tension Test
Date: 22-11-2021 to 26-11-2021
Batching, Strain gauge preparation, Casting of precast connection-III (3), Specimens for bond
9+3 = 12 Micro Concrete = 2 Activity
test
Bond Test
Date: 29-11-2021 to 4-12-2021
15+3 = 18 Micro Concrete = 6 Activity Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-V (3)
Date: 13-12-2021 to 18-12-2021
Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-VI (3),
18+3=21 Micro Concrete = 9 Activity
Testing of precast connection -I
Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-VII (3) Testing and
21+3=24 Micro Concrete = 12 Activity
retrofitting of precast conenction-II
Micro Concrete, Batching, Strain gauge preparation, Casting of precast connection-VIII (3) Testing and
24+3 = 27 Micro Concrete = 15 Activity
retrofitting of precast coonection-III
Micro Concrete = 18 Activity Micro Concrete for the precast connection, Testing and retroftiing of precast connection-IV
Micro concrete = 21 Activity Micro concrete for precast connection, Testing and retroftiing of precast connection-V
Micro concrete = 24 Activity Micro concrete for precast connection, Testing and retroftiing of precast connection-VI