Sr.DME/BZA
Ref: - Sr.DME/BZA’s
Sr.DME/BZA Lr.No.B/M.111/M&P/Budget/PH-4200/2022
4200/2022-23, Dt.23-08-2022.
***
Encl: As above.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
The following Civil works are yet to be started:
1) Construction of rooms with galvalume sheets for E3 pinion
cleaning, PPO.
(2) Provision of drinking water to with GI Pipeline to newly
constructed BTC and staff room.
(3) Maintenance work of BA room.
(4) Construction of GLR water tank.
Civil 98276 70159 41100 2068 0 39032 41100 0 0 (5) Construction of platform for oil barrels of SMM depot &
Vijayawada acid godown.
(Electric Loco Shed) - (6) Construction of healthcare unit.
642/11.00.42. Augmentation of (7) Modification of SSE rooms & Drawing room.
1 CAP
13.1.30.006 homing capacity of (8) Laying of approach road.
electric locos from 175 (9) Provision of additional facilities to toilets including
to 225 construction of new septic tank
Elec/TRS 116126 42337 15000 2738 0 9262 12000 0 3000 80 Lakhs P.O. released and 40 lakhs indents under process
Elec/TRD 10360 12904 2500 0 0 0 0 0 2500 work completed
S&T 6225 4052 1400 40 0 1419 1459 0 -59 Minar variation
Elec/Con(Gen) 12316 13211 10000 0 0 10000 10000 0 0 work under process
Total 243303 142663 70000 4846 0 59713 64559 0 5441
Extension of ML Bay LOA issued on 30-09-2021. The
Civil 13338 0 13338 0 0 13338 13338 0 0 drawings have been approved and work under process. TDC
31-12-2022
LOA No.B/E.29/Tr.D/TNDR/01/2021-22/00584060038205
Elec/TRD 491 0 491 0 0 800 800 0 -309
dt.12-07-2021 work under process
Total 103593 800 50000 48643 0 55259 103902 0 -53902