PROJECT

WEEKLY CONSTRUCTION WORK PLAN Month Week


CLX PROJECT

For the Period: November 3-7, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b) Clearing, Excavation, Installation of Sta. 19+200 (Site Office) FE Grace
Waterline, etc.)

Sta. 06+060 - Sta.


Soil Sampling 06+400(int.) and Sta. FE Fajardo
13+280 - Sta. 13+620(int.)

Installation of Signages for Right- Sta. 0+920 - Sta. 08+500


Of-Way (int.)
FE Estillore

Sta. 05+838.03 to Sta. FE Fajardo &


Individual Removal of Trees
06+267.92 (int.) FE Estillore
Estimated Asphalt or Concrete Requirements
Concrete Unit Asphalt Unit
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CLX PROJECT

For the Period: November 9 -14, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b) Clearing, Excavation, Installation of Sta. 19+200 (Site Office) FE Grace
Waterline, etc.)

Sta. 05+620 - Sta. FE Fajardo &


Soil Sampling
05+840(int.) FE Estillore

FE Fajardo &
Lay Out for Cross-Section Sta. 0+060
FE Estillore

Estimated Asphalt or Concrete Requirements


Concrete Unit Asphalt Unit
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CLX PROJECT

For the Period: Octoberr 26 -31, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b) Clearing, Excavation, Gate Sta. 19+200 (Site Office) FE Grace
Fabrication, etc.)

FE Fajardo &
Lay Out for Rerouting of Irrigation Sta. 13+000 - Sta. 13+620
FE Estillore

FE Fajardo &
Transferring ConVans CALAX Office
FE Estillore

Estimated Asphalt or Concrete Requirements


Concrete Unit Asphalt Unit
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CLX PROJECT

For the Period: Octoberr 19 -24, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b) Clearing, Excavation, Gate Sta. 19+200 (Site Office) FE Grace
Fabrication, etc.)

Continuation for Relocation of FE Fajardo &


Sta. 06+000 - Sta. 06+040
Fence FE Estillore

Unloading and Relocation of FE Fajardo &


Sta. 19+200
ConVans FE Estillore

Clearing and Grubbing of FE Fajardo &


Sta. 06+000 - Sta. 06+060
Obstruction Materials FE Estillore

Estimated Asphalt or Concrete Requirements


Concrete Unit Asphalt Unit

cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CLX PROJECT

For the Period: Octoberr 12 -17, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b) Clearing, Excavation, Perimeter Sta. 19+200 (Site Office) FE Grace
Fence, etc.)

FE Fajardo &
Knot Tying of Slope Stake Sta. 05+820 - Sta. 6+260
FE Estillore

Sta. 05+820 - Sta. 05+900


FE Fajardo &
Tree Tagging and Sta. 06+180 - Sta.
06+260 FE Estillore

Estimated Asphalt or Concrete Requirements


Concrete Unit Asphalt Unit
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CLX PROJECT

For the Period: October 05 -10, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b) Clearing, Excavation, Perimeter Sta. 19+200 (Site Office) FE Grace
Fence, etc.)

Sta. 18+660, Sta. 19+360,


Lay Out for Road Right-Of-Way, FE Fajardo &
Sta. 26+740 -Sta. 27+100
and Sta. 27+200 - 27+500 FE Estillore
Bored Pile, and Cross-Section

Clearing of Construction Materials FE Fajardo &


Sta. 06+020 - Sta. 06+060
in MPCala Perimeter Fence FE Estillore

Estimated Asphalt or Concrete Requirements


Concrete Unit Asphalt Unit
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File
PROJECT
WEEKLY CONSTRUCTION WORK PLAN Month Week
CLX PROJECT

For the Period: September 28 - October 3, 2020 Page 1


Contract Details
Project Manager Antonio P. Aguilar Safety Officer
Materials Engineer Eladio Limos Pollution Control Officer
Quantity Engineer Yanie De Vera Contractor E.C. de Luna Construction Corp.
Work Details
Pay Item No. Description Stations Engineer Manpower Size Target Output Unit

Contractors Facilities (Site


B.1(b)
Clearing, Excavation, etc.)
Sta. 19+200 (Site Office) FE Grace

FE Fajardo &
Soil Sampling Sta. 13+020 - Sta. 13+620
FE Estillore

FE Fajardo &
Relocation of Perimeter Fence Sta. 06+020 - Sta. 06+060
FE Estillore

Estimated Asphalt or Concrete Requirements


Concrete Unit Asphalt Unit
cu.m. m.t
Procurement Log
List of items needed within seven (7) days
GRS No. Item Description Qty GRS No. Item Description Qty
1 4
2 5
3 6
Equipment Requirement Summary
Equipment Description Qty Equipment Description Qty
1 Asphalt Paver 0 5
2 Pneumatic Roller 0 6
3 Asphalt Paver/Distributor 0 7
4 Tandem Roller 0 8
Additional Manpower Requirement
Position No. Position No.
1 4
2 5
3 6
Quality Test Requirements Health & Safety
Pay Item No. Description Quality Test Required Hazard Description PPE/Device Qty Assigned Person/s
B.O.M.

NOTE: NO COMPANY NURSE

Environment

Form No. F-CON-001 Rev. No. 1 Issued 11/21/2018 Attach additional sheets if necessary

Distribution Batching, Warehouse, Equipment,HRAD , MTQC, Safety, Environment & Engineering HO, File