Professional Documents
Culture Documents
Project
Name Andres LNG Terminal Expansion Project, Dom Republic
Project No. N/A Subcontractor Consorcio Remix S.A.
Inspection
Discipline Civil Engineering 06/01/2023 09:30 a. m.
Date/Time
Reference
ELT-01-EP-DWG-001-10 WEG Pump Area Pedestals.
DWG.
-V-530
-P-523 A/B
-E-521A/B
-P-526 A
CONSORCIO
REMIX
POSCO E&C POSCO E&C
Subcontractor AES Owner
Construction QA/QC
Signature
Date 7/11/2002
Page No. : 6 of 11
Location ELT-01-EC-DWG-0008-
NO CHECK ITEM PASS FAIL N/A NO CHECK ITEM PASS FAIL N/A
1.0 Lean concrete 3.3 Realease coating agent x
2.5 Tying rebar and sufficient bar support x 5.1 Cleaning (Rebar,form, Area)
x
3.0 Form work 5.2 Cleaning concrete joint x
3.1 Layout accordinf to drawing x 5.3 Installation of waterstop x
3.2 Sufficient rigth to prevent leakage x
Attachment
No. Descriptiom Reference No. Perfomed by Remarks
6 Protocol ( survey report)
Remarks:
Sub-contractor Contractor
Enngine QA/QC Civil Arch Mech Elec QA/QC
DISCIPLINE: Civil
SUBCON: Consorcio Remix S.A.
ITP No: ELT-01-CQ-PC-0101
DESCRIPTION:
COMPLETED
ITEM DRAWING No. DESCRIPTION
SUBCON. CE/QC