Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
(a) Hard top vehicle with AC, power Veh. Quantity as per BOQ,therefore no
4 (A)
steering , etc. 1376.20 425.00 584885.00 1376.20 425.00 584885.00 - - - -
Days variation in this item
Supply of colour record photographs two
prints of size 6"*4" mounted in album Quantity as per BOQ,therefore no
5 1.03
complete with DVD as par Techincal No 48.20 121.00 5832.20 48.20 121.00 5832.20 - - - -
variation in this item
Specifications Clause 124.
9 (I) Girth from 300 mm to 600 mm Each 88.00 193.00 16984.00 0.00 - - - - 88.00 16984.00
10 (II) Girth from 600 mm to 900 mm Each 37.00 348.00 12876.00 0.00 - - - - 37.00 12876.00 Tree cutting work was handed over and
executed by Singrauli Municipal
11 (III) Girth from 900 mm to 1800 mm Each 15.00 671.00 10065.00 0.00 - - - - 15.00 10065.00 Coorporation, hence saving in this item.
12 (IV) Girth above 1800 mm Each 7.00 1267.00 8869.00 0.00 - - - - 7.00 8869.00
Page 1 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Dismantling of Structures
Dismantling of existing structures like
culverts, bridges, retaining walls and
other structure comprising of masonry,
cement concrete, wood work, steel work,
15 2.3 including T&P and scaffolding wherever
necessary, sorting the dismantled
material, disposal of unserviceable
material and stacking the serviceable
material with all lifts and lead of 1000
meters.
Page 2 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Page 3 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Embankment Construction with Material
Obtained from Borrow Pits Construction
26 of embankment with approved material CUM
having CBR>7 obtained from borrow pits
Quantity as per BOQ,therefore no variation
3.10 with all lifts and leads, transporting to 70290.22 144.00 10121791.68 70290.22 144.00 10121791.68 - - - - in this item
site, spreading, grading to required slope
Page 4 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Page 5 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
37 (i) Sqm)
.@ 0.25 kg per Sqm (normal bituminouss surface 102391.44 12.00 1228697.28 102391.44 12.00 1228697.28 0.00 0.00 - - Quantity as per BOQ and extra 1%
already taken in BOQ for widening
and junction development,therefore
38 (ii) Sqm
.@ 0.30 kg per sqm (Dry & hungry bituminous surface 169047.14
/ granular surface trcated 2366659.96
14.00 with primer 169047.14 14.00 2366659.96 - - - - no variation in this item
Page 6 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
44 (i) 90cm equilateral triangle Each 76.00 3291.00 250116.00 76.00 3291.00 250116.00 - - - -
45 (ii) 60cm equilateral triangle Each 68.00 2340.00 159120.00 68.00 2340.00 159120.00 - - - -
Quantity as per BOQ,therefore no
46 (iii) 60cm circular Each 8.00 2962.00 23696.00 8.00 2962.00 23696.00 - - - -
variation in this item
47 (iv) 80cmx60cm rectangular Each 8.00 3928.00 31424.00 8.00 3928.00 31424.00 - - - -
48 (v) 60cm x45 cm rectangular Each 189.00 2899.00 547911.00 189.00 2899.00 547911.00 - - - -
Quantity as per BOQ,therefore no
variation in this item
providing and erecting direction and place
identification retroreflectorised sign asper
IRC:67 made of high intenity micro Prismatic
Grade sheting (Type XI) vide clause 801.3.3
fixed over Aluminium composite material
sheet with thermoplastic core of low density
polyeth lene (LDPE) between two thick skin /
sheet of aluminium with oversll thickness of
4mm and aluminium skin of thickness 0.3 on
both side , the ACM shall conform to table
800-1 of specifacation and high intensity
49 8.5 Micro prismatck grade sheeeting shall Sqm 4.50 6641.00 29884.50 4.50 6641.00 29884.50 - - - -
conform to Table 800-3 of specification . The
printing on the high intensity grade sheeting
shall conform tp caluse 801.3.7 with water
based latex optimized transparent ink as
specified by the sheeting manufacturer
supported on composite material in
accordance to IRC 67-2010 fixed to ground by
means of properly designed foundation with
M15 grade concrete 450x450x600mm. the
ACM sheet shall be fixed to the post with
minimum two number breakaway bolts.
Page 8 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Quantity as per BOQ,therefore no
Kilo meter Stone .Reinforced cement variation in this item
concrete M15 grade kilometre stone of
standard sesign as per IRS:8-1980,
53
fixing in posiion including painting and each 16.00 1681.00 26896.00 16.00 1681.00 26896.00 - - - -
8.16(ii)
printing etc.Ordinary Kilo meter
stone( precast)
Page 9 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Quantity as per BOQ,therefore no
variation in this item
Matel Beam Crash Barrier.TYPE-A, "W" :
Metal beam crash barrier ( providing
and erecting a "w" metal beam crash
barrier comprising of 3mm thick
corrrugated sheet metal beam
rail,70cm above road / ground level ,
fixed on ISMC series channel vertical
post , 150x75x5 mm spaced 2m center
58 8.25(A) to center ,1.8m high , 1.1m below meter 320.00 3406.00 1089920.00 320.00 3406.00 1089920.00 - - - -
ground / road level , all steel parts and
fitments to be galvanised by hot dip
process, all fitting to conform to
IS:1367 and IS:1364, metal beam rail to
be fixed on the vertical post with a
spacer of channel section 150x75x5mm
, 330mm long complete as per clause
810 of specifications.
Page 10 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Quantity as per BOQ,therefore no
PCC M-15 in foundation plane cement variation in this item
concrete M-15 mix with crushed stone
aggregate 40 mm nominal size
mechanically mixed , placed in
61
by Cum 2.69 3409.00 9170.21 2.69 3409.00 9170.21 - - - -
9.1
foundation and compacted
vibraction including curing for 14
days .as per MORTH & Specification
409.
Page 11 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Quantity as per BOQ,therefore no
variation in this item
Excavation for Structures. Earth work in
excavation of foundation of structures as
per drawing and technical specification,
including setting out, construction of
shoring and bracing, removal of stumps
67 12.1(B)(i) and other deleterious matter, dressing of Cum 30473.17 52.00 1584604.84 30473.17 52.00 1584604.84 - - - -
sides and bottom and backfilling with
approved material. as per relevant
clauses of section 300 & 2100 in.ordinary
soil ( mechanical means-Depth up to 3
m)
Providing and laying Plain / reinfiorced As per DPR Box culvurt is provided but As
cement concrete in open foundation per site condition slab culvurt is proposed
including form work shuttering etc. and approved. Technical advisor and Chief
complete as per drawing and teachnical
69
drawing and teachnical specification Cum 572.00 5025.00 2874300.00 3048.50 5025.00 15318712.50 2476.50 12444412.50 - - Engineer decided wiedning of slab culvurt
12.8(B)
and per relevant clauses of section during the meeting held at MPRDC Bhopal
1500, 1700 &2100 with PCC Grade (M.P.) and Toe wall of 160m at structure
M-20. therefore M-20 Quantity exceed.
Page 12 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Plain / reinforced cement concrete in Drain length is Extended for B/S 820 meter
sub - structure complete as per drawing
72
and teachnical specification .RCC Grade Cum 7749.49 5972.00 46279954.28 11925.31 5972.00 71217951.32 4175.82 24937997.04 - - Due to Site Condation And Village Area.
13.6 (F)
M-25. Hence quantity exceeded.
Supplying ,fitting and pacying HYSD bar In DPR there was a provision of Box culvurt
reinforcement in substructure complete but as per site condition and approved
74 13.7 as per drawing and teachnical MT 827.18 48936.00 40478880.48 645.00 48936.00 31563720.00 182.18 8915160.48
drawing slab culvurt is proposed hence
specification and as per relevant clause
of section 1600. Quantity saved.
Page 13 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Page 14 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Page 15 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
Supply and fixing tubular gantry M
mounted overhead / cantilever signs .All T
components of sign & supports, other
than reflective portion shall be Quantity as per BOQ,therefore no
thoroughly descsled ,cleaned , primed variation in this item
and painted with two coats of epoxy
paints. The sign back side shall be with
grey colour and post shall be in back
& white alternae bands.The post
below ground shall be painted with
three coats of read lead paint . The sign
shall be made as per IRC-67-2012 and
Technical specification section 800.The
sign board made out of 2mm thick
PMRDC alluminium sheet ,face to be fully
Approved
91
Rate in covered by high intensity grade white, Sqm 23.12 7679.00 177538.48 23.12 7679.00 177538.48 - - - -
ADB-V face to be fully covered by high
intensity grade white retro reflective
sheeting off encapsulated lens type.
The background / border / simples /
legend/ arrows shall be made by
transparent overlay film of disered
colour by as by sign detail except those
in back which shall be non reflective
type .The sign palace shall be fixed
6mm dia alluminium rebate on MS
angle iron frame .The angle iron frame
shall be made with angle of size
75mmx75mmx6mm with additional
bracing at every 600mm c/c if any
dimenshion in more than 1200mm.
Page 16 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
M
T
Page 17 of 48
Comparative Statement of Bill of Quantity, Amount and Proposed Quantity and Amount
Name of Project
4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of client
Madhya Pradesh Road Development Co. Ltd.
Name of Consultant
M/s Lion Engineering Consultant in JV with Technogem Consultant Pvt. Ltd.
Name of Contractor
M/s Shiv Shakti Construction Co. Satna.
BOQ Quantities & Amount Proposed Quantity & Amount Positive Variation Negative Variation Remark
Unit QTY Rate S BOQ Proposed Rate Amount Qty Amount Qty Amount
O Amount Qty
SOR R
S.N Item Description
A
As Per Approved Drawing of structure
M hence quantity exceeded .
T
Team Leader
M/s Lion Engineering in Jv with
Technogem Consultants Pvt. Ltd.
Q.S.
M/s Shiv Shakti Construction Co. M/s Shiv Shakti Construction Co.
Page 18 of 48
Estimate of 3+430 Slab Culvert
BOQ
Item DESCRIPTION Nos. L W H/D QTY Unit Rate Amount
No.
pier (Rock voll - foot & pier Voll in rock depth) 173.00
abutment ( rock voll - foot & walls voll in rock depth ) 90.30
return ( rock voll - foot & wall voll in rock depth ) 14.90
TOTAL 278.2 4299.00 1195981.8
I Grangular material
Abutment 2.00 7 7.8 5 546.00 Cum
Deduction of filter media -79.20 Cum
Total 466.80 Cum 880.00 410784
0.0
RCC M20 Grade 2 72.8 145.60 RM 2795.00 406952.0
Providing painting, figuring and numbering to minor bridges upto
10.12 30m. Linear water-way complete with Synthetic Enamal Paint .
2 2.00 Each 132.00 264.0
0.0
Painting two coats after filling the surface with synthetic enamel
8.11 paint in all shades on new plastered concrete surfaces 4
72.8 0.975 283.92 Sqm 48.00 13628.2
(i) Cement Concrete Grade M15 2 9.6 3.9 0.3 22.5 cum 4572 102705.4
c Prestressed / Reinforced cement concrete grade M-20 & above 1 8 8.4 0.8 53.76 cum 886.00 47631.36
14.9 Drainage Spouts complete as per drawing and Technical specification 6 6 NO 1194 7164
and as per clause 2705 of specifications.
Painting two coats after filling the surface with synthetic enamel paint
8.11 in all shades on new plastered concrete surfaces 4 17 0.9 61.2 Sqm 48 2937.6
8.11 Painting two coats after filling the surface with synthetic enamel paint 4 10.84 0.9 39.024 Sqm 48 1873.152
in all shades on new plastered concrete surfaces
15.8 Providing and laying Flooring complete as per drawing and Technical
specifications laid over cement concrete bedding.
(i) Cement Concrete Grade M15 2 10 8 0.3 48 cum 4572 219456
(i) Using Batch Mix Plant of appropriate capacity and Paver Finisher
Hydraustatic with Sensor control
a for Grading-II (30-45 mm thickness ) with 60/70 bitumen(VG-30) 1 13.14 20 0.04 10.512 cum 7669 80616.528
Painting two coats after filling the surface with synthetic enamel
8.11 paint in all shades on new plastered concrete surfaces 4 13.14 0.9 47.304 Sqm 48 2270.592
10.12 Providing painting, figuring and numbering to minor bridges upto 2 2 Each 132 264
30m. Linear water-way complete with Synthetic Enamal Paint .
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
PARSONA-MAJAN-NIGAHI ROAD
Chainage
S.N. DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 Exc For Road BT Scrafication Cum 0+000 0+500 B/S 1 500 1.000 0.200 100.00 TCS- I
2 Exc For Road BT Scrafication Cum 1+500 1+800 B/S 1 300 1.000 0.200 60.00 TCS- I
3 Exc For Road BT Scrafication Cum 4+000 4+500 B/S 1 500 1.000 0.200 100.00 TCS- I
4 Exc For Road BT Scrafication Cum 5+700 6+700 B/S 1 1000 1.000 0.200 200.00 TCS- I
5 Exc For Road BT Scrafication Cum 7+600 8+000 B/S 1 400 1.000 0.200 80.00 TCS- I
6 Exc For Road BT Scrafication Cum 8+670 9+925 B/S 1 1255 1.000 0.200 251.00 TCS- I
7 Exc For Road BT Scrafication Cum 0+500 1+500 B/S 1 1000 1.000 0.200 200.00 TCS- II
8 Exc For Road BT Scrafication Cum 1+800 3+250 B/S 1 1450 1.000 0.200 290.00 TCS- II
9 Exc For Road BT Scrafication Cum 3+650 4+000 B/S 1 350 1.000 0.200 70.00 TCS- II
10 Exc For Road BT Scrafication Cum 4+500 5+500 B/S 1 1000 1.000 0.200 200.00 TCS- II
11 Exc For Road BT Scrafication Cum 6+700 7+600 B/S 1 900 1.000 0.200 180.00 TCS- II
12 Exc For Road BT Scrafication Cum 3+250 3+650 B/S 1 400 1.000 0.200 80.00 TCS-III
13 Exc For Road BT Scrafication Cum 5+500 5+700 B/S 1 200 1.000 0.200 40.00 TCS-III
PARSONA-MAJAN-NIGAHI ROAD
PARSONA-MAJAN-NIGAHI ROAD
1 Drain Dismentling of Slab for Drai Cum 1+570 1+576 R/S 1 6 2.500 0.25 3.75
2 Drain Dismentling of Slab for Drai Cum 8+500 8+515 R/S 1 15 2.000 0.15 4.50
3 Drain Dismentling of Wall for Drai Cum 8+860 8+910 R/S 2 50 0.150 0.85 12.75
4 Drain Dismentling of Wall for Drai Cum 8+700 8+800 R/S 2 100 0.150 0.85 25.50
5 Drain Dismentling of Wall for Drai Cum 9+400 9+500 R/S 2 100 0.150 1.00 30.00
6 Drain Dismentling For Wall Cum 8+700 8+760 L/S 2 60 0.300 0.80 28.80
7 RCC Road Dismentling Cum 1+690 1+695 R/S 1 5 7.000 0.28 9.80
8 RCC Road Dismentling Cum 1+680 1+687 R/S 1 7 0.300 0.30 0.63
9 Drain Dismentling For Wall Cum 9+830 9+650 L/S 2 180 0.150 0.45 24.30
10 Drain Dismentling For Wall Cum 9+620 9+500 L/S 2 120 0.150 0.45 16.20
11 Drain Dismentling For Slab Cum 6+439 6+434 L/S 1 5 0.300 2.50 3.75
12 Drain Dismentling For Wall Cum 6+439 6+434 L/S 2 5 0.300 0.80 2.40
PCC-M-15 40.05
PCC M-20 579
2316000
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925
Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
PARSONA-MAJAN-NIGAHI ROAD