You are on page 1of 80

MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

NAME OF WORK :- 4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name Of Contractor:- M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

LIST OF WORK ITEMS

Value of Work done


Amount as per BOQ Approved Veration
Item Description (in Rs.) 1st. ( in Rs.)
Remarks
Cumulative Amount Upto Previous Bill This Bill Amount
A PAYMETS
A.1 WORK DONE
A.1.1 BOQ ITEMS
BILL NO.1 SITE CLEARANCE 860,492 1,034,480 1,044,510 812,956 231,554

BILL NO.2 EARTH WORK 20,989,393 20,989,393 18,742,244 15,882,541 2,859,703


BILL NO.3 SUB-BASE, BASE-COURSE
68,136,046 60,098,952 59,408,171 51,677,674 7,730,496

BILL NO.4 PAVEMENT 102,020,625 101,190,243 78,261,016 77,614,352 646,664


BILL NO.5 CROSS DRAINAGE 132,780,219 149,481,159 137,606,759 123,337,605 14,269,154
BILL NO.6 TRAFFIC SIGNS, MARKINGS AND
ROAD APPURTENANCES
9,219,963 9,219,963 5,596,371 3,321,854 2,274,517

BILL NO.7 MISCLLANEOUS 7,997,253 7,804,428 4,494,720 3,690,960 803,760


BILL NO.8 ELECTRICAL WORKS 35,230,261 35,230,261 27,892,088 22,645,672 5,246,416

BILL NO.9 NON BOQ ITEMS WORKS - 10,236,914 5,546,734 890,138 4,656,596

TOTAL (A.1) = Total of items 377,234,254 395,285,793 338,592,612 299,873,753 38,718,859


A.2 As per PAC Agreement Below 5.57% (21,011,948) (22,017,419) (18,859,608) (16,702,968) (2,156,640)

A TOTAL (A.1) = Total of items (A.1 to A.2 ) 356,222,306 373,268,374 319,733,004 283,170,785 36,562,219
B DEDUCTIONS/RELEASE

B.1 Retention Money @ 5% (15,986,650) (14,158,539) (1,828,111)

B.2 Withheld Royalty (8,509,323) (7,140,028) (1,369,295)

B.3 Withheld Electrical by MPRDC,Bhopal (2,300,000) (2,300,000) -

B.4 Withheld Mild Stone/EOT MPRDC,Bhopal (8,607,323) (8,607,323) - -

B.5 Withheld WMM Amount By Mprdc,Bhopal (6,000,000) (6,000,000) -

B.6 Excees M-20 Qty Withheld By Mprdc,Bhopal (448,221) (448,221) -

B.7 Excees M-25 Qty Withheld By Mprdc,Bhopal (4,399,661) (4,399,661) -

B.8 Excees Qty Withheld By Mprdc,Bhopal (1,141,693) (1,141,693) -

Withheld IPC-06 Amount(10 % ,Excees Qty


B.9
Amount ) By Mprdc,Bhopal
(8,087,119) (8,087,119) -

Excees (5.2(i) )Tack Coat Qty Withheld By


B.10
Mprdc,Bhopal
(238,510) (238,510) -

Team Leader Withheld/Release Lion


B.11
Engg.Consultanat Bhopal
(1,550,000) (1,550,000) -

B TOTAL B = Total of (B.1 to B.11) (57,268,500) (54,071,094) (3,197,406)


C TAXES
C.1 TDS @ 1.50% (1,130,179) (581,745) (548,433)
C.2 TDS @ 2.00% (4,887,755) (4,887,755) -
C.3 VAT @ 0.00% - - -
C.4 Labour Cess @ 1.00% (3,197,330) (2,831,708) (365,622)
C.5 CGST @ 1.00% (3,197,330) (2,831,708) (365,622)
C.6 SGST @ 1.00% (3,197,330) (2,831,708) (365,622)

C TOTAL C = Total of (C.1 to C.6) (15,609,924) (13,964,624) (1,645,300)

D RELEASE AMOUNT

D.1 Release Mild Stone/EOT by MPRDC,Bhopal 8,607,323 8,607,323 -

D.2 Excees M-20 Qty Release By Mprdc,Bhopal 448,221 448,221 -

D.3 Excees M-25 Qty Release By Mprdc,Bhopal 4,399,661 4,399,661 -

D.4 Excees Qty Release By Mprdc,Bhopal 1,141,693 1,141,693 -


Release IPC-06 Amount(10 % Excees Qty
D.5
Amount ) By Mprdc,Bhopal
8,087,119 8,087,119 -

D.6 Release CGST & SGST @ 12.00% 33,980,491 33,980,491 -

D TOTAL D = Total of (D.1 TO D.6) 56,664,508 56,664,508 -

NET AMOUNT = (A + B+ C + D ) 303,519,088 271,799,574 31,719,513


MADHYA PRADESH ROADS DEVELOPMENT CORPORATION LIMITED
NAME OF WORK :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
CONTRACTOR : M/s Shiv Shakti Construction Co.Satna
CONSULTANT : M/s Lion Engineering Consultants.,In ( JV) With Technogem Consultants Pvt.ltd.,

ABSTRACT
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Bill No.2 : SITE CLEARANCE
Cutting of trees including cutting of trunks
branches and removal of stumps, roots
stacking of serviceable material with all leads
2.01 and lifts and earth filling in the
depression /pit as per Technical
Specification relevant clauses of section-200

( i ) Girth from 300 mm to 600 mm Each 193.00 88.00 16984.00 - - - - - - - -


(ii) Grith from 600 mm to 900 mm Each 348.00 37.00 12876.00 - - - - - - - -
(iii)Grith from 900 mm to 1800 mm Each 671.00 15.00 10065.00 - - - - - - - -
(IV)Grith from 900 mm to 1800 mm Each 1267.00 7.00 8869.00 - - - - - - - -
Clearing and Grubbing Road Land Clearing
and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs,
saplings and trees girth up to 300 mm,
removal of stumps of trees cut earlier and
2.2(a) disposal of
Hectar 39368.00 15.66 616502.88 15.66 616502.88 15.66 616534.97 13.52 532149.24 2.14 84,385.73
unserviceable materials and stacking of e
serviceable material to be used or auctioned
up to a lead of 1000 metres including
removal and disposal of top organic soil not
exceeding 150 mm in thickness.
Dismantling of Structures Dismantling of
existing structures like culverts, bridges,
retaining walls and other structure
comprising of masonry, cement concrete,
wood work, steel work, including T&P and
2.3(i) scaffolding wherever necessary, sorting the
dismantled material, disposal of
unserviceable material and stacking the
serviceable material with all lifts and lead of
1000 metres
Lime Concrete, cement concrete grade M-10
(a) and below
Cum 290.00 24.14 7000.60 24.14 7000.60 58.73 17030.25 58.73 17030.25 - -

(b) Cement Concrete Grade M-15 & M-20 Cum 342.00 41.40 14158.80 188.53 64477.26 188.53 64475.69 98.88 33815.59 89.65 30,660.09
Prestressed / Reinforced cement concrete
(C ) grade M-20 & above
Cum 886.00 88.95 78809.70 251.86 223147.96 251.81 223103.66 186.38 165132.68 65.43 57,970.98

2.3(iii) D (d) Dry rubble masonry Cum 176.00 490.28 86289.28 650.08 114414.08 650.16 114428.16 331.92 58417.92 318.24 56,010.24
Clearing and Grubbing Road Land Clearing
and grubbing road land including uprooting
rank vegetation, grass, bushes, shrubs,
saplings and trees girth up to 300 mm,
removal of stumps of trees cut earlier and
2.3(ix) disposal of
unserviceable materials and stacking of
serviceable material to be used or auctioned
up to a lead of 1000 metres including
removal and disposal of top organic soil not
exceeding 150 mm in thickness.
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
( c ) Above 900 mm
meter 312.00 8.10 2527.20 8.10 2527.20 8.10 2,527.20 - - 8.10 2,527.20
Dismantling of kilometre stone including
cutting of earth, foundation and disposal of
2.90
dismantled material with all lifts and lead
upto 1000 m and back filling of pit
(a) 5th Km stone
Each 277.00 2.00 554.00 2.00 554.00 2.00 554.00 2.00 554.00 - -
(b) Ordinary Km stone
Each 167.00 8.00 1336.00 8.00 1336.00 8.00 1336.00 8.00 1,336.00 - -
( c ) Hectometer Km stone
Each 33.00 40.00 1320.00 40.00 1320.00 40.00 1320.00 40.00 1,320.00 - -
( d ) Boundray stone
Each 32.00 100.00 3200.00 100.00 3200.00 100.00 3200.00 100.00 3,200.00 - -
TOTAL AMOUNT BILL NO.1 SITE
860492 1034480 1044510 812956 231554
CLEARANCE

BILL NO.2 : EARTH WORK


Excavation in Soil using Hydaulic
Excavator and Tippers with disposal up to
1000 metres.Excavations of existing road,
embankment, shoulders. Ground and
cement concrete drains to designated widths
and depths for the purpose of drain,
pavement construction,trimming of bottom
3.30 and side slopes in accordance with
requirements of lines, grades and cross
Sections, rolling of bed/ground including
loosening and recompaction if required and
disposal of suitable /surplus and unsuitable
material through all leads and lifts as per
relevant clauses of section 300.

(a) In all types of soil Cum 45.00 181592.50 8171662.50 181592.50 8171662.50 168445.76 7580059.20 142891.15 6430101.85 25,554.61 1,149,957.35
Construction fo Embankment with
Material Deposited from Roadway Cutting.
Construction fo embankment/sub grade/
earthen shoulders with approved materials
obtained from borrow pits with all lifts &
3.10 leads including excavation,transporting to
site spreading, grading to required level &
camber and compacting using vIbratory
roller to meet requirement of table no. 300-1,
300-2 and as per relevant clauses of section
300 & 400.

(a) Earth with CBR more than 7% Cum 144.00 70290.22 10121791.68 70290.22 10121791.68 67206.44 9677727.03 57093.06 8221401.29 10113.37 1456325.74
Construction of Shoulders with approved
material /selected soil i/c excavation all lifts
& leads i/c grading to required slope &
4.13 camber of 4% and compacting using Cum 181.00 10806.99 1956065.19 10806.99 1956065.19 6967.96 1261201.00 5567.85 1007781.30 1,400.11 253,419.70
vibratory roller of 80 to 100 kN Static weight
to meet requirement as per relevant clause of
400. B.Hard Shoulders (CBR value>12)
Construction of median and Island above
road level with approved material brought
4.15 Cum 136.00 2293.50 311916.00 2293.50 311916.00 1641.59 223256.31 1641.59 223256.31 0.00 0.00
from borrow pits, spread, sloped and
compacted as per clause 408 of specification.
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Construction of unlined surface drain of
average cross sectinal area 0.4 sqm. In all
type of soil to specified lines, grades , levels &
3.13 dimentions to the requirement of clause 301 Metre 41.00 10438.00 427958.00 10438.00 427958.00 - - - - - -
& 309 .Excavated material to be uesd in
embankment within a lead of 50 metres as
per relevant clauses of section-300
TOTAL AMOUNT BILL NO.2 EARTHWORK
20989393 20989393 18742244 15882541 2859703
BILL NO.3 : SUB BASE & BASE COURSE

Granular Sub -base with Well Graded


Material (CBR>30 or more) (Table:-400-1
&Table:-400-2) Construction of granular
sub-base by providing close/ coarse graded
crushed material, spreading in uniform
4.01 layers on prepared surface and compacting
Cum 764.00 35542.40 27154393.60 35542.40 27154393.60 35063.57 26788564.32 30117.74 23009953.32 4945.83 3778611.00
at OMC with vibratory roller to achieve the
desired density, complete in all respect as
per drawing & relevant clauses of section-
401
Wet Mix Macadam Providing laying,
spreading and compacting grades stone
aggregate to wet mix macadam specification
including permixing the material with water
at OMC in mechanical mix plant, carriage of
mixed material by tipper to site,laying in
4.11 uniform layerscwith paver in sub-base/ base
Cum 1261.00 26125.74 32944558.14 26125.74 32944558.14 25868.05 32619606.48 22734.12 28667721.06 3133.93 3951885.41
course on well prepared surface and
compacting with vibratory roller to achieve
the desired density in accordance to Table No
400-12,400-13 and as per clause of section
406 of specifications.
Footpaths and Separators Construction of
footpath/ separator by providing a 150 mm
compacted granular sub base as per clause
401 and 25 mm thick cement concrete grade
4.17 M15, over laid with precast concrete tiles
Cum 431.00 18647.55 8037094.05 - - - - - - - -
in cement mortar 1:3 including provision of
all drainage arrangements but excluding
kerb channel
TOTAL AMOUNT BILL NO.3 SUB
68136046 60098952 59408171 51677674 7730496
BASE & BASE COURSE
BILL NO.4 : PAVEMENT
Prime Coat Providing and applying primer
coat with bitumen emulsion on prepared
surface of granular base with low porosity
(WMM or WBM) including clearing of road
5.1 surface and spraying primer at the rate of
Sqm 32.00 103709.23 3318695.36 103709.23 3318695.36 84038.73 2689239.20 83901.23 2684839.20 137.50 4400.00
0.72 kg/sqm with pressure distributor and
as per relevant clause of section -500

Providing and applying tack coat with


bitumen emulsion using emulsion pressure
distributor on the prepared
5.2 bituminous/granular surface cleaned with
machanical broom and as per relevant
clauses of section -500
(i) 0.25 kg per sqm (normaal bituminous
Sqm 12.00 102391.44 1228697.28 102391.44 1228697.28 124097.34 1489168.02 122267.33 1467207.90 1830.01 21960.12
surfaces )
(ii) 0.30 kg per sqm (dry & hungry
bituminous surfaces/granular surfaces Sqm 14.00 169047.14 2366659.96 169047.14 2366659.96 84038.73 1176542.15 83901.23 1174617.15 137.50 1925.00
trated with primer)
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Dense Graded Bituminous Macadam
Providing and laying dense bituminous
macadam with hot mix plant using crushed
aggregates of specified grading, premixed
with bituminous binder,4.0 to 4.5 % by
weight of total mix of mix and filler,
transporting the hot mix to work site, laying
5.5(a) with sensor paver finisher to the required
grade, level and alignment, rolling with
smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction
complete in all respects and as per relevant
clauses of section-505 (only cement will be
used as filler.) for GradingII(19 mm nominal
size)

(ii)for GradingII(19 mm nominal size) Cum 6640.00 7167.40 47591536.00 7167.40 47591536.00 5882.71 39061199.38 5873.09 38997289.38 9.63 63910.00
Bituminous Cnoncrete Providing and
laying bituminous cnoncrete with hot mix
plant using crushed aggregates of specified
grading, premixed with bituminous binder,
@5.4 to 5.6% of mix and filler, transporting
the hot mix to work site , laying with a
5.6(a) sensor paver finisher to the required grade ,
level and alignment, rolling with smooth
wheelled, vibratory and tandem rollers to
achieve the desired compaction in all
respects and as per relevant clauses of
section-500 (only cement will be used as
filller).
(iv) For grading -II (30-35mm thickness) with
Cum 7669.00 6087.45 46684654.05 6087.45 46684654.05 4413.20 33844867.23 4340.90 33290398.53 72.30 554468.70
60/70 bitumen (VG-30)
Mastic Asphalt Providing and laying 25 mm
thick mastic asphalt wearing course with
paving grade bitumen meeting the
requirements given in table 500-39, prepared
by using mastic cooker and laid to required
level and slope after cleaning the surface,
including providing antiskid surface with
bitumen precoated fine-grained hard stone
5.11 chipping of 13.2 mm nominal size at the rate
Sqm 543.00 1529.25 830382.75 - - - - - - - -
of 0.005cum per 10 sqm and at an
approximate spacing of 10 cm center to
center in both directions, pressed into
surface when the temperature of surfaces not
less than 1000C, protruding 1 mm to 4 mm
over mastic surface, all complete as per
clause 516 of specification
TOTAL AMOUNT BILL NO.4
PAVEMENT 102020625 101190243 78261016 77614352 646664
BILL NO.5 : CROSS DRAINAGE

Earth work in excavation of foundation of


structures as per drawing and technical
specification, for all depths in all types of
soil/rock including setting out , construction
of shoring and bracing , dresssing of sides
12.1 and bottom, back filling with approved
material etc. within all leads and lifts
complete and as per relevant clauses of
section 300 and 2100 of MORT&H
specification.

(i) In all types of soils Cum 52.00 30473.17 1584604.84 36746.61 1910823.72 36441.62 1894964.01 34906.53 1815139.42 1535.09 79824.59
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Providing and laying in position plain cement
cocrete of grade M-15 in levelling courses
below open foundation , pile caps, approach
slabs, retaining walls , return walls / wing
12.3 wall, cut off wall, CC drain and inspection Cum 4299.00 2841.05 12213673.95 2958.00 12716442.00 2800.45 12039142.61 2527.16 10864246.55 273.30 1174896.06
ladders etc. complete as per drawing and
relevant clauses of section
100,1500,1700,2100 & 2700 (including cost
of all types of formwork).
Providing and laying plain cement concrete
for foundation and substructure of
abutment, piers, retaining wall, wing wall,
head wall of HP CD's, pillar , guard wall and
CC drain etc. excluding cost of skin
12.8 reinforcement, but Including treatment of
joints between existing & new structures
with all leads and lifts as per drawings and
relevant clauses of sections 1500,
1700,2100,2200,and 2900 (including cost of
all types of formworks).
(i) PCC grade M20
B Cum 5025.00 572.00 2874300.00 2657.71 13354992.75 2432.74 12224510.23 2320.57 11660860.00 112.17 563650.23
RCC grade M30
G Cum 5337.00 277.26 1479736.62 565.00 3015405.00 297.02 1585214.42 297.02 1585214.42 0.00 0.00
Supplying fitting and placing un-coated Mild

steel reinforcement complete in foundation


12.31 MT 49081.00 30.50 1496970.50 51.70 2537487.70 34.97 1716558.89 29.41 1443467.07 5.56 273091.82
as per drawing and technical specification

and as per relevant clauses of section 1600


Plain Reinforced cement concrete in sub-
13.6 structure complete as per drawing and
technical specifications
RCC Grade M25
F Cum 5972.00 7749.49 46279954.28 9678.75 57801495.00 9644.33 57595917.86 8643.50 51618961.10 1,000.83 5,976,956.76
RCC Grade M30
G Cum 5999.00 2246.56 13477113.44 2246.56 13477113.44 2246.56 13477130.62 2246.56 13477130.62 - -
Supplying fitting and placing HYSD bar
reinforcement in substructure complete as
13.7 per drawing and technical specifications and
MT 48936.00 827.18 40478880.48 645.00 31563720.00 617.10 30198462.63 568.80 27834592.26 48.31 2,363,870.37
as per relevant clause of section 1600
Providing weep holes in Brick
masonry/Plain/Reinforced concrete
abutment, wing wall/return wall with 100
13.9 mm dia AC/PVC pipe, extending through the RM 173.00 651.88 112775.24 666.90 115373.70 697.48 120663.35 697.48 120663.35 0.00 0.00
full width of the structure with slope of 1V :
20H towards drawing foce. Complete as per
drawing and Technical specifications
Back filling behind abutment, wing wall and
return wall complete as per drawing and
13.10 Technical specification and as per relevant
clauses 305 of specifications and as per
appendix 6 of IRC-78.

A Granular material Cum 880.00 3122.94 2748187.20 3122.94 2748187.20 3121.93 2747300.51 1704.09 1499596.74 1,417.85 1,247,703.78
Providing and laying of Filter media with
granular materials/stone crushed aggregates
satisfying the requirements laid down in
clause 2504.2.2 of MoRTH specifications to a
thickness of not less than 600 mm with
13.11 smaller size towards the soil and bigger size Cum 1117.00 399.78 446554.26 399.78 446554.26 364.44 407074.12 149.06 166504.49 215.37 240,569.63
towards the wall and provided over the entire
surface behind abutment, wing wall and
return wall to the full height compacted to a
firm condition complete as per drawing
and technical specification.
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Providing and fixing in position bituminous
13.16 paper bearing for slabs as per approved Sqm 43.00 70.20 3018.60 70.20 3018.60 52.80 2270.40 52.80 2270.40 - -
drawing and confirming to IS:1398
PCC M-15 in Foundation Plain cement
concrete M-15 mix with crushed stone
aggregate 40 mm nominal size mechanically
9.10 mixed, placed in foundation and compacted Cum 3409.00 2.69 9170.21 2.69 9170.21 - - - - - -
by vibration including curing for 14 days. as
per
MORT&H Specification 409
Furnishing and Placing
Reinforced/Prestressed cement concrete in
14.01 super-structure as per drawing and
Technical Specification and as per relevant
clauses of sections 1500, 1700 and 2300 in

C RCC Grade M 30 Cum 6458.00 24.24 156541.92 24.24 156541.92 - - - - - -


Supplying fitting and placing HYSD bar

reinforcement in superstructure complete as


14.02 MT 50028.00 1.45 72540.60 1.45 72540.60 - - - - - -
per drawing and technical specifications as

per relevant clauses of section 1600


Construction of RCC railing of M30 Grade in-
situ with 20 mm nominal size aggregate, true
to line and grade, tolurence of vertical RCC
post not to exceed 1 in 500, centre to centre
spacing between vertical post not to exceed
2000 mm, leaving adequate space between
14.7 vertical post for expansion, complete as per
RM 1867.00 259.10 483739.70 259.10 483739.70 - - - - - -
approved drawings and technical
specifications and as per relevant clauses of
sections 1500, 1600, 1700 and clause 2703
of specifications (as per MoST specification
drawing SD/201 or SD/304)
Drainage Spouts complete as per drawing
14.9 and Technical specification and as per clause No 1194.00 34.00 40596.00 48.00 57312.00 44.00 52536.00 44.00 52536.00 0.00 0.00
2705 of specifications
PCC - M-15 grade leveling corce blow
approch Salab compacte as per drowing and
14.10 techanical specfaction and as per relvent
Cum 4397.00 122.85 540171.45 140.00 615580.00 108.22 475825.75 58.32 256433.04 49.90 219,392.71
clouse of saction 1700
Reinforced cement concrete approach slab
(Grade of concrere M 30) including
reinforcement and formwork complete as per
14.11 drawing and Technical specification and as
Cum 7970.00 245.70 1958229.00 260.00 2072200.00 210.00 1673700.00 113.40 903798.00 96.60 769,902.00
per relevant clauses of section 1500, 1600,
1700 and clause 2704 of specifications
Filler joint Providing & fixing 20 mm thick
compressible fibre board in expansion joint
14.16.(ii) complete as per drawing & Technical
meter 377.00 111.46 42020.42 111.46 42020.42 96.00 36192.00 96.00 36192.00 - -
Specification.
Providing and laying Pitching on slopes laid
over prepared filter media including boulder
15.4(a) apron laid dry in front of toe of embankment Cum 2033.00 393.08 799131.64 393.08 799131.64 392.06 797,053.91 - - 392.06 797,053.91
complete as per drawing and Technical
specifications
Providing and laying Filter material
15.5 Cum 1265.00 192.22 243158.30 192.22 243158.30 192.17 243,090.62 - - 192.17 243,090.62
underneath pitching in slopes
Providing and laying Flooring complete as per
15.8
drawing and Technical

C Cement Concrete Grade M15 Cum 4572.00 540.81 2472583.32 540.81 2472583.32 15.36 70,225.92 - - 15.36 70,225.92
Flexible Apron :Construction of flexible apron
1 m thick comprising of loose stone boulders
15.11 weighing not less than 40 kg beyond curtain
Cum 2089.00 1324.35 2766567.15 1324.35 2766567.15 119.16 248,925.24 - - 119.16 248,925.24
wall.
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
TOTAL AMOUNT BILL NO. 5 CROSS
DRAINGE 132780219 149481159 137606759 123337605 14269154
BILL No.6 TRAFFIC SIGNS, MARKINGS
AND ROAD APPURTENANCES

Cast in Situ Cement Concrete M20


kerb Construction of cement concrete
kerb with top and bottom width 115
and 165 mm respectively, 250 mm
high in M 20 grade PCC on M-10
8.1 grade foundation 150 mm thick,
undation having 50 mm projection
beyond kerb stone, kerb stone laid
with kerb laying machine, foundation
concrete laid manually, all complete as
per
Using Concrete Batching and Mixing Plant
B meter 206.00 18348.00 3779688.00 18348.00 3779688.00 12977.00 2673262.00 12977.00 2673262.00 0.00 0.00
Providing and fixing of retro -reflectorised
cautionary , mandatory and infromatory sing
as per IRC :67 made of encapsulate lens type
reflective vide clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported
on mild steel angle iron post 75mm x 6mm
(height from crown level of the road adn
8.3
bottom of the sign board shall not be less
than 1.5mm) firmly fixed to the ground by
means of properly designed foundation with
m15 grade cement concrete 45 cm x 45 cm x
60 cm below ground level as per approved
drawing including painting of vertical post as
per technical specification section 800.
90cm equilateral tiangle cautionary/warining
(i) Each 3291.00 76.00 250116.00 76.00 250116.00 76.00 250116.00 76.00 250116.00 0.00 0.00
sign
60 cm equilateral triangle
(ii) Each 2340.00 68.00 159120.00 68.00 159120.00 68.00 159120.00 2.00 4680.00 66.00 154440.00
60 cm circular
(iii) Each 2962.00 8.00 23696.00 8.00 23696.00 8.00 23696.00 8.00 23696.00 0.00 0.00
80 mm x 60 mm rectangular
(iv) Each 3928.00 8.00 31424.00 8.00 31424.00 8.00 31424.00 8.00 31424.00 0.00 0.00
60cm x 45cm rectangulat informatory signs
(v) Each 2899.00 189.00 547911.00 189.00 547911.00 189.00 547911.00 96.00 278304.00 93.00 269607.00
Providing and erecting direction and place
identification signs upto 0.9 sqm size board.
(providing and erecting direction and place
identification retro-reflectorised sign as per
IRC: 67 made of encapsulated lens type
reflective sheeting vide clause 801.3 fixed
over aluminium sheeting, 2 mm thick with
area not exceeding 0.9 sqm supported on a
8.5 mild steel single angle iron post 75 x 75 x 6 Sqm 6641.00 4.50 29884.50 4.50 29884.50 - - - - - -
mm (height from crown level of the road and
bottom of the sign board shall not be less
than 1.5 mm) firmly fixed to the ground by
means of properly designed foundation with
M15 grade vement concrete 45 x 45 x 60 cm,
90 cm, below ground level as [er approved
drawing including painting of vertical post as
per specification.
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Painting Two Coats on New Concrete
SurfacesPainting two coats after filling the
8.11 surface with synthetic enamel paint in all
Sqm 48.00 5105.00 245040.00 5105.00 245040.00 2,010.40 96,499.20 - - 2,010.40 96,499.20
shades on new plastered concrete surfa
Road Marking with Hot Applied
Thermoplastic Compound with
Reflectorising Glass Beads on Bituminous
Surface providing and laying of hot applied
theromoplastic compound 2.5 mm thick
8.15 including reflectorising glass beads @ 250 Sqm 516.00 796.00 410736.00 796.00 410736.00 - - - - - -
gms per sqm area , thickness of 2.5 mm is
exclusive of surface applied glass beds as per
IRC :35 the finished surfave to be level ,
uniform and as per relevant claused os
section-803 of specifications
Providing Reinforced cement concrete M15
grade kilometre stone of standard design as
8.16 per IRC:8-1980, fixing in position including
painting and printing etc as per relevant
claused oa section 800 of specifications.
5th kilometre stone (precast)
(i) Each 2791.00 4.00 11164.00 4.00 11164.00 4.00 11,164.00 - - 4.00 11,164.00
Ordinary Kilometer stone (Precast)
(ii) Each 1681.00 16.00 26896.00 16.00 26896.00 16.00 26,896.00 - - 16.00 26,896.00
Hectometer stone (Precast)
(iii) Each 495.00 80.00 39600.00 80.00 39600.00 80.00 39,600.00 - - 80.00 39,600.00
Road delineatror (supplying and installation
of delineators (raod way indicatores, hazard
markers, object markers), 80-100 cm high
above ground level, painted black and white
in 15 cm wide stripes, fittes with 80 x 100
8.17 mm rectangular or 75 m dia circular
Each 224.00 1360.00 304640.00 1360.00 304640.00 - - - - - -
reflectorised panels at the top,buried or
pressed into the ground and confirming to
IRC-79 and the drawings as per relevant
clauses of section -800 of specifications.
Boundry pillar Providing and fixing in
position reinforced cement concrete M-15
grade boundary pillars of standard design as
8.18 per IRC :25-1967, including
Each 448.00 80.00 35840.00 80.00 35840.00 - - - - - -
finidhing,painting and lettering etc.
complete.
Reinforced Cement Concrete Crash
Barrier Provision of an Reinforced cement
concrete crash barrier at the edges of the
road, approaches to bridge structures and
medians, constructed with M-20 grade
concrete with HYSD reinforcement
conforming to IRC:21 and dowel bars 25 mm
dia, 450 mm long at expansion joints filled
8.24(i) with pre-moulded asphalt filler board, keyed
RM 2795.00 268.70 751016.50 268.70 751016.50 231.40 646763.00 21.60 60372.00 209.80 586,391.00
to the structure on which it is built and
installed as per design given in the enclosure
to MOST circular No. RW/NH - 33022/1/94-
DO III dated 24 June 1994 as per
dimensions in the approved drawing and at
locations directed by the Engineer, all as
specified
Type-a ,"W" : Metal beam crash barrier
8.25
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
Type-a ,"W" : metal beam crash barrier
(providing and erecting a "W" metal beam
crash barrier comprising of 3 m thick
corrugated sheet metal beam rail , 70cm
above road /ground level ,fixed on ISMC
series channel vertical post, 150 x 75 x 5mm
spaced 2m centre to centre , 1.8 m high ,1.1
a) m below ground/road level ,all steel parts Meter 3406.00 320.00 1089920.00 320.00 1089920.00 320.00 1,089,920.00 - - 320.00 1,089,920.00
and fitments to be galvanised by hot dip
process, all fittings to conform to IS :1367
and IS :1364, metal beam rail to be fixed on
the vertical post with a spacer of channal
section of channel section 150 x 75 x 5mm ,
330mm long complete as per clause 810 of
specifications.
Road marking with lense reflector (providing
and fixing of road stud 100 x 100 mm die
cast in aluminium, resistant to corrosive
effect of salt and grit , fitted with lense
8.28 reflectors, installed in concrete or asphaltic Each 545.00 1985.00 1081825.00 1985.00 1081825.00 - - - - - -
surace by drilling hole 30 mm upto a depth
of 60mm and bedded in a suitable bitumious
grout or epoxy mortar, all as per BS 873 part
4:1973)
Supply And Fixing tubuler gantry mountad
overhed/cantlrvre sings. All componant of
sing & supportother then the reflective point
shall be with two cost of opoxy points.The
sing back side shall be with gray collor and
post shall be in back &white alternet band.
the post blow ground shall be pointed with
MPRDC there cost of red lead point. the sing shall be
Approved med as per IRC-67-2012 and technical tonnes 74636.00 3.00 223908.00 3.00 223908.00 - - - - - -
in ADB-V specification section 800.Erection of overhed
gantry/cantiliver structure as per drowing
incloding steel work in trussses steel tube
cutting fixing and pointing with weiding and
bolted completed and all respect and tye as
per structure desgin requriment and
approved place incloding cost of excavation
concret and steel for foundation.
Supply And Fixing tubuler gantry
mountad overhed/cantlrvre sings. All
componant of sing & supportother then the
reflective point shall be with two cost of
opoxy points.The sing back side shall be with
gray collor and post shall be in back &white
alternet band. the post blow ground shall be
pointed with there cost of red lead point. the
sing shall be med as per IRC-67-2012 and
technical specification section 800. the sing
MPRDC
bound made out of 2 mm thick allumineam
Approved sheet face to be fully coverd by higt insity
Sqm 7679.00 23.12 177538.48 23.12 177538.48 - - - - - -
in ADB-V grade witech ratro reflective sheeting of
encapsulted len typ. the backgroung simples
arrow shall be madeby transparent over lay
film of desird collor as per sing detel accapet
those in block which shall be of non reflective
type. the singal place shall be fix whith 6 mm
dia allunimum rebet on MS angal iron from.
the angle from shall be med with
addinotional bracing at every 600 mm c/c if
any dimcnsion in mor then 1200 mm.
TOTAL AMOUNT BILL NO. 6
TRAFFIC SIGNS, MARKINGS AND
ROAD APPURTENANCES CARRIED 9219963 9219963 5596371 3321854 2274517
TO SUMMARY
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
BILL NO.7 MISCELLANEOUS
Providing and laying utility duct of 300 mm
dia NP-4 pipe in urban/ rural areas as per
8.27 technical specification section 2900 and as
directed by the engineer.

Singal Row for one utility service Meter 1456.00 2825.00 4113200.00 2825.00 4113200.00 2825.00 4113200.00 2535.00 3690960.00 290.00 422240.00
Laying Reinforced Cement Concrete Pipe

NP4/prestrssed Providing and Laying Reinforced

cement concrete pipe NP4/prestrssed concrete


pipe for culverts on first class bedding of

9.2 (b) granular material (cost of bedding included) Meter 7713.00 25.00 192825.00 - - - - - -
in single row including fixing collar with
cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and
masonry works in head walls and parapets
Providing painting, figuring and
10.11(i) Each 100.00 10.00 1000.00 10.00 1000.00 0.00 0.00 0.00 0.00
numbering to culvert upto 6m.
Providing painting, figuring and numbering
10.12(ii) Each 132.00 4.00 528.00 4.00 528.00 0.00 0.00 0.00 0.00
to minor bridges
Planting of Trees and their Maintenance for
one year Planting of Trees by the road side
(Avenue Trees) in 0.60m of holes, 1 m deep
11.2 dug in the ground , mixing the solid with Each 570.00 1470.00 837900.00 1470.00 837900.00 152.00 86640.00 0.00 0.00 152.00 86,640.00
decayed farm yard/sludge mannure, planting
the saplings , backfilling the trench, watering
and maintaining the plants for one year
Half Brick Circular Tree Guard in 2nd class
Brick, internal diametre 1.25 metres, and
height 1.2 metres, above ground and 0.20
metre below ground Half brick circular tree
guard, in 2nd class brick, internal diametre
11.3 1.25 metres, and height 1.2 metres, above Each 1940.00 1470.00 2851800.00 1470.00 2851800.00 152.00 294880.00 0.00 0.00 152.00 294,880.00
ground and 0.20 metre below ground, bottom
two courses laid dry, and top three courses
in cement mortar 1:6 ( 1 cement 6 sand) and
the intermediate courses being in dry honey
comb masonry, as per design complete
TOTAL AMOUNT BILL NO. 7
Item Coad MISCLLANEOUS 7997253 7804428 4494720 3690960 803760

Bill No.8 Electrical Works

H-Beam 152x152 MM 37.1 KG/Mtr

12202002 13 Meter Long NO. 20829 314 6540306 314 6540306 311 6477819 227 4728183 84.00 1,749,636.00
12202003 11 Mtr Long NO. 17626 136 2397136 136 2397136 109 1921234 50 881300 59.00 1,039,934.00
12203002 RS Joist 9.3 Mtr Long NO. 7836 228 1786608 228 1786608 228 1786608 228 1786608 - -
12206004 Arial Bunch Cable 3x95 KM. 218046 8 1744368 8 1744368 8 1744368 8 1744368 - -
11302004 Tension Clamp For Dead End NO. 553 198 109494 198 109494 198 109494 198 109494 - -
11302001 Suspension Clamp For LT Cable NO. 287 198 56826 198 56826 198 56826 198 56826 - -
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount

11303003 Piercing Connector Type II No. 47 324 15228 324 15228 324 15228 324 15228 - -
12144001 33 KV V- Cross Arm NO. 1133 423 479259 423 479259 423 479259 409 463397 14.00 15,862.00
12146002 33 KV Top Clamp NO. 165 147 24255 147 24255 147 24255 147 24255 - -
12144003 11 KV V-Cross Arm NO. 568 46 26128 46 26128 46 26128 46 26128 - -
12146003 11 KV Top Clamp NO. 138 46 6348 46 6348 46 6348 46 6348 - -
12401003 33 KV Polymer Insulator NO. 381 933 355473 933 355473 933 355473 933 355473 - -
12151005 D.C Cross Arm 5’ Channel SET 2998 32 95936 32 95936 32 95936 32 95936 - -
12151001 D.C Cross Arm 4’ Channel SET 2459 12 29508 12 29508 19 46721 19 46721 - -
12151006 D.C Cross Arm 8’ Channel SET 2594 42 108948 42 108948 42 108948 42 108948 - -
12167007 Stay Set Complete 20MM NO. 741 134 99294 134 99294 130 96330 120 88920 10.00 7,410.00
12167001 Stay Set Complete 16MM NO. 394 276 108744 276 108744 205 80770 170 66980 35.00 13,790.00
11102003 AAAC Daag Conductor KM 47944 59.71 2862497 59.71 2862497 59.70 2862257 59.70 2862257 - -
12402004 33 KV Polymer Disc With Hardware NO. 276 212 58512 212 58512 212 58512 212 58512 - -
12402006 11 KV Polymer Disc With Hardware NO. 138 126 17388 126 17388 126 17388 126 17388 - -
12401004 11KV Polymer Insulator NO. 167 282 47094 282 47094 282 47094 282 47094 - -
12502277 Nut Bolt KG. 65 1522.12 98938 1522.12 98938 1522.12 98938 1522.12 98938 - -
12123002 Earthing Coil NO. 104 335 34840 335 34840 335 34840 335 34840 - -
19132009 Concreting CMT. 4145 360.96 1496179 360.96 1496179 360.96 1496179 360.96 1496179 - -
17115001 Red Oxide Paint LTR. 113 327.10 36962 327.10 36962 325 36725 325 36725 - -
17115002 Aluminium Paint LTR. 235 319.90 75177 319.90 75177 319.90 75177 319.90 75177 - -
12167020 H-Beam Clamp NO. 224 415 92960 415 92960 415 92960 415 92960 - -
12147013 RS Joist Clamp SET. 133 118 15694 118 15694 118 15694 118 15694 - -
12147003 Back Clamp SET. 145 1061 153845 1061 153845 940 136300 820 118900 120.00 17,400.00
12109003 Jointing Sleeves NO. 129 239 30831 239 30831 239 30831 239 30831 - -
12113001 Aluminium Binding Wire & Tape NO. 280 128.30 35924 128.30 35924 128.30 35924 128.30 35924 - -
Stone block/Rcc Base Plate Size
12207014
450x450x75MM NO. 257 42 10794 42 10794 42 10794 42 10794 - -
11303002 Piercing Connector Type I NO. 79 594 46926 594 46926 594 46926 594 46926 - -
12114001 Stay Wire 33 KV 7/4.00 MM KG. 57.99 1128.80 65459 1128.80 65459 1078 62513 1008 58454 70.00 4,059.30

12114002 Stay Wire 11 KV 7/3.00 MM KG. 58.19 1645.80 95769 1645.80 95769 1520 88449 1240 72156 280.00 16,293.20
Spring loaded Busbar System
12130007 Suitable for 1 Incoming 6 Outgoing NO. 746 144 107424 144 107424 224 167104 224 167104 - -
1- Phase Circuit
Spring loaded Busbar System
12130004 Suitable for 1 Incoming 3 Outgoing NO. 1100 144 158400 144 158400 240 264000 240 264000 - -
3- Phase Circuit
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount

11102003 AAAC Raccoon Conductor Km. 38809 10.23 397016 10.23 397016 10.23 397016 10.23 397016 - -

12154001 Galvanised DO Mounting Channel NO. 1240.66 36 44664 36 44664 36 44664 36 44664 - -

12126002 DO Fuse Unit Complete NO. 1179 48 56592 48 56592 45 53055 45 53055 - -
12141004 11 Kv LA Polymer Type NO. 1248 54 67392 54 67392 45 56160 45 56160 - -
12153001 Transformer Mounting Channel Set 2424 18 43632 18 43632 15 36360 15 36360 - -
12161001 Transformer Belting Set Set 1755 18 31590 18 31590 15 26325 15 26325 - -
11102004 AAAC Rabbit Conductor Km. 27305 48 1310640 48 1310640 0.45 12287 0.45 12287 - -

12154025 Distribution Box Mounting Channel Set. 892 18 16056 18 16056 15 13380 15 13380 - -
L.T Distribution Box For 100 KVA
12132003 Transformer NO. 17198 16 275168 16 275168 15 257970 15 257970 - -
XLPE LT 1-Core Aluminium
11203007 Unarmoured 70 Sqmm Cable Km. 46391 128 5938048 128 5938048 0.80 37113 0.80 37113 - -

XLPE LT 1-Core Aluminium


11203004
Unarmoured 150 Sqmm Cable Km. 94053 0.80 75242 80 7524240 0.60 56432 0.60 56432 - -

11 Kv AB Switch Three Phase 600


12138002 AMP TP Gang Operated Set. 5442 23 125166 23 125166 15 81630 15 81630 - -

LT Trivector Energy Meter,DLMS


14102008
Complaint Category NO. 11973 10 119730 10 119730 10 119730 10 119730 - -

12152001 Transformer Clamping Set Set. 1755 12 21060 12 21060 12 21060 12 21060 - -
12123004 GI Earthing Rod 20 MM Dia NO. 1500 102 153000 102 153000 45 67500 45 67500 - -
12107002 33 KV Strain Hardware NO. 171 212 36252 212 36252 212 36252 212 36252 - -
12107001 11 Kv strain Hardware NO. 83 126 10458 126 10458 126 10458 126 10458 - -
12202001 15 Meter Long NO. 28011 10 280110 10 280110 0 0 0.00 0 - -
XLPE CABLE 33 KV ARMOURED
11201006
3X300 SQMM KM. 1528681 0.60 917209 0.60 917209 0.55 839246 0.46 701665 0.09 137,581.29
XLPE CABLE 11 KV ARMOURED
11202003
3X185 SQMM
KM. 734019 0.60 440411 0.60 440411 0.60 440411 0.60 440411 - -

12117004 GI PIPE 150 MM A GRADE meter 1007 98.00 98686 98.00 98686 72.00 72504 - - 72.00 72,504.00
HEAT SHRINKABLE CABLE JOINTING
KIT WITH LUGS FOR 33 KV GRADE
11301048 XLPE CABLE 400 SQAS set 35084 4.00 140336 4.00 140336 4.00 140336 - - 4.00 140,336.00
EARTHING SETFOR 3 CORE
(DTR EARTHING)
PER CIRCULARMM NO 1516 DATED
12123003 17.03.08 (EARTHING SET 40MM , 3 set 4697 4.00 18788 4.00 18788 2.00 9394 - - 2.00 9,394.00
METER GI PIPE , GI WIRE, EARTHING
CLMAP AND NUT BOLT)
12117005 GI PIPE 150 MM B GRADE meter 1200 750.00 900000 750.00 900000 640.00 768000 - - 640.00 768,000.00
OUTDOOR HEAT SHRINKABLE CABLE
JOINTING KIT WITH LUGS FOR 33 KV
11301018
GRADE XLPE CABLE FOR 3 CORE 300
NO. 28386 8.00 227088 8.00 227088 8.00 227088 - - 8.00 227,088.00
SQ MM
12115002 G.I. WIRES 5.0 MM. (6 SWG) KG. 56 60.00 3341 60.00 3341 48.00 2673 - - 48.00 2,673.12
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount

33 KV ARIAL BUNCH CABLE 200


11204007
SQMM
meter 1181 20.00 23615 20.00 23615 20.00 23615 - - 20.00 23,614.80

12141002 33 KV LA Polimar NO. 2650 18.00 47700 18.00 47700 12.00 31800 - - 12.00 31,800.00

33 KV AB SWITCH 600 AMP TP


12137002 GANG OPERATED set 11701 8.00 93608 8.00 93608 5.00 58505 - - 5.00 58,505.00

Total Amount Electrical 31438070 23051313 18715432 4335881


Add Establishment Stove Contligencies And T&P
@7% 2200665 1613591.92 1310080.27 303,511.65

Add For Labour Charges for Erection @ 10 % 3143807 2305131.32 1871543.25 433,588.07

Add Tranportation Charges @ 4 % 1257523 922052.53 748617.30 173,435.23


TOTAL AMOUNT BILL NO. 8
38040065 27892089 22645673 5246416
ELECTRICAL
NON BOQ ITEMS
Dismantling of Flexible Pavements
Dismantling of flexible pavements and
Non BOQ disposal of dismantled materials up to
Items 2.40 a lead of 1000 metres, stacking
CUM 228.00 - - 1019.00 232332.00 525.48 119809.44 525.48 119809.44 0.00 0.00
serviceable and unserviceable
materials separately
Layning Rainforcment Cement
Concrete Pipe NP4/prestrssed
Concrete pipe on first class bedding in
singal row. Providing and laying
Reinforced cement concrete pipe
Non BOQ NP4 / prestrssed concrete pipe for
culvert on first class bedding of
Items grangular material ( cost of bedding
Meter 5668.00 - - 60.00 340080.00 42.50 240,890.00 - - 42.50 240,890.00
9.2(A) included ) in single row including
fixing collar with cement motar 1:2
but excluding excavation , protection
work , back filling , concrete and
masonary work in head walls and
parapets.1000 mm Dia .
Providing and laying Cement concrete
wearing coat M-30 grade including
Non BOQ reinforcement complete as per drawing
Items 14.4 and Technical Specifications and as CUM 10932.00 - - 91.82 1003776.24 91.54 1000720.75 70.47 770328.85 21.08 230391.90
per relevant clauses of sections 1500 ,
1700 and Clause 2702 of
specifications .RCC Grade M-30
Dry Lean Cement Concrete Sub- base
Construction of dry lean cement
concrete Sub- base over a prepared
Non BOQ sub-grade with coarse and fine
Items 6.1 aggregate conforming to IS: 383, the CUM 2199.00 - - 724.01 1592097.99 232.20 510,601.20 - - 232.20 510,601.20
size of coarse aggregate not exceeding
25 mm, aggregate cement ratio not to
exceed 15:1, aggregate gradation after
blending to be as per table 600-1,
Cement Concrete
cement content notPavement
to be less than
Construction
150 kg/ cum,of un-reinforced,
optimum moisture dowel
jointed, plain cement
content to be determined concrete
during trial
Non BOQ pavement M-40 grade concrete
length construction, concrete strength over a
Items 6.3 prepared sub than
base with cement , CUM 5153.00 - - 1371.75 7068627.75 713.12 3,674,712.51 - - 713.12 3,674,712.51
not to be less 10 Mpa at 7 days,
coarse in
mixed and fine aggregate
a batching plant,conforming
transported
to IS 383, maximum size
to site, laid with a paver withof coarse
aggregate
electronic not exceeding
sensor, 25 mm,
compacting withmixed
in
810a batching and mixing
tonnes vibratory plant
roller, as per
finishing
approved
and curingmix
as design, transported
per clause 601 of to
site, laid withcomplete
specification a fixed form orrespect
in all slip form
paver, spread, compacted and finished
in a continuous operation including
provision of contraction, expansion,
construction and longitudinal joints,
AS PER BOQ Approvd Vraration 1st UP TO DATE UP TO PREVIOUS THIS BILL
BOQ Item
DESCRIPTION UNIT RATE Remarks
No. QTY Amount QTY Amount QTY Amount QTY Amount QTY Amount
TOTAL AMOUNT BILL NO. 9
0.00 10236914 5546734 890138 4656596
NON BOQ ITEMS

TOTAL GROSS AMOUNT (BILL


380044057.3 360055531.8 338592613 299873754 38718859 A
NO. 01 TO 09 )

AMOUNT BELOW 5.57% 21168453.99 20055093

NET GROSS AMOUNT 358875603.3 340000438.7 338592613 299873754 38718859 Net


MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-2.3(i) B


Dismatling of exting structure like culvert bridges retaining wall and other structure comprisig of masonary cement cocrete wood work steel work inculiding T&P and
acffiolding wherever nessosry sorting the disnnsntled material disposel of uvervicable material and steacking the servicale material with all lift and lead of 1000 meter . dry
Cement Cocrete Grade - 15 & M-20
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Hight Qty. Remark
From To

1 STR/PMN/1616 2/Jul/19 Drain Dismentling for PCC Grade M15 Cum 9+650 9+830 L/S 1 180 1.000 0.15 27.04

2 STR/PMN/860 30/Jan/19 Drain Dismentling for PCC Grade M15 Cum 9+500 9+629 L/S 1 129 1.000 0.15 19.35

3 STR/PMN/229 24/Oct/18 Drain Dismentling for PCC Grade M15 Cum 6+434 6+439 L/S 1 5 2.700 0.15 2.03
Drain Dismentling for PCC Grade M15
4 STR/PMN/858 30/Jan/19 HPC 3+840 C/W 2 7 1.245 2.40 41.23

THIS BILL QTY 89.65


UP TO PREVIOUS QTY 98.88
UP TO DATE TOTAL QTY 188.53
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-2.3(i)C


Dismatling of exting structure like culvert bridges retaining wall and other structurecomprisig of masonary cement cocrete wood work steel work inculiding T&P and
acffiolding wherever nessosry sorting the disnnsntled material disposel of uvervicable material and steacking the servicale material with all lift and lead of 1000 meter .
Prestresed/ Raiforcement Cemet Concrete Grade M-15 & M - 20 Above.
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Hight Qty. Remark
From To
1 STR/PMN/1334 2/Apr/19 Structure Dismentlanig of slab Cum 9+340 C/W 1 8 4.000 0.40 12.80

2 STR/PMN/1413 22/Apr/19 Structure Dismentlanig of slab Cum 5+510 C/W 1 8 2.500 0.26 5.20
3 STR/PMN/1819 14/Nov/19 Structure Dismentlanig of slab Cum 5+150 C/W 1 9 8.300 0.50 37.35

4 STR/PMN/2120 15/Jun/20 RCC Road Dismentling Cum 1+690 1+695 R/S 1 5 7.000 0.27 9.45
RCC Road Dismentling Cum 1+680 1+687 R/S 1 7 0.300 0.30 0.63

THIS BILL QTY 65.43


UP TO PREVIOUS QTY 186.38
UP TO DATE TOTAL QTY 251.81
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-2.3(iii)D


Dismatling of exting structure like culvert bridges retaining wall and other structurecomprisig of masonary cement cocrete wood work steel work inculiding T&P and
acffiolding wherever nessosry sorting the disnnsntled material disposel of uvervicable material and steacking the servicale material with all lift and lead of 1000 meter .
dry rabble stone masonary.
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Hight Qty. Remark
From To

Structure Dismentling for Stone


STR/PMN/1333 2/Apr/19 Cum
Masonary wall
1 9+340 B/S 2 8.0 1.100 2.00 35.20
Structure Dismentling for Stone
Cum
Masonary Rturn wall
9+340 B/S 4 1.8 1.000 2.00 14.40
Structure Dismentling for Stone
STR/PMN/1818 14/Nov/19 Cum
Masonary wall
2 5+150 B/S 2 8.0 1.000 3.45 55.20
Structure Dismentling for Stone
Cum
Masonary Rturn wall
5+150 B/S 4 10.0 1.000 4.160 166.40
Drain Dismentling for Stone
STR/PMN/1414 22/Apr/19 Cum
Masonary wall
3 5+510 B/S 2 8.0 1.200 2.45 47.04

THIS BILL QTY 318.24


UP TO PREVIOUS QTY 331.92
UP TO DATE TOTAL QTY 650.16
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-2.3(ix) C


Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm,
removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000
metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.

( c ) Above 900 mm
S.N Chainage
RFI No. Date DESCRIPTION Unit Side No. Length Girth Hight Qty. Remark
. From To
HW/PMN/1241 10/Jun/20 Pipal Tree Girth Remove Mtr. 2+733 R/S 1 - 3.300 - 3.30
Neem Tree Girth Remove Mtr. 3+746 R/S 1 - 2.000 - 2.00
Kangi Tree Girth Remove Mtr. 2+893 L/S 1 - 1.800 - 1.80
Babul Tree Girth Remove Mtr. 3+160 L/S 1 - 1.000 - 1.00

THIS BILL QTY 8.10


UP TO PREVIOUS QTY 0.00
UP TO DATE TOTAL QTY 8.10
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-2.2 (A)


Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal
of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including
removal and disposal of top organic soil not exceeding 150 mm in thickness.

Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width m2 Qty. Remark
From To
1 HW/PMN/1245 3/Aug/20 Clearing & Grubbing hectare 2+600 3+250 R/S 1 650 9.400 6110.00 0.61 TCS-II
Clearing & Grubbing hectare 3+250 3+600 R/S 1 350 12.820 4487.00 0.45 TCS-III
Deduction of Bridge Slab hectare 3+460 R/S -1 65.8 12.820 -843.56 -0.08 TCS-III
2 HW/PMN/1275 22/Aug/20 Clearing & Grubbing hectare 4+500 5+180 R/S 1 680 9.400 6392.00 0.64 TCS-II
3 HW/PMN/1292 30/Aug/20 Clearing & Grubbing hectare 5+500 5+600 L/S 1 100.0 12.820 1282.00 0.13 TCS-III
Deduction of Box Culvert hectare 5+510 L/S -1 10.84 12.820 -138.97 -0.01 TCS-III
Clearing & Grubbing hectare 5+500 5+530 R/S 1 30 12.820 384.60 0.04 TCS-III
Deduction of Box Culvert hectare 5+510 R/S -1 10.84 12.820 -138.97 -0.01 TCS-III
4 HW/PMN/1321 16/Sep/20 Clearing & Grubbing hectare 5+030 5+180 L/S 1 150 9.400 1410.00 0.14 TCS-II
Clearing & Grubbing hectare 0+000 0+025 L/S 1 25 9.400 235.00 0.02 TCS-II
Clearing & Grubbing hectare 3+600 3+840 R/S 1 240 9.400 2256.00 0.23 TCS-II

THIS BILL QTY 2.14 A


UP TO PREVIOUS QTY 13.52 B
UP TO DATE TOTAL QTY 15.66 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020:

PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-3.3 (a)
Excavation in Soil using Hydaulic Excavator and Tippers with disposal up to 1000 metres.Excavations of existing road, embankment, shoulders. Ground and cement concrete
drains to designated widths and depths for the purpose of drain, pavement construction,trimming of bottom and side slopes in accordance with requirements of lines, grades
and cross Sections, rolling of bed/ground including loosening and recompaction if required and disposal of suitable /surplus and unsuitable material through all leads and lifts as
per relevant clauses of section 300.
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To

1 HW/PMN/1253 11/Aug/20 Exc For Widening Cum 2+600 3+250 R/S 1 650 9.320 1.200 7269.60 TCS-II
Exc For Widening Cum 3+250 3+600 R/S 1 350 12.820 1.200 5384.40 TCS-III
Diduction Bridge Slab Cum 3+460 R/S -1 65.8 12.820 1.200 -1012.27 TCS-III
2 HW/PMN/1285 28/Aug/20 Exc For Widening Cum 4+500 5+180 R/S 1 680 9.320 1.200 7605.12 TCS-II
3 HW/PMN/1296 3/Sep/20 Exc For Widening Cum 5+500 5+600 L/S 1 100 12.820 1.200 1538.40 TCS-III
Diduction of Box Culvert Cum 5+510 L/S -1 10.84 12.820 1.200 -166.76 TCS-III
Exc For Widening Cum 5+500 5+530 R/S 1 30 12.820 1.200 461.52 TCS-III
Diduction of Box Culvert Cum 5+510 R/S -1 10.84 12.820 1.200 -166.76 TCS-III
4 HW/PMN/1328 20/Sep/20 Exc For Widening Cum 5+030 5+180 L/S 1 150 9.320 1.200 1677.60 TCS-II
Exc For Widening Cum 0+000 0+025 L/S 1 25 9.320 1.200 279.60 TCS-II
Exc For Widening Cum 3+600 3+840 R/S 1 240 9.320 1.200 2684.16 TCS-II

THIS BILL QTY 25554.61 A


UP TO PREVIOUS QTY 142891.15 B
UP TO DATE TOTAL QTY 168445.76 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total
length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-3.10
Embankment Construction with Material Obtained from borrow pits ( Embankment & Subgrade ) construction of Embankment with approved Material having CBR>7 obtained
from borrow pits with all lifts and leads , transporting to site , spreading grading to required slope & compacting to meet requirment of table 300-1, 300-2 and as per relevent
clause of section -300
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1262 18/Aug/20 Sub Grade 1st Layer Cum 2+600 3+250 R/S 1 650 9.120 0.200 1185.60 TCS-II
Sub Grade 1st Layer Cum 3+250 3+600 R/S 1 350 12.620 0.200 883.40 TCS-III
Bridge Slab Cum 3+460 R/S -1 65.8 12.620 0.200 -166.08 TCS-III
2 HW/PMN/1303 7/Sep/20 Sub Grade 1st Layer Cum 4+500 5+180 R/S 1 680 9.120 0.200 1240.32 TCS-II
3 HW/PMN/1319 13/Sep/20 Sub Grade 1st Layer Cum 5+500 5+600 L/S 1 100 12.620 0.200 252.40 TCS-III
Diduction of Box Culvert Cum 5+510 L/S -1 10.84 12.620 0.200 -27.36 TCS-III
Sub Grade 1st Layer Cum 5+500 5+530 R/S 1 30 12.620 0.200 75.72 TCS-III
Diduction of Box Culvert Cum 5+510 R/S -1 10.84 12.620 0.200 -27.36 TCS-III
4 HW/PMN/1335 21/Sep/20 Sub Grade 1st Layer Cum 5+030 5+180 L/S 1 150 9.120 0.200 273.60 TCS-II
Sub Grade 1st Layer Cum 0+000 0+025 L/S 1 25 9.120 0.200 45.60 TCS-II
Sub Grade 1st Layer Cum 3+600 3+840 R/S 1 240 9.120 0.200 437.76 TCS-II
5 HW/PMN/1272 21/Aug/20 Sub Grade II nd Layer Cum 2+600 3+250 R/S 1 650 8.720 0.200 1133.60 TCS-II
Sub Grade II nd Layer Cum 3+250 3+600 R/S 1 350 12.220 0.200 855.40 TCS-III
Bridge Slab Cum 3+460 R/S -1 65.8 12.220 0.200 -160.82 TCS-III
6 HW/PMN/1313 11/Sep/20 Sub Grade II nd Layer Cum 4+500 5+180 R/S 1 680 8.720 0.200 1185.92 TCS-II
7 HW/PMN/1327 20/Sep/20 Sub Grade II nd Layer Cum 5+500 5+600 L/S 1 100 12.220 0.200 244.40 TCS-III
Diduction of Box Culvert Cum 5+510 L/S -1 10.84 12.220 0.200 -26.49 TCS-III
Sub Grade II nd Layer Cum 5+500 5+530 R/S 1 30 12.220 0.200 73.32 TCS-III
Diduction of Box Culvert Cum 5+510 R/S -1 10.84 12.220 0.200 -26.49 TCS-III
8 HW/PMN/1339 23/Sep/20 Sub Grade II nd Layer Cum 5+030 5+180 L/S 1 150 8.720 0.200 261.60 TCS-II
Sub Grade II nd Layer Cum 0+000 0+025 L/S 1 25 8.720 0.200 43.60 TCS-II
Sub Grade II nd Layer Cum 3+600 3+840 R/S 1 240 8.720 0.200 418.56 TCS-II
9 HW/PMN/1280 23/Aug/20 Sub Grade Top Layer Cum 2+600 3+250 R/S 1 650 8.420 0.100 547.30 TCS-II
Sub Grade Top Layer Cum 3+250 3+600 R/S 1 350 11.920 0.100 417.20 TCS-III
Bridge Slab Cum 3+460 R/S -1 65.8 11.920 0.100 -78.43 TCS-III
10 HW/PMN/1324 18/Sep/20 Sub Grade Top Layer Cum 4+500 5+180 R/S 1 680 8.420 0.100 572.56 TCS-II
11 HW/PMN/1346 25/Sep/20 Sub Grade Top Layer Cum 5+500 5+600 L/S 1 100 11.920 0.100 119.20 TCS-III
Diduction of Box Culvert Cum 5+510 L/S -1 10.84 11.920 0.100 -12.92
Sub Grade Top Layer Cum 5+500 5+530 R/S 1 30 11.920 0.100 35.76 TCS-III
Diduction of Box Culvert Cum 5+510 R/S -1 10.84 11.920 0.100 -12.92 TCS-III
12 HW/PMN/1348 27/Sep/20 Sub Grade Top Layer Cum 5+030 5+180 L/S 1 150 8.420 0.100 126.30 TCS-II
Sub Grade Top Layer Cum 0+000 0+025 L/S 1 25 8.420 0.100 21.05 TCS-II
Sub Grade Top Layer Cum 3+600 3+840 R/S 1 240 8.420 0.100 202.08 TCS-II

THIS BILL QTY 10113.37 A


UP TO PREVIOUS QTY 57093.06 B
UP TO DATE TOTAL QTY 67206.44 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO. 4.1


Granular Sub -base with Well Graded Material (CBR>30 or more) (Table:-400-1 &Table:-400-2) Construction of granular sub-base by providing close/ coarse graded
crushed material, spreading in uniform layers on prepared surface and compacting at OMC with vibratory roller to achieve the desired density, complete in all respect
as per drawing & relevant clauses of section-401
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1291 30/Aug/20 GSB 1st Layer Cum 2+600 3+250 R/S 1 650 8.170 0.150 796.58 TCS-II
GSB 1st Layer Cum 3+250 3+600 R/S 1 350 11.670 0.150 612.68 TCS-III
Bridge Slab Cum 3+460 R/S -1 65.8 11.670 0.150 -115.18 TCS-III
2 HW/PMN/1334 21/Sep/20 GSB 1st Layer Cum 4+500 5+180 R/S 1 680 8.170 0.150 833.34 TCS-II
3 HW/PMN/1349 27/Sep/20 GSB 1st Layer Cum 5+500 5+600 L/S 1 100 11.670 0.150 175.05 TCS-III
Diduction of Box Culvert Cum 5+510 L/S -1 10.84 11.670 0.150 -18.98 TCS-III
GSB 1st Layer Cum 5+500 5+530 R/S 1 30 11.670 0.150 52.52 TCS-III
Diduction of Box Culvert Cum 5+510 R/S -1 10.84 11.670 0.150 -18.98 TCS-III
4 HW/PMN/1355 29/Sep/20 GSB 1st Layer Cum 5+030 5+180 L/S 1 150 8.170 0.150 183.83 TCS-II
GSB 1st Layer Cum 0+000 0+025 L/S 1 25 8.170 0.150 30.64 TCS-II
GSB 1st Layer Cum 3+600 3+840 R/S 1 240 8.170 0.150 294.12 TCS-II
5 HW/PMN/1300 5/Sep/20 GSB Top Layer Cum 2+600 3+250 R/S 1 650 5.970 0.150 582.08 TCS-II
GSB Top Layer Cum 3+250 3+600 R/S 1 350 9.470 0.150 497.18 TCS-III
Bridge Slab Cum 3+640 R/S -1 65.8 9.470 0.150 -93.47 TCS-III
6 HW/PMN/1338 23/Sep/20 GSB Top Layer Cum 4+500 5+180 R/S 1 680 5.970 0.150 608.94 TCS-II
7 HW/PMN/1354 29/Sep/20 GSB Top Layer Cum 5+500 5+600 L/S 1 100 9.470 0.150 142.05 TCS-III
Diduction of Box Culvert Cum 5+510 L/S -1 10.84 9.470 0.150 -15.40 TCS-III
GSB Top Layer Cum 5+500 5+530 R/S 1 30 9.470 0.150 42.62 TCS-III
Diduction of Box Culvert Cum 5+510 R/S -1 10.84 9.470 0.150 -15.40 TCS-III
8 HW/PMN/1363 3/Oct/20 GSB Top Layer Cum 5+030 5+180 L/S 1 150 5.970 0.150 134.33 TCS-II
GSB Top Layer Cum 0+000 0+025 L/S 1 25 5.970 0.150 22.39 TCS-II
GSB Top Layer Cum 3+600 3+840 R/S 1 240 5.970 0.150 214.92 TCS-II

THIS BILL QTY 4945.83 A


UP TO PREVIOUS QTY 30117.74 B
UP TO DATE TOTAL QTY 35063.57 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO. 4.11
Wet Mix Macadam Providing laying, spreading and compacting grades stone aggregate to wet mix macadam specification including permixing the material with water at OMC in
mechanical mix plant, carriage of mixed material by tipper to site,laying in uniform layerscwith paver in sub-base/ base course on well prepared surface and compacting with
vibratory roller to achieve the desired density in accordance to Table No 400-12,400-13 and as per clause of section 406 of specifications.
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1309 9/Sep/20 WMM 1 st Layer Cum 2+600 3+250 R/S 1 650 5.820 0.125 472.88 TCS-II
WMM 1 st Layer Cum 3+250 3+600 R/S 1 350 8.820 0.125 385.88 TCS-III
WMM 1 st Layer Cum 3+460 R/S -1 65.8 8.820 0.125 -72.54 TCS-III
2 HW/PMN/1345 25/Sep/20 WMM 1 st Layer Cum 4+500 5+180 R/S 1 680 5.820 0.125 494.70 TCS-II
3 HW/PMN/1368 5/Oct/20 WMM 1 st Layer Cum 5+030 5+180 L/S 1 150 5.820 0.125 109.13 TCS-II
WMM 1 st Layer Cum 0+000 0+025 L/S 1 25 5.820 0.125 18.19 TCS-II
WMM 1 st Layer Cum 3+600 3+840 R/S 1 240 5.820 0.125 174.60 TCS-II

4 HW/PMN/1318 13/Sep/20 WMM Top Layer Cum 2+600 3+250 R/S 1 650 5.695 0.125 462.72 TCS-II
WMM Top Layer Cum 3+250 3+600 R/S 1 350 8.695 0.125 380.41 TCS-III
WMM Top Layer Cum 3+460 R/S -1 65.8 8.695 0.125 -71.52 TCS-III
5 HW/PMN/1353 29/Sep/20 WMM Top Layer Cum 4+500 5+180 R/S 1 680 5.695 0.125 484.08 TCS-II
6 HW/PMN/1375 8/Oct/20 WMM Top Layer Cum 5+030 5+180 L/S 1 150 5.695 0.125 106.78 TCS-II
WMM Top Layer Cum 0+000 0+025 L/S 1 25 5.695 0.125 17.80 TCS-II
WMM Top Layer Cum 3+600 3+840 R/S 1 240 5.695 0.125 170.85 TCS-II

THIS BILL QTY 3133.93 A


UP TO PREVIOUS QTY 22734.12 B
UP TO DATE TOTAL QTY 25868.05 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO:- 4.13
Construction of Shoulders with approved material /selected soil i/c excavation all lifts & leads i/c grading to required slope & camber of 4% and compacting using vibratory roller of 80 to
100 kN Static weight to meet requirement as per relevant clause of 400. B.Hard Shoulders (CBR value>12)
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To

1 HW/PMN/1329 20/Sep/20 Hard Shoulder ( GSB TOP ) Cum 2+600 3+600 R/S 1 1000 2.220 0.150 333.00
Diduction of Slab Culvert Cum 3+460 R/S -1 65.8 2.220 0.150 -21.91
2 HW/PMN/1359 1/Oct/20 Hard Shoulder ( GSB TOP ) Cum 4+500 5+180 R/S 1 680 2.220 0.150 226.44
Hard Shoulder ( GSB TOP ) Cum 5+000 5+200 L/S 1 200 2.220 0.150 66.60

3 HW/PMN/1350 27/Sep/20 Hard Shoulder ( WMM 1st ) Cum 2+600 3+600 R/S 1 1000 1.790 0.125 223.75
Diduction of Slab Culvert Cum 3+460 R/S -1 65.8 1.790 0.125 -14.72
4 HW/PMN/1364 3/Oct/20 Hard Shoulder ( WMM 1st ) Cum 4+500 5+180 R/S 1 680 1.790 0.125 152.15
Hard Shoulder ( WMM 1st ) Cum 5+000 5+200 L/S 1 200 1.790 0.125 44.75

5 HW/PMN/1356 29/Sep/20 Hard Shoulder ( WMM IInd ) Cum 2+600 3+600 R/S 1 1000 1.720 0.125 215.00
Diduction of Slab Culvert Cum 3+460 R/S -1 65.8 1.720 0.125 -14.15
6 HW/PMN/1376 8/Oct/20 Hard Shoulder ( WMM IInd ) Cum 4+500 5+180 R/S 1 680 1.720 0.125 146.20
Hard Shoulder ( WMM IInd ) Cum 5+000 5+200 L/S 1 200 1.720 0.125 43.00

THIS BILL QTY 1400.11 A


UP TO PREVIOUS QTY 2833.86 B
UP TO DATE TOTAL QTY 4233.97 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-5.1


Prime Coat : Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer
at the rate of 0.75 kg/sqm using mechanical means as per relevant clause-502 of specifications.

Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1299 5/Oct/20 Prime Coat Sqm 0+000 0+025 L/S 1 25 5.500 137.50 Approch Road

THIS BILL QTY 137.50 A


UP TO PREVIOUS QTY 84121.23 B
UP TO DATE TOTAL QTY 84258.73 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-5.2(ii)


Providing and applying tack coat with catonic bitumen emulsion (RS-1) using emulsion pressure distributor on the prepared bituminous/granular surface cleaned
with machanical broom and as per relevant clauses of section -503 of specifications.

(ii) @ 0.30 kg per sqm (dry & hungry bituminous surfaces/granular surfaces treated with primer)
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1302 6/Oct/20 Tack Coat I Sqm 0+000 0+025 L/S 1 25 5.500 137.50 Approch Rasd

THIS BILL QTY 137.50 A


UP TO PREVIOUS QTY 84121.23 B
UP TO DATE TOTAL QTY 84258.73 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO:- 5.5 (a) (ii)


Dense Graded Bituminous Macadam : Providing and laying dense bituminous macadam with hot mix plant using crushed aggregates of specified grading, premixed with
bituminous binder,4.0 to 4.5 % by weight of total mix of mix and filler, transporting the hot mix to work site, laying with hydraulic paver with sensor control to the required
grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to chieve the desired compaction as per relevant clauses of section-505 of specification
complete in all respects.

Using Bach Mix Plant of apprroprite capacity and paver finisher hydraustate with sensor .for grading II (19mm nominal size).

Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1302A 6/Oct/20 DBM Laying Cum 0+000 0+025 L/S 1 25 5.500 0.070 9.63 Approch Road

THIS BILL QTY 9.63 A


UP TO PREVIOUS QTY 5888.49 B
UP TO DATE TOTAL QTY 5898.11 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-5.2(i)


Providing and applying tack coat with catonic bitumen emulsion (RS-1) using emulsion pressure distributor on the prepared bituminous/granular surface cleaned with
machanical broom and as per relevant clauses of section -503 of specifications.
(i) 0.25 kg per sqm (normaal bituminous surfaces )
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1342 7/Oct/20 Tack Coat I For BC Sqm 0+020 0+050 R/S 1 30 9.667 290.01
Tack Coat I For BC Sqm 2+000 2+280 R/S 1 280 5.500 1540.00

THIS BILL QTY 1830.01 A


UP TO PREVIOUS QTY 227534.65 B
UP TO DATE TOTAL QTY 229364.66 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO:- 5.6 (a) (iv)
Bituminous Cnoncrete Providing and laying bituminous cnoncrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder, @5.4 to 5.6% of mix
and filler, transporting the hot mix to work site , laying with a sensor paver finisher to the required grade , level and alignment, rolling with smooth wheelled, vibratory and tandem rollers
to achieve the desired compaction in all respects and as per relevant clauses of section-500 (only cement will be used as filller).

(iv) For grading -II (30-35mm thickness) with 60/70 bitumen (VG-30)
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1344 7/Oct/20 Bituminous Cnoncrete Laying Cum 0+020 0+050 R/S 1 30 6.667 0.040 8.00
Bituminous Cnoncrete Laying Cum 0+020 0+050 R/S 1 30 3.000 0.030 2.70
Bituminous Cnoncrete Laying Cum 2+000 2+280 R/S 1 280 5.500 0.040 61.60

THIS BILL QTY 72.30 A


UP TO PREVIOUS QTY 8061.81 B
UP TO DATE TOTAL QTY 8134.11 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.3 (ii)


Providing and fixing of retro -reflectorised cautionary , mandatory and infromatory sing as per IRC :67 made of encapsulate lens type reflective vide clause 801.3, fixed over
aluminium sheeting, 1.5 mm thick supported on mild steel angle iron post 75mm x 6mm (height from crown level of the road adn bottom of the sign board shall not be less than
1.5mm) firmly fixed to the ground by means of properly designed foundation with m15 grade cement concrete 45 cm x 45 cm x 60 cm below ground level as per approved drawing
including painting of vertical post as per technical specification section 800.
(ii).60 cm equilateral triangle
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1244 12/Jul/20 600mm TRIANGLE Each 3+350 L/S 1 - - - 1.00
600mm TRIANGLE Each 3+510 R/S 1 - - - 1.00
600mm TRIANGLE Each 0+050 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 0+060 L/S 1 - - - 1.00 Y Intersection
600mm TRIANGLE Each 0+050 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 1+170 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 1+240 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 2+170 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 2+650 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 2+750 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 3+540 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 7+130 L/S 1 - - - 1.00 junction Crossing
600mm TRIANGLE Each 7+200 R/S 1 - - - 1.00 junction Crossing
2 HW/PMN/1247 4/Aug/20 600mm TRIANGLE Each 8+300 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 8+800 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 9+000 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 9+160 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 9+900 L/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 10+000 R/S 1 - - - 1.00 Intersection
600mm TRIANGLE Each 0+600 L/S 1 - - - 1.00 Speed Limit
600mm TRIANGLE Each 1+100 L/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 1+180 L/S 1 - - - 1.00 Speed Limit
600mm TRIANGLE Each 1+250 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 1+350 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 2+050 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 2+300 L/S 1 - - - 1.00 T- Intersection
3 HW/PMN/1265 20/Aug/20 600mm TRIANGLE Each 2+370 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 2+950 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 3+500 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 0+70 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 0+100 R/S 1 - - - 1.00 Speed Limit
600mm TRIANGLE Each 0+690 R/S 1 - - - 1.00 Speed Limit
600mm TRIANGLE Each 1+190 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 1+230 R/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 1+280 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 1+450 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 1+580 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 2+250 R/S 1 - - - 1.00 T- Intersection
4 HW/PMN/1290 30/Aug/20 600mm TRIANGLE Each 1+800 L/S 1 - - - 1.00 Give way
600mm TRIANGLE Each 0+630 R/S 1 - - - 1.00 Give way
600mm TRIANGLE Each 2+080 R/S 1 - - - 1.00 Give way
600mm TRIANGLE Each 5+450 R/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 7+100 R/S 1 - - - 1.00 Give way
600mm TRIANGLE Each 6+750 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 7+150 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 7+900 R/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 7+550 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 3+700 L/S 1 - - - 1.00 Give way
600mm TRIANGLE Each 3+750 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 4+150 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 4+280 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 4+500 L/S 1 - - - 1.00 Give way
5 HW/PMN/1304 7/Sep/20 600mm TRIANGLE Each 5+250 L/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 5+520 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 5+770 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 6+400 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 7+820 L/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 8+700 L/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 8+800 L/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 8+900 L/S 1 - - - 1.00 Y Intersection
600mm TRIANGLE Each 7+900 R/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 8+050 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 8+700 R/S 1 - - - 1.00 Z intersection
600mm TRIANGLE Each 8+880 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 9+150 R/S 1 - - - 1.00 T- Intersection
600mm TRIANGLE Each 9+450 R/S 1 - - - 1.00 T- Intersection

THIS BILL QTY 66.00 A

UP TO PREVIOUS QTY 2.00 B

UP TO DATE TOTAL QTY 68.00 A+B


MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.3 (v)


Providing and fixing of retro -reflectorised cautionary , mandatory and infromatory sing as per IRC :67 made of encapsulate lens type reflective vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick
supported on mild steel angle iron post 75mm x 6mm (height from crown level of the road adn bottom of the sign board shall not be less than 1.5mm) firmly fixed to the ground by means of properly designed
foundation with m15 grade cement concrete 45 cm x 45 cm x 60 cm below ground level as per approved drawing including painting of vertical post as per technical specification section 800.

(v).60cm x 45cm rectangulat informatory signs


Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1242 11/Jun/20 600X450 rectangular Informatory Signs Each 3+330 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+350 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+370 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+210 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+230 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+250 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+270 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+290 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+310 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+330 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+350 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+370 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+550 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+570 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+590 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+610 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+630 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+650 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+550 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+570 R/S 1 - - - 1.00
2 HW/PMN/1254 11/Aug/20 600X450 rectangular Informatory Signs Each 3+590 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+610 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+630 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 3+650 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+250 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+270 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+290 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+310 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+350 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+370 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+390 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+250 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+270 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+290 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+310 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+330 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+350 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+370 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 4+390 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+100 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+120 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+140 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+160 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+180 Median 1 - - - 1.00
3 HW/PMN/1257 16/Aug/20 600X450 rectangular Informatory Signs Each 7+100 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+120 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+140 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+160 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+180 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+300 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+320 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+340 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+360 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+380 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+400 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+300 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+320 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+340 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+360 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+380 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 7+400 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 8+990 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+010 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+030 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+050 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+070 L/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+090 L/S 1 - - - 1.00
4 HW/PMN/1282 25/Aug/20 600X450 rectangular Informatory Signs Each 8+990 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+010 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+030 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+050 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+070 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+090 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+420 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+440 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+460 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+480 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+500 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+520 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+540 Median 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+420 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+440 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+460 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+480 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+500 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+520 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 9+540 R/S 1 - - - 1.00
600X450 rectangular Informatory Signs Each 5+350 L/S 1 - - - 1.00 Peadastol
600X450 rectangular Informatory Signs Each 6+425 L/S 1 - - - 1.00 Peadastol
600X450 rectangular Informatory Signs Each 8+250 L/S 1 - - - 1.00 Peadastol
600X450 rectangular Informatory Signs Each 5+430 R/S 1 - - - 1.00 Peadastol
600X450 rectangular Informatory Signs Each 5+880 R/S 1 - - - 1.00 Peadastol
600X450 rectangular Informatory Signs Each 8+300 R/S 1 - - - 1.00 Peadastol

THIS BILL QTY 93.00 A

UP TO PREVIOUS QTY 96.00 B

UP TO DATE TOTAL QTY 189.00 A+B


MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.16 (i)


Providing Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc
as per relevant claused oa section 800 of specifications.
5th kilometre stone (precast)
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1301 5/Sep/20 5th kilometre stone (precast) Each 2+600 L/S 1 - - - 1.00
5th kilometre stone (precast) Each 2+600 R/S 1 - - - 1.00
5th kilometre stone (precast) Each 7+600 L/S 1 - - - 1.00
5th kilometre stone (precast) Each 7+600 R/S 1 - - - 1.00

THIS BILL QTY 4.00 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 4.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.16 (ii)


Providing Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing
etc as per relevant claused oa section 800 of specifications.
Ordinary Kilometer stone (Precast)
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1314 11/Sep/20 Ordinary Kilometer stone (Precast) Each 0+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 0+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 1+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 1+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 3+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 3+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 4+600 L/S 1 - - - 1.00
2 HW/PMN/1340 23/Sep/20 Ordinary Kilometer stone (Precast) Each 4+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 5+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 5+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 6+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 6+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 8+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 8+600 R/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 9+600 L/S 1 - - - 1.00
Ordinary Kilometer stone (Precast) Each 9+600 R/S 1 - - - 1.00

THIS BILL QTY 16.00 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 16.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.16 (iii)


Providing Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc
as per relevant claused oa section 800 of specifications.
Hectometer stone (Precast)
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1347 27/Sep/20 Hectometer stone (Precast) Each 0+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 0+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 0+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 1+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 1+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 1+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 1+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 2+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 2+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 2+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 2+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 3+000 B/S 2 - - - 2.00
2 HW/PMN/1357 30/Sep/20 Hectometer stone (Precast) Each 3+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 3+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 3+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 4+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 4+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 4+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 4+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 5+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 5+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 5+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 5+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 6+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 6+200 B/S 2 - - - 2.00
3 HW/PMN/1365 3/Oct/20 Hectometer stone (Precast) Each 6+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 6+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 7+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 7+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 7+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 7+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 8+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 8+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 8+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 8+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 9+000 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 9+200 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 9+400 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 9+800 B/S 2 - - - 2.00
Hectometer stone (Precast) Each 10+000 B/S 2 - - - 2.00

THIS BILL QTY 80.00 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 80.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO:- 8.24 (i)


Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and
medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled
with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH -
33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified.
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To

1 STR/PMN/2113 13/Jun/20 Box Culvurt Crash Barrier RM 5+150 B/S 2 18.000 36.00
Box Culvurt Crash Barrier RM 5+510 B/S 2 14.000 28.00
2 STR/PMN/2169 20/Jul/20 Box Culvurt Crash Barrier RM 4+360 B/S 2 72.900 145.80

THIS BILL QTY 209.80 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 209.80 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.25 (a)


Type-a ,"W" : metal beam crash barrier (providing and erecting a "W" metal beam crash barrier comprising of 3 m thick corrugated sheet metal beam rail ,
70cm above road /ground level ,fixed on ISMC series channel vertical post, 150 x 75 x 5mm spaced 2m centre to centre , 1.8 m high ,1.1 m below
ground/road level ,all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS :1367 and IS :1364, metal beam rail to be
fixed on the vertical post with a spacer of channal section of channel section 150 x 75 x 5mm , 330mm long complete as per clause 810 of specifications.
Type-a ,"W" : Metal beam crash barrier
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2237 'W"
8/Sep/20 Metal beam crash barrier Meter 3+383 3+399 L/S 1 16.0 - - 16.00
'W" Metal beam crash barrier Meter 3+462 3+486 L/S 1 24.0 - - 24.00
'W" Metal beam crash barrier Meter 3+375 3+399 R/S 1 24.0 - - 24.00
2 STR/PMN/2250 16/Sep/20 'W" Metal beam crash barrier Meter 5+021 5+141 L/S 1 120.0 - - 120.00
3 STR/PMN/2276 24/Sep/20 'W" Metal beam crash barrier Meter 5+159 5+211 L/S 1 52.0 - - 52.00
4 STR/PMN/2293 30/Sep/20 'W" Metal beam crash barrier Meter 5+100 5+140 R/S 1 40.0 - - 40.00
'W" Metal beam crash barrier Meter 5+159 5+203 R/S 1 44.0 - - 44.00

THIS BILL QTY 320.00 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 320.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO:- 8.27


Providing and laying utility duct of 300 mm dia NP-4 pipe in urban/ rural areas as per technical specification section 2900 and as directed by the
engineer.
Chainage No.
S.N. RFI No. Date DESCRIPTION Unit Side No.
Pipe
Length Width Height Qty. Remark
From To
1 STR/PMN/2274 24/Sep/20 Pipe Laying 300 mm RMT 4+320 4+350 R/S 12 2.500 30.00
Pipe Laying 300 mm RMT 3+510 3+560 L/S 20 2.500 50.00
Pipe Laying 300 mm RMT 3+840 C/W 11 2.500 27.50
2 STR/PMN/2284 28/Sep/20 Pipe Laying 300 mm RMT 4+420 4+465 L/S 18 2.500 45.00
Pipe Laying 300 mm RMT 2+730 C/W 15 2.500 37.50
3 STR/PMN/2296 30/Sep/20 Pipe Laying 300 mm RMT 2+900 2+945 R/S 18 2.500 45.00
Pipe Laying 300 mm RMT 3+140 R/S 14 2.500 35.00
Pipe Laying 300 mm RMT 3+200 L/S 8 2.500 20.00

THIS BILL QTY 290.00 A


UP TO PREVIOUS QTY 2535.00 B
UP TO DATE TOTAL QTY 2825.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-12.1B(i)


Earth work in excavation of foundation of structures as per drawing and technical specification, for all depths in all types of soil/rock including setting out ,
construction of shoring and bracing , dresssing of sides and bottom, back filling with approved material etc. within all leads and lifts complete and as per
relevant clauses of section 300 and 2100 of MORT&H specification.

(i)In all types of soil.


Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
PARSONA MAJAN NIGHAI TURN ROAD
1 STR/PMN/2111 12/Jun/20 Exc. For Drain Cum 7+185 7+600 L/S 1 415.00 1.700 0.600 423.30
2 STR/PMN/2130 19/Jun/20 Exc. For Drain Cum 9+925 +108 C/W 1 108.00 1.700 0.800 146.88
Exc. For Drain Cum 9+900 9+925 R/S 1 25.00 1.700 1.100 46.75
Exc. For Drain Cum 8+670 8+700 L/S 1 30.00 1.700 0.880 44.88
Exc. For Drain Cum 6+700 6+790 R/S 1 90.00 1.700 0.800 122.40
Exc. For Drain Cum 6+798 6+900 R/S 1 102.00 1.700 0.960 166.46
3 STR/PMN/2153 5/Jul/20 Exc. For Drain Cum 1+800 1+806 R/S 1 6.00 1.700 0.656 6.69
Exc. For Drain Cum 1+816 1+891 R/S 1 75.00 1.700 1.000 127.50
Exc. For Drain Cum 1+896 1+901 R/S 1 5.00 1.700 1.110 9.44
Exc. For Drain Cum 1+910 2+045 R/S 1 135.00 1.700 0.770 176.72
4 STR/PMN/2188 1/Aug/20 Exc. For Approch Drain Cum 8+600 C/W 1 15.00 2.700 0.750 30.38
Exc. For Approch Drain Cum 6+790 6+798 R/S 1 8.00 2.700 0.890 19.22
Exc. For Approch Drain Cum 1+806 1+816 R/S 1 10.00 2.700 0.650 17.55
Exc. For Approch Drain Cum 1+901 1+910 R/S 1 9.00 2.700 0.800 19.44
5 STR/PMN/2211 20/Aug/20 Exc. For Protaction Wall Cum 3+400 C/W 1 5.00 2.000 0.500 5.00
Exc. For Protaction Wall Cum 3+460 C/W 1 5.00 2.000 0.650 6.50
6 STR/PMN/2215 21/Aug/20 Exc. For Return Wall Cum 5+510 U/S 2 5.20 3.800 4.200 165.984

THIS BILL QTY 1535.09 A


UP TO PREVIOUS QTY 34906.53 B
UP TO DATE TOTAL QTY 36441.62 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna

Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-12.3


Providing plain cement cocrete of grade M-15 nominal mix in foundation as per relevant clouse of section 1500, 1700 and 2100.
.PCC Grade M- 15
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2119 15/Jun/20 PCC. For Drain Cum 7+185 7+600 L/S 1 415.00 1.700 0.150 105.83
2 STR/PMN/2138 22/Jun/20 PCC. For Drain Cum 9+925 +108 C/W 1 108.00 1.700 0.150 27.54
PCC. For Drain Cum 9+900 9+925 R/S 1 25.00 1.700 0.150 6.38
PCC. For Drain Cum 8+670 8+700 L/S 1 30.00 1.700 0.150 7.65
PCC. For Drain Cum 6+700 6+790 R/S 1 90.00 1.700 0.150 22.95
PCC. For Drain Cum 6+798 6+900 R/S 1 102.00 1.700 0.150 26.01
3 STR/PMN/2159 14/Jul/20 PCC. For Drain Cum 1+800 1+806 R/S 1 6.00 1.700 0.150 1.53
PCC. For Drain Cum 1+816 1+891 R/S 1 75.00 1.700 0.150 19.13
PCC. For Drain Cum 1+896 1+901 R/S 1 5.00 1.700 0.150 1.28
PCC. For Drain Cum 1+910 2+045 R/S 1 135.00 1.700 0.150 34.43
4 STR/PMN/2196 10/Aug/20 PCC. For Approch Drain Crossing Cum 8+600 C/W 1 15.00 2.000 0.150 4.50
PCC. For Approch Drain Cum 6+790 6+798 R/S 1 8.00 2.000 0.150 2.40
PCC. For Approch Drain Cum 1+806 1+816 R/S 1 10.00 2.000 0.150 3.00
PCC. For Approch Drain Cum 1+901 1+910 R/S 1 9.00 2.000 0.150 2.70
5 STR/PMN/2214 21/Aug/20 PCC For Protaction Wall Cum 3+400 C/W 1 4.80 1.830 0.150 1.32
PCC For Protaction Wall Cum 3+460 C/W 1 4.80 1.830 0.150 1.32
6 STR/PMN/2230 5/Sep/20 PCC For Return Wall Cum 5+510 D/S 2 5.100 3.500 0.150 5.355

THIS BILL QTY 273.30 A

UP TO PREVIOUS QTY 2527.16 B

UP TO DATE TOTAL QTY 2800.45 A+B


MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna

Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-13.6 (f )


Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.
.RCC Grade M-25
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2127 16/Jun/20 Raft For Drain Cum 7+185 7+600 L/S 1 415.00 1.500 0.150 93.38
2 STR/PMN/2149 30/Jun/20 Raft For Drain Cum 9+925 +108 C/W 1 108.00 1.500 0.150 24.30
Raft For Drain Cum 9+900 9+925 R/S 1 25.00 1.500 0.150 5.63
Raft For Drain Cum 8+670 8+700 L/S 1 30.00 1.500 0.150 6.75
Raft For Drain Cum 6+700 6+790 R/S 1 90.00 1.500 0.150 20.25
Raft For Drain Cum 6+798 6+900 R/S 1 102.00 1.500 0.150 22.95
3 STR/PMN/2171 20/Jul/20 Raft For Drain Cum 1+800 1+806 R/S 1 6.00 1.500 0.150 1.35
Raft For Drain Cum 1+816 1+891 R/S 1 75.00 1.500 0.150 16.88
Raft For Drain Cum 1+896 1+901 R/S 1 5.00 1.500 0.150 1.13
Raft For Drain Cum 1+910 2+045 R/S 1 135.00 1.500 0.150 30.38
4 STR/PMN/2206 17/Aug/20 Raft For Approch Drain Cum 8+600 C/W 1 15.00 1.800 0.300 8.10
Raft For Approch Drain Cum 6+790 6+798 R/S 1 8.00 1.800 0.300 4.32
Raft For Approch Drain Cum 1+806 1+816 R/S 1 10.00 1.800 0.300 5.40
Raft For Approch Drain Cum 1+901 1+910 R/S 1 9.00 1.800 0.300 4.86
5 STR/PMN/2137 22/Jun/20 Wall W1 & W3 For Drain Cum 7+185 7+600 L/S 2 415.00 0.150 1.200 149.40
6 STR/PMN/2157 11/Jul/20 Wall W1 & W3 For Drain Cum 9+925 +108 C/W 2 108.00 0.150 1.200 38.88
Wall W1 & W3 For Drain Cum 9+900 9+925 R/S 2 25.00 0.150 1.200 9.00
Wall W1 & W3 For Drain Cum 8+670 8+700 L/S 2 30.00 0.150 1.200 10.80
Wall W1 & W3 For Drain Cum 6+700 6+790 R/S 2 90.00 0.150 1.200 32.40
Wall W1 & W3 For Drain Cum 6+798 6+900 R/S 2 102.00 0.150 1.200 36.72
7 STR/PMN/2181 28/Jul/20 Wall W1 & W3 For Drain Cum 1+800 1+806 R/S 2 6.00 0.150 1.200 2.16
Wall W1 & W3 For Drain Cum 1+816 1+891 R/S 2 75.00 0.150 1.200 27.00
Wall W1 & W3 For Drain Cum 1+896 1+901 R/S 2 5.00 0.150 1.200 1.80
Wall W1 & W3 For Drain Cum 1+910 2+045 R/S 2 135.00 0.150 1.200 48.60
8 STR/PMN/2212 20/Aug/20 Wall W1 & W3 For Apporach Drain Cum 8+600 C/W 2 15.00 0.300 1.200 10.80
Wall W1 & W3 For Apporach Drain Cum 6+790 6+798 R/S 2 8.00 0.300 1.200 5.76
Wall W1 & W3 For Apporach Drain Cum 1+806 1+816 R/S 2 10.00 0.300 1.200 7.20
Wall W1 & W3 For Apporach Drain Cum 1+901 1+910 R/S 2 9.00 0.300 1.200 6.48
9 STR/PMN/2143 24/Jun/20 Wall W2 For Drain Cum 7+185 7+600 L/S 1 415.00 0.100 1.200 49.80
10 STR/PMN/2164 17/Jul/20 Wall W2 For Drain Cum 9+925 +108 C/W 1 108.00 0.100 1.200 12.96
Wall W2 For Drain Cum 9+900 9+925 R/S 1 25.00 0.100 1.200 3.00
Wall W2 For Drain Cum 8+670 8+700 L/S 1 30.00 0.100 1.200 3.60
Wall W2 For Drain Cum 6+700 6+790 R/S 1 90.00 0.100 1.200 10.80
Wall W2 For Drain Cum 6+798 6+900 R/S 1 102.00 0.100 1.200 12.24
11 STR/PMN/2191 2/Aug/20 Wall W2 For Drain Cum 1+800 1+806 R/S 1 6.00 0.100 1.200 0.72
Wall W2 For Drain Cum 1+816 1+891 R/S 1 75.00 0.100 1.200 9.00
Wall W2 For Drain Cum 1+896 1+901 R/S 1 5.00 0.100 1.200 0.60
Wall W2 For Drain Cum 1+910 2+045 R/S 1 135.00 0.100 1.200 16.20
12 STR/PMN/2218 23/Aug/20 Wall W2 For Apporach Drain Cum 8+600 C/W 1 15.00 0.100 1.200 1.80
Wall W2 For Apporach Drain Cum 6+790 6+798 R/S 1 8.00 0.100 1.200 0.96
Wall W2 For Apporach Drain Cum 1+806 1+816 R/S 1 10.00 0.100 1.200 1.20
Wall W2 For Apporach Drain Cum 1+901 1+910 R/S 1 9.00 0.100 1.200 1.08
13 STR/PMN/2221 25/Aug/20 Slab Casting For Drain Cum 7+185 7+600 L/S 80 4.90 1.500 0.150 88.20
Slab Casting For Drain Cum 7+185 7+600 L/S 39 0.60 1.500 0.150 5.27
14 STR/PMN/2233 6/Sep/20 Slab Casting For Drain Cum 9+925 +108 C/W 20 4.90 1.500 0.150 22.05
Slab Casting For Drain Cum 9+925 +108 C/W 16 0.60 1.500 0.150 2.16
Slab Casting For Drain Cum 9+925 +108 C/W 1 0.40 1.500 0.150 0.09
Slab Casting For Drain Cum 9+900 9+925 R/S 4 4.90 1.500 0.150 4.41
Slab Casting For Drain Cum 9+900 9+925 R/S 9 0.60 1.500 0.150 1.22
15 STR/PMN/2241 10/Sep/20 Slab Casting For Drain Cum 8+670 8+700 L/S 5 4.90 1.500 0.150 5.51
Slab Casting For Drain Cum 8+670 8+700 L/S 9 0.60 1.500 0.150 1.22
Slab Casting For Drain Cum 6+700 6+790 R/S 15 4.90 1.500 0.150 16.54
Slab Casting For Drain Cum 6+700 6+790 R/S 16 0.60 1.500 0.150 2.16
Slab Casting For Drain Cum 6+798 6+900 R/S 19 4.90 1.500 0.150 20.95
16 STR/PMN/2271 21/Sep/20 Slab Casting For Drain Cum 6+798 6+900 R/S 15 0.60 1.500 0.150 2.03
Slab Casting For Drain Cum 1+800 1+806 R/S 1 6.00 1.500 0.150 1.35
Slab Casting For Drain Cum 1+816 1+891 R/S 14 4.90 1.500 0.150 15.44
Slab Casting For Drain Cum 1+816 1+891 R/S 10 0.60 1.500 0.150 1.35
Slab Casting For Drain Cum 1+816 1+891 R/S 1 0.40 1.500 0.150 0.09
Slab Casting For Drain Cum 1+896 1+901 R/S 1 5.00 1.500 0.150 1.13
Slab Casting For Drain Cum 1+910 2+045 R/S 25 4.90 1.500 0.150 27.56
Slab Casting For Drain Cum 1+910 2+045 R/S 21 0.60 1.500 0.150 2.84
17 STR/PMN/2224 28/Aug/20 Slab Casting For Approch Drain Cum 8+600 C/W 1 15.00 1.800 0.300 8.10
Slab Casting For Approch Drain Cum 6+790 6+798 R/S 1 8.00 1.800 0.300 4.32
Slab Casting For Approch Drain Cum 1+806 1+816 R/S 1 10.00 1.800 0.300 5.40
Slab Casting For Approch Drain Cum 1+901 1+910 R/S 1 9.00 1.800 0.300 4.86

THIS BILL QTY 1000.83 A


UP TO PREVIOUS QTY 8620.10 B
UP TO DATE TOTAL QTY 9620.93 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work : 4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co. Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-13.7
Supplying Fitting and Placing HYSD bar reinforcement in substructure complete as per drawing and technical spacifications and as per relevant clause of section 1600.
Chainage Cutting No. of Length of
S.N. RFI No. Date DESCRIPTION Unit Side Length Dia Specing Total Length Unit Wt./Kg Qty (In Kg) Qty (In MT) Remark
Length Bar Bar
From To
Road ( Parsona to Nigahi )
1 STR/PMN/2126 16/Jun/20 HYSD Bar For Draim Main Bar mt 7+185 7+600 L/S 415 10 0.150 3.850 2767 1 10651.667 0.617 6575.103 6.575 U
HYSD Bar For Draim Main Bar mt 7+185 7+600 L/S 415 10 0.150 1.550 2767 1 4288.333 0.617 2647.119 2.647 L
Distrubuction Bar For Raft mt 7+185 7+600 L/S 415 8 0.200 415.000 8 1 3320.000 0.395 1311.400 1.311 -
Distrubuction Bar For Wall mt 7+185 7+600 L/S 415 8 0.200 415.000 7 3 8715.000 0.395 3442.425 3.442 -
Distrubuction Bar Overlap mt 7+185 7+600 L/S 415 8 0.200 0.400 29 34 389.567 0.395 153.879 0.154

2 STR/PMN/2150 30/Jun/20 HYSD Bar For Draim Main Bar mt 9+925 +108 C/W 108 10 0.150 3.850 720 1 2772.000 0.617 1711.111 1.711 U
HYSD Bar For Draim Main Bar mt 9+925 +108 C/W 108 10 0.150 1.550 720 1 1116.000 0.617 688.889 0.689 L
Distrubuction Bar For Raft mt 9+925 +108 C/W 108 8 0.200 108.000 8 1 864.000 0.395 341.280 0.341 -
Distrubuction Bar For Wall mt 9+925 +108 C/W 108 8 0.200 108.000 7 3 2268.000 0.395 895.860 0.896
Distrubuction Bar Overlap mt 9+925 +108 C/W 108 8 0.200 0.400 29 8 92.800 0.395 36.656 0.037

HYSD Bar For Draim Main Bar mt 9+900 9+925 R/S 25 10 0.150 3.850 167 1 641.667 0.617 396.091 0.396 U
HYSD Bar For Draim Main Bar mt 9+900 9+925 R/S 25 10 0.150 1.550 167 1 258.333 0.617 159.465 0.159 L
Distrubuction Bar For Raft mt 9+900 9+925 R/S 25 8 0.200 25.000 8 1 200.000 0.395 79.000 0.079 -
Distrubuction Bar For Wall mt 9+900 9+925 R/S 25 8 0.200 25.000 7 3 525.000 0.395 207.375 0.207
Distrubuction Bar Overlap mt 9+900 9+925 R/S 25 8 0.200 0.400 29 1 12.567 0.395 4.964 0.005

HYSD Bar For Draim Main Bar mt 8+670 8+700 L/S 30 10 0.150 3.850 200 1 770.000 0.617 475.309 0.475 U
HYSD Bar For Draim Main Bar mt 8+670 8+700 L/S 30 10 0.150 1.550 200 1 310.000 0.617 191.358 0.191 L
Distrubuction Bar For Raft mt 8+670 8+700 L/S 30 8 0.200 30.000 8 1 240.000 0.395 94.800 0.095 -
Distrubuction Bar For Wall mt 8+670 8+700 L/S 30 8 0.200 30.000 7 3 630.000 0.395 248.850 0.249
Distrubuction Bar Overlap mt 8+670 8+700 L/S 30 8 0.200 0.400 29 2 17.400 0.395 6.873 0.007

HYSD Bar For Draim Main Bar mt 6+700 6+790 R/S 90 10 0.150 3.850 600 1 2310.000 0.617 1425.926 1.426 U
HYSD Bar For Draim Main Bar mt 6+700 6+790 R/S 90 10 0.150 1.550 600 1 930.000 0.617 574.074 0.574 L
Distrubuction Bar For Raft mt 6+700 6+790 R/S 90 8 0.200 90.000 8 1 720.000 0.395 284.400 0.284 -
Distrubuction Bar For Wall mt 6+700 6+790 R/S 90 8 0.200 90.000 7 3 1890.000 0.395 746.550 0.747
Distrubuction Bar Overlap mt 6+700 6+790 R/S 90 8 0.200 0.400 29 7 75.400 0.395 29.783 0.030

HYSD Bar For Draim Main Bar mt 6+798 6+900 R/S 102 10 0.150 3.850 680 1 2618.000 0.617 1616.049 1.616 U
HYSD Bar For Draim Main Bar mt 6+798 6+900 R/S 102 10 0.150 1.550 680 1 1054.000 0.617 650.617 0.651 L
Distrubuction Bar For Raft mt 6+798 6+900 R/S 102 8 0.200 102.000 8 1 816.000 0.395 322.320 0.322 -
Distrubuction Bar For Wall mt 6+798 6+900 R/S 102 8 0.200 102.000 7 3 2142.000 0.395 846.090 0.846
Distrubuction Bar Overlap mt 6+798 6+900 R/S 102 8 0.200 0.400 29 8 87.000 0.395 34.365 0.034

3 STR/PMN/2170 20/Jul/20 HYSD Bar For Draim Main Bar mt 1+800 1+806 R/S 6 10 0.150 3.850 40 1 154.000 0.617 95.062 0.095 U
HYSD Bar For Draim Main Bar mt 1+800 1+806 R/S 6 10 0.150 1.550 40 1 62.000 0.617 38.272 0.038 L
Distrubuction Bar For Raft mt 1+800 1+806 R/S 6 8 0.200 6.000 8 1 48.000 0.395 18.960 0.019 -
Distrubuction Bar For Wall mt 1+800 1+806 R/S 6 8 0.200 6.000 7 3 126.000 0.395 49.770 0.050
Distrubuction Bar Overlap mt 1+800 1+806 R/S 6 8 0.200 0.400 29 -1 -5.800 0.395 -2.291 -0.002

HYSD Bar For Draim Main Bar mt 1+816 1+891 R/S 75 10 0.150 3.850 500 1 1925.000 0.617 1188.272 1.188 U
HYSD Bar For Draim Main Bar mt 1+816 1+891 R/S 75 10 0.150 1.550 500 1 775.000 0.617 478.395 0.478 L
Distrubuction Bar For Raft mt 1+816 1+891 R/S 75 8 0.200 75.000 8 1 600.000 0.395 237.000 0.237 -
Distrubuction Bar For Wall mt 1+816 1+891 R/S 75 8 0.200 75.000 7 3 1575.000 0.395 622.125 0.622
Distrubuction Bar Overlap mt 1+816 1+891 R/S 75 8 0.200 0.400 29 5 60.900 0.395 24.056 0.024

HYSD Bar For Draim Main Bar mt 1+896 1+901 R/S 5 10 0.150 3.850 33 1 128.333 0.617 79.218 0.079 U
HYSD Bar For Draim Main Bar mt 1+896 1+901 R/S 5 10 0.150 1.550 33 1 51.667 0.617 31.893 0.032 L
Distrubuction Bar For Raft mt 1+896 1+901 R/S 5 8 0.200 5.000 8 1 40.000 0.395 15.800 0.016 -
Distrubuction Bar For Wall mt 1+896 1+901 R/S 5 8 0.200 5.000 7 3 105.000 0.395 41.475 0.041
Distrubuction Bar Overlap mt 1+896 1+901 R/S 5 8 0.200 0.400 29 -1 -6.767 0.395 -2.673 -0.003

HYSD Bar For Draim Main Bar mt 1+910 2+045 R/S 135 10 0.150 3.850 900 1 3465.000 0.617 2138.889 2.139 U
HYSD Bar For Draim Main Bar mt 1+910 2+045 R/S 135 10 0.150 1.550 900 1 1395.000 0.617 861.111 0.861 L
Distrubuction Bar For Raft mt 1+910 2+045 R/S 135 8 0.200 135.000 8 1 1080.000 0.395 426.600 0.427 -
Distrubuction Bar For Wall mt 1+910 2+045 R/S 135 8 0.200 135.000 7 3 2835.000 0.395 1119.825 1.120
Distrubuction Bar Overlap mt 1+910 2+045 R/S 135 8 0.200 0.400 29 10 118.900 0.395 46.966 0.047
Approch
4 STR/PMN/2205 17/Aug/20 HYSD Bar For Draim Main Bar mt 8+600 C/W 15 12 0.150 4.500 100 1 450.000 0.617 277.778 0.278 U
HYSD Top Main Bar mt 8+600 C/W 15 12 0.150 2.100 100 1 210.000 0.617 129.630 0.130 U
HYSD Bar For Draim Main Bar mt 8+600 C/W 15 12 0.150 1.700 100 2 340.000 0.617 209.877 0.210 L
Distrubuction Bar For Raft mt 8+600 C/W 15 10 0.200 15.000 20 1 300.000 0.395 118.500 0.119 -
Distrubuction Bar For Wall mt 8+600 C/W 15 10 0.200 15.000 30 1 450.000 0.395 177.750 0.178 Approch

HYSD Bar For Draim Main Bar mt 6+790 6+798 R/S 8 12 0.150 4.500 53 1 240.000 0.617 148.148 0.148 U
HYSD Top Main Bar mt 6+790 6+798 R/S 8 12 0.150 2.100 53 1 112.000 0.617 69.136 0.069 U
HYSD Bar For Draim Main Bar mt 6+790 6+798 R/S 8 12 0.150 1.700 53 2 181.333 0.617 111.934 0.112 L
Distrubuction Bar For Raft mt 6+790 6+798 R/S 8 10 0.200 8.000 20 1 160.000 0.395 63.200 0.063 -
Distrubuction Bar For Wall mt 6+790 6+798 R/S 8 10 0.200 8.000 30 1 240.000 0.395 94.800 0.095 Approch

HYSD Bar For Draim Main Bar mt 1+806 1+816 R/S 10 12 0.150 4.500 67 1 300.000 0.617 185.185 0.185 U
HYSD Top Main Bar mt 1+806 1+816 R/S 10 12 0.150 2.100 67 1 140.000 0.617 86.420 0.086 U
HYSD Bar For Draim Main Bar mt 1+806 1+816 R/S 10 12 0.150 1.700 67 2 226.667 0.617 139.918 0.140 L
Distrubuction Bar For Raft mt 1+806 1+816 R/S 10 10 0.200 10.000 20 1 200.000 0.395 79.000 0.079 -
Distrubuction Bar For Wall mt 1+806 1+816 R/S 10 10 0.200 10.000 30 1 300.000 0.395 118.500 0.119 Approch

HYSD Bar For Draim Main Bar mt 1+901 1+910 R/S 9 12 0.150 4.500 60 1 270.000 0.617 166.667 0.167 U
HYSD Top Main Bar mt 1+901 1+910 R/S 9 12 0.150 2.100 60 1 126.000 0.617 77.778 0.078 U
HYSD Bar For Draim Main Bar mt 1+901 1+910 R/S 9 12 0.150 1.700 60 2 204.000 0.617 125.926 0.126 L
Distrubuction Bar For Raft mt 1+901 1+910 R/S 9 10 0.200 9.000 20 1 180.000 0.395 71.100 0.071 -
Distrubuction Bar For Wall mt 1+901 1+910 R/S 9 10 0.200 9.000 30 1 270.000 0.395 106.650 0.107 Approch
Slab
5 STR/PMN/2220 25/Aug/20 HYSD Bar For Draim Slab TOP mt 7+185 7+600 L/S 4.8 10 0.150 1.400 33 80 3696.000 0.617 2280.432 2.280
HYSD Bar For Draim Distribution mt 7+185 7+600 L/S 1.4 8 0.200 4.8 8 80 3072.000 0.395 1213.440 1.213
HYSD Bar For Draim Slab TOP mt 7+185 7+600 L/S 0.5 10 0.150 1.400 4 39 236.600 0.617 145.982 0.146
HYSD Bar For Draim Distribution mt 7+185 7+600 L/S 1.4 8 0.200 4.8 8 39 1497.600 0.395 591.552 0.592

6 STR/PMN/2232 6/Sep/20 HYSD Bar For Draim Slab TOP mt 9+925 +108 C/W 4.8 10 0.150 1.400 33 20 924.000 0.617 570.108 0.570
HYSD Bar For Draim Distribution mt 9+925 +108 C/W 1.4 8 0.200 4.8 8 20 768.000 0.395 303.360 0.303
HYSD Bar For Draim Slab TOP mt 9+925 +108 C/W 0.5 10 0.150 1.400 4 16 97.067 0.617 59.890 0.060
HYSD Bar For Draim Distribution mt 9+925 +108 C/W 1.4 8 0.200 4.8 8 16 614.400 0.395 242.688 0.243
HYSD Bar For Draim Slab TOP mt 3+840 4+270 R/S 0.3 10 0.150 1.400 3 1 4.200 0.617 2.591 0.003
HYSD Bar For Draim Distribution mt 3+840 4+270 R/S 1.4 8 0.200 4.8 8 1 38.400 0.395 15.168 0.015

HYSD Bar For Draim Slab TOP mt 9+900 9+925 R/S 4.8 10 0.150 1.400 33 4 184.800 0.617 114.022 0.114
HYSD Bar For Draim Distribution mt 9+900 9+925 R/S 1.4 8 0.200 4.8 8 4 153.600 0.395 60.672 0.061
HYSD Bar For Draim Slab TOP mt 9+900 9+925 R/S 0.5 10 0.150 1.400 4 9 54.600 0.617 33.688 0.034
HYSD Bar For Draim Distribution mt 9+900 9+925 R/S 1.4 8 0.200 4.8 8 9 345.600 0.395 136.512 0.137

7 STR/PMN/2240 10/Sep/20 HYSD Bar For Draim Slab TOP mt 8+670 8+700 L/S 4.8 10 0.150 1.400 33 5 231.000 0.617 142.527 0.143
HYSD Bar For Draim Distribution mt 8+670 8+700 L/S 1.4 8 0.200 4.8 8 5 192.000 0.395 75.840 0.076
HYSD Bar For Draim Slab TOP mt 8+670 8+700 L/S 0.5 10 0.150 1.400 4 9 54.600 0.617 33.688 0.034
HYSD Bar For Draim Distribution mt 8+670 8+700 L/S 1.4 8 0.200 4.8 8 9 345.600 0.395 136.512 0.137

HYSD Bar For Draim Slab TOP mt 6+700 6+790 R/S 4.8 10 0.150 1.400 33 15 693.000 0.617 427.581 0.428
HYSD Bar For Draim Distribution mt 6+700 6+790 R/S 1.4 8 0.200 4.8 8 15 576.000 0.395 227.520 0.228
HYSD Bar For Draim Slab TOP mt 6+700 6+790 R/S 0.5 10 0.150 1.400 4 16 97.067 0.617 59.890 0.060
HYSD Bar For Draim Distribution mt 6+700 6+790 R/S 1.4 8 0.200 4.8 8 16 614.400 0.395 242.688 0.243

8 STR/PMN/2270 21/Sep/20 HYSD Bar For Draim Slab TOP mt 6+798 6+900 R/S 4.8 10 0.150 1.400 33 19 877.800 0.617 541.603 0.542
HYSD Bar For Draim Distribution mt 6+798 6+900 R/S 1.4 8 0.200 4.8 8 19 729.600 0.395 288.192 0.288
HYSD Bar For Draim Slab TOP mt 6+798 6+900 R/S 0.5 10 0.150 1.400 4 15 91.000 0.617 56.147 0.056
HYSD Bar For Draim Distribution mt 6+798 6+900 R/S 1.4 8 0.200 4.8 8 15 576.000 0.395 227.520 0.228

HYSD Bar For Draim Slab TOP mt 1+800 1+806 R/S 5.8 10 0.150 1.400 40 1 55.533 0.617 34.264 0.034
HYSD Bar For Draim Distribution mt 1+800 1+806 R/S 1.4 8 0.200 5.8 8 1 46.400 0.395 18.328 0.018

HYSD Bar For Draim Slab TOP mt 1+816 1+891 R/S 4.8 10 0.150 1.400 33 14 646.800 0.617 399.076 0.399
HYSD Bar For Draim Distribution mt 1+816 1+891 R/S 1.4 8 0.200 4.8 8 14 537.600 0.395 212.352 0.212
HYSD Bar For Draim Slab TOP mt 1+816 1+891 R/S 0.5 10 0.150 1.400 4 10 60.667 0.617 37.431 0.037
HYSD Bar For Draim Distribution mt 1+816 1+891 R/S 1.4 8 0.200 4.8 8 10 384.000 0.395 151.680 0.152
HYSD Bar For Draim Slab TOP mt 3+840 4+270 R/S 0.3 10 0.150 1.400 3 1 4.200 0.617 2.591 0.003
HYSD Bar For Draim Distribution mt 3+840 4+270 R/S 1.4 8 0.200 4.8 8 1 38.400 0.395 15.168 0.015

HYSD Bar For Draim Slab TOP mt 1+896 1+901 R/S 4.8 10 0.150 1.400 33 1 46.200 0.617 28.505 0.029
HYSD Bar For Draim Distribution mt 1+896 1+901 R/S 1.4 8 0.200 4.8 8 1 38.400 0.395 15.168 0.015

HYSD Bar For Draim Slab TOP mt 1+910 2+045 R/S 4.8 10 0.150 1.400 33 25 1155.000 0.617 712.635 0.713
HYSD Bar For Draim Distribution mt 1+910 2+045 R/S 1.4 8 0.200 4.8 8 25 960.000 0.395 379.200 0.379
HYSD Bar For Draim Slab TOP mt 1+910 2+045 R/S 0.5 10 0.150 1.400 4 21 127.400 0.617 78.606 0.079
HYSD Bar For Draim Distribution mt 1+910 2+045 R/S 1.4 8 0.200 4.8 8 21 806.400 0.395 318.528 0.319

HYSD Bar For Approch Drain Slab


9 STR/PMN/2223 26/Aug/20 mt 8+600 C/W 15 12 0.150 2.100 101 2 424.200 0.889 377.114 0.377
TOP
HYSD Bar For Approch Drain
mt 1.7 10 0.200 7.4 10 2 140.600 0.617 86.750 0.087
Distribution

HYSD Bar For Approch Drain Slab


mt 6+790 6+798 R/S 8.0 12 0.150 2.100 54 2 228.200 0.889 202.870 0.203
TOP
HYSD Bar For Approch Drain
mt 1.7 10 0.200 7.4 10 2 140.600 0.617 86.750 0.087
Distribution

HYSD Bar For Approch Drain Slab


mt 1+806 1+816 R/S 10.0 12 0.150 2.100 68 2 284.200 0.889 252.654 0.253
TOP
HYSD Bar For Approch Drain
mt 1.7 10 0.200 7.4 10 2 140.600 0.617 86.750 0.087
Distribution

HYSD Bar For Approch Drain Slab


mt 1+901 1+910 R/S 9.0 12 0.150 2.100 61 2 256.200 0.889 227.762 0.228
TOP
HYSD Bar For Approch Drain
mt 1.7 10 0.200 7.4 10 2 140.600 0.617 86.750 0.087
Distribution

THIS BILL QTY 48.305 A

UP TO PREVIOUS QTY 483.821 B

UP TO DATE TOTAL QTY 532.126 A+B


MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-12.8(B)


Providing and laying plain cement concrete in open foundation / including from work suttering etc. complete as per drawing and technical
specifiation and as per relevant claues of section , 1500, 1700, 2100,with PCC Grade M-20.
(i)PCC Grade M20
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From
1 STR/PMN/2236 8/Sep/20 Return Wall Base Portion Cum 5+510 D/S 2 5.000 3.400 0.300 10.200
01 st Lift of Return Wall Cum 5+510 D/S 2 5.000 2.800 1.000 28.000
2 STR/PMN/2251 16/Sep/20 02 nd Lift of Return Wall Cum 5+510 D/S 2 5.000 1.514 1.200 18.168
3 STR/PMN/2277 24/Sep/20 03 rd Lift of Return Wall Cum 5+510 D/S 2 5.000 1.057 1.320 13.952
4 STR/PMN/2286 28/Sep/20 04 th Lift of Return Wall Cum 5+510 D/S 2 5.000 0.450 1.000 4.500
STR/PMN/2228 29/Aug/20 1st Lift of Protaction Wall Cum 3+400 C/W 1 4.800 1.430 1.200 8.237
1st Lift of Protaction Wall Cum 3+460 C/W 1 4.800 1.430 1.200 8.237
5 STR/PMN/2235 8/Sep/20 2nd Lift of Protaction Wall Cum 3+400 C/W 1 4.800 1.030 1.200 5.933
2nd Lift of Protaction Wall Cum 3+460 C/W 1 4.800 1.030 1.200 5.933
6 STR/PMN/2244 13/Sep/20 3rd Lift of Protaction Wall Cum 3+400 C/W 1 4.800 0.630 1.200 3.629
3rd Lift of Protaction Wall Cum 3+460 C/W 1 4.800 0.630 1.200 3.629
7 STR/PMN/2256 18/Sep/20 4th Lift of Protaction Wall Cum 3+400 C/W 1 4.800 0.365 0.500 0.876
4th Lift of Protaction Wall Cum 3+460 C/W 1 4.800 0.365 0.500 0.876

THIS BILL QTY 112.17 A


UP TO PREVIOUS QTY 2320.57 B
UP TO DATE TOTAL QTY 2432.74 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.- 14.4 (NON BOQ)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications and as per
relevant clauses of sections 1500 , 1700 and Clause 2702 of specifications
.RCC Grade M-30
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2292 30/Sep/20 wearing coat M-30 For Slab Portion Cum 5+510 C/W 1 2.84 25.00 0.075 5.33
2 STR/PMN/2290 29/Sep/20 wearing coat M-30 For Slab Portion Cum 5+150 C/W 1 10.00 21.00 0.075 15.75

THIS BILL QTY 21.08 A


UP TO PREVIOUS QTY 70.47 B
UP TO DATE TOTAL QTY 91.54 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925
Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-(NON BOQ) 6.1
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate
conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after
blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length
construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic
sensor, compacting with 810 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect
DLC
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1311 10/Sep/20 DLC Laying Cum 5+800 5+809 C/W 1 9.00 5.80 0.100 5.22
DLC Laying Cum Flaring L/S 1 10.00 4.50 0.100 4.50
DLC Laying Cum Flaring R/S 1 20.00 3.20 0.100 6.40
DLC Laying Cum 5+809 5+819 C/W 1 10.00 5.95 0.100 5.95
DLC Laying Cum 5+819 5+829 C/W 1 10.00 5.40 0.100 5.40
DLC Laying Cum 5+829 5+839 C/W 1 10.00 5.85 0.100 5.85
DLC Laying Cum 5+839 5+847 C/W 1 8.00 9.70 0.100 7.76
DLC Laying Cum 5+847 5+857 C/W 1 10.00 9.00 0.100 9.00
DLC Laying Cum 5+857 5+873 C/W 1 16.00 5.60 0.100 8.96
2 HW/PMN/1360 1/Oct/20 DLC Laying Cum 5+513 5+523 C/W 1 10.00 10.60 0.100 10.60
DLC Laying Cum 5+523 5+533 C/W 1 10.00 10.85 0.100 10.85
DLC Laying Cum 5+533 5+543 C/W 1 10.00 10.95 0.100 10.95
DLC Laying Cum 5+543 5+553 C/W 1 10.00 11.10 0.100 11.10
DLC Laying Cum 5+553 5+560 C/W 1 7.00 11.30 0.100 7.91
DLC Laying Cum 5+560 5+570 C/W 1 10.00 11.55 0.100 11.55
DLC Laying Cum 5+570 5+580 C/W 1 10.00 11.65 0.100 11.65
DLC Laying Cum 5+580 5+590 C/W 1 10.00 11.70 0.100 11.70
DLC Laying Cum 5+590 5+600 C/W 1 10.00 11.80 0.100 11.80
DLC Laying Cum 5+600 5+610 C/W 1 10.00 11.80 0.100 11.80
DLC Laying Cum CENTER C/W 1 6.60 5.90 0.100 3.89
3 HW/PMN/1377 8/Oct/20 DLC Laying Cum Junction Ch- 0+00 R/S 1 2.70 4.70 0.100 1.27
DLC Laying Cum Junction Ch- 0+00 R/S 1 5.00 10.20 0.100 5.10
DLC Laying Cum Junction Ch- 0+00 R/S 1 6.00 14.65 0.100 8.79
DLC Laying Cum Junction Ch- 0+00 R/S 1 5.00 10.50 0.100 5.25
DLC Laying Cum Junction Ch- 0+00 R/S 1 10.00 14.10 0.100 14.10
DLC Laying Cum Junction Ch- 0+00 R/S 1 8.00 6.35 0.100 5.08
DLC Laying Cum Junction Ch- 0+00 R/S 1 9.00 7.25 0.100 6.53
DLC Laying Cum Junction Ch- 0+00 R/S 1 12.00 6.50 0.100 7.80
DLC Laying Cum Temple 5+500 C/W 1 11.10 4.90 0.100 5.44

THIS BILL QTY 232.20 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 232.20 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925
Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-(NON BOQ) 6.3
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base
with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing
plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation
including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant,
debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of
section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc

PQC
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1320 15/Sep/20 PQC Laying Cum 5+800 5+809 C/W 1 9.00 5.80 0.300 15.66
PQC Laying Cum Flaring L/S 1 10.00 5.80 0.300 17.40
PQC Laying Cum Flaring R/S 1 20.00 5.80 0.300 34.80
PQC Laying Cum 5+809 5+819 C/W 1 10.00 5.95 0.300 17.85
PQC Laying Cum 5+819 5+829 C/W 1 10.00 5.40 0.300 16.20
PQC Laying Cum 5+829 5+839 C/W 1 10.00 5.85 0.300 17.55
PQC Laying Cum 5+839 5+847 C/W 1 8.00 9.70 0.300 23.28
PQC Laying Cum 5+847 5+857 C/W 1 10.00 9.00 0.300 27.00
PQC Laying Cum 5+857 5+873 C/W 1 16.00 5.60 0.300 26.88
2 HW/PMN/1369 5/Oct/20 PQC Laying Cum 5+513 5+523 C/W 1 10.00 10.60 0.300 31.80
PQC Laying Cum 5+523 5+533 C/W 1 10.00 10.85 0.300 32.55
PQC Laying Cum 5+533 5+543 C/W 1 10.00 10.95 0.300 32.85
PQC Laying Cum 5+543 5+553 C/W 1 10.00 11.10 0.300 33.30
PQC Laying Cum 5+553 5+560 C/W 1 7.00 11.30 0.300 23.73
PQC Laying Cum 5+560 5+570 C/W 1 10.00 11.55 0.300 34.65
PQC Laying Cum 5+570 5+580 C/W 1 10.00 11.65 0.300 34.95
PQC Laying Cum 5+580 5+590 C/W 1 10.00 11.70 0.300 35.10
PQC Laying Cum 5+590 5+600 C/W 1 10.00 11.80 0.300 35.40
PQC Laying Cum 5+600 5+610 C/W 1 10.00 11.80 0.300 35.40
PQC Laying Cum CENTER C/W 1 6.60 5.90 0.300 11.68
3 HW/PMN/1385 10/Oct/20 PQC Laying Cum Junction C/W 1 2.70 4.70 0.300 3.81
PQC Laying Cum Junction C/W 1 5.00 10.20 0.300 15.30
PQC Laying Cum Junction C/W 1 6.00 14.65 0.300 26.37
PQC Laying Cum Junction C/W 1 5.00 10.50 0.300 15.75
PQC Laying Cum Junction C/W 1 10.00 14.10 0.300 42.30
PQC Laying Cum Junction C/W 1 8.00 6.35 0.300 15.24
PQC Laying Cum Junction Ch- 0+00 R/S 1 9.00 6.35 0.300 17.15
PQC Laying Cum Junction Ch- 0+00 R/S 1 12.00 6.35 0.300 22.86
PQC Laying Cum Temple 5+500 C/W 1 11.10 4.90 0.300 16.32

THIS BILL QTY 713.12 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 713.12 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work : 4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co. Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-12.31
Supplying fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical specification and as per relevant clauses of section 1600

Chainage No. Of Cutting No. of


S.N. RFI No. Date DESCRIPTION Unit Side Length
Panal
Width Dia Specing
Length Bar
Total Length Unit Wt./Kg Qty (In Kg) Qty (In MT) Remark
From To
Road ( Parsona to Nigahi )
1 HW/PMN/1320 15/Sep/20 Mild Steel For PQC mt 5+800 5+809 C/W 9.0 2.0 5.8 32 0.300 0.500 19 19.333 6.320 122.187 0.122

Mild Steel For PQC mt Flaring C/W 10.0 2.2 5.8 32 0.300 0.500 19 21.481 6.320 135.763 0.136

Mild Steel For PQC mt Flaring C/W 20.0 4.4 5.8 32 0.300 0.500 19 42.963 6.320 271.526 0.272

Mild Steel For PQC mt 5+809 5+819 C/W 10.0 2.2 6.0 32 0.300 0.500 20 22.037 6.320 139.274 0.139

Mild Steel For PQC mt 5+819 5+829 C/W 10.0 2.2 5.4 32 0.300 0.500 18 20.000 6.320 126.400 0.126

Mild Steel For PQC mt 5+829 5+839 C/W 10.0 2.2 5.9 32 0.300 0.500 20 21.667 6.320 136.933 0.137

Mild Steel For PQC mt 5+839 5+847 C/W 8.0 1.8 9.7 32 0.300 0.500 32 28.741 6.320 181.641 0.182

Mild Steel For PQC mt 5+847 5+857 C/W 10.0 2.2 9.0 32 0.300 0.500 30 33.333 6.320 210.667 0.211

Mild Steel For PQC mt 5+857 5+873 C/W 16.0 3.6 6 32 0.300 0.500 19 33.185 6.320 209.730 0.210

2 HW/PMN/1369 5/Oct/20 Mild Steel For PQC mt 5+513 5+523 C/W 10.0 2.2 11 32 0.300 0.500 35 39.259 6.320 248.119 0.248

Mild Steel For PQC mt 5+523 5+533 C/W 10.0 2.2 11 32 0.300 0.500 36 40.185 6.320 253.970 0.254

Mild Steel For PQC mt 5+533 5+543 C/W 10.0 2.2 11 32 0.300 0.500 37 40.556 6.320 256.311 0.256

Mild Steel For PQC mt 5+543 5+553 C/W 10.0 2.2 11 32 0.300 0.500 37 41.111 6.320 259.822 0.260

Mild Steel For PQC mt 5+553 5+560 C/W 7.0 1.6 11 32 0.300 0.500 38 29.296 6.320 185.153 0.185

Mild Steel For PQC mt 5+560 5+570 C/W 10.0 2.2 12 32 0.300 0.500 39 42.778 6.320 270.356 0.270

Mild Steel For PQC mt 5+570 5+580 C/W 10.0 2.2 12 32 0.300 0.500 39 43.148 6.320 272.696 0.273

Mild Steel For PQC mt 5+580 5+590 C/W 10.0 2.2 12 32 0.300 0.500 39 43.333 6.320 273.867 0.274

Mild Steel For PQC mt 5+590 5+600 C/W 10.0 2.2 12 32 0.300 0.500 39 43.704 6.320 276.207 0.276

Mild Steel For PQC mt 5+600 5+610 C/W 10.0 2.2 12 32 0.300 0.500 39 43.704 6.320 276.207 0.276

Mild Steel For PQC mt CENTER C/W 6.60 1.5 6 32 0.300 0.500 20 14.422 6.320 91.148 0.091

3 HW/PMN/1385 10/Oct/20 Mild Steel For PQC mt Junction C/W 2.70 0.6 5 32 0.300 0.500 16 4.700 6.320 29.704 0.030

Mild Steel For PQC mt Junction C/W 5.00 1.1 10 32 0.300 0.500 34 18.889 6.320 119.378 0.119

Mild Steel For PQC mt Junction C/W 6.00 1.3 15 32 0.300 0.500 49 32.556 6.320 205.751 0.206

Mild Steel For PQC mt Junction C/W 5.00 1.1 11 32 0.300 0.500 35 19.444 6.320 122.889 0.123

Mild Steel For PQC mt Junction C/W 10.00 2.2 14 32 0.300 0.500 47 52.222 6.320 330.044 0.330

Mild Steel For PQC mt Junction C/W 8.00 1.8 6 32 0.300 0.500 21 18.815 6.320 118.910 0.119

Mild Steel For PQC mt Junction C/W 9.00 2.0 6 32 0.300 0.500 21 21.167 6.320 133.773 0.134

Mild Steel For PQC mt Junction C/W 12.00 2.7 6 32 0.300 0.500 21 28.222 6.320 178.364 0.178

Mild Steel For PQC mt Temple 5+500 C/W 11.10 2.5 5 32 0.300 0.500 16 20.144 6.320 127.313 0.127

A
THIS BILL QTY 5.564
B
UP TO PREVIOUS QTY 29.410
A+B
UP TO DATE TOTAL QTY 34.974
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. :08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-14.10


PCC - M-15 grade leveling corce blow approch Salab compacte as per drowing and techanical specfaction and as per relvent clouse of saction
1700
.PCC Grade M-15
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2252 16/Sep/20 PCC. Approch Slab Cum 5+150 B/S 2 3.60 21.10 0.150 22.79
2 STR/PMN/2282 26/Sep/20 PCC. Approch Slab Cum 5+510 B/S 2 3.60 25.10 0.150 27.11

THIS BILL QTY 49.90 A


UP TO PREVIOUS QTY 58.32 B
UP TO DATE TOTAL QTY 108.22 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925
Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.-14.11
Reinforced cement concrete approach slab (Grade of concrere M 30) including reinforcement and formwork complete as per drawing and
Technical specification and as per relevant clauses of section 1500, 1600, 1700 and clause 2704 of specifications
.RCC Grade M-30
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2278 24/Sep/20 RCC. Approch Slab Cum 5+150 B/S 2 3.50 21.00 0.300 44.10
2 STR/PMN/2289 29/Sep/20 RCC. Approch Slab Cum 5+510 B/S 2 3.50 25.00 0.300 52.50

THIS BILL QTY 96.60 A


UP TO PREVIOUS QTY 113.40 B
UP TO DATE TOTAL QTY 210.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.- 15.4 (a)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as
per drawing and Technical specifications

Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2269 21/Sep/20 Pitching on slopes Cum 5+025 5+040 L/S 1 15.00 9.15 0.300 41.18 Minor Bridge
Pitching on slopes Cum 5+040 5+055 L/S 1 15.00 9.10 0.300 40.95 Minor Bridge
Pitching on slopes Cum 5+055 5+070 L/S 1 15.00 9.10 0.300 40.95 Minor Bridge
Pitching on slopes Cum 5+070 5+085 L/S 1 15.00 9.20 0.300 41.40 Minor Bridge
Pitching on slopes Cum 5+085 5+100 L/S 1 15.00 9.50 0.300 42.75 Minor Bridge
2 STR/PMN/2283 26/Sep/20 Pitching on slopes Cum 5+100 5+115 L/S 1 15.00 10.15 0.300 45.68 Minor Bridge
Pitching on slopes Cum 5+115 5+130 L/S 1 15.00 10.35 0.300 46.58 Minor Bridge
Pitching on slopes Cum 5+130 5+135 L/S 1 5.00 9.25 0.300 13.88 Minor Bridge
Pitching on slopes Cum 5+135 5+145 L/S 1 10.00 10.05 0.300 30.15 Minor Bridge
3 STR/PMN/2253 16/Sep/20 Pitching on slopes Cum 3+460 3+466 L/S 1 5.80 7.45 0.300 12.96 Major Bridge
Pitching on slopes Cum 3+466 3+471 L/S 1 5.00 7.65 0.300 11.48 Major Bridge
Pitching on slopes Cum 3+471 3+476 L/S 1 5.00 8.10 0.300 12.15 Major Bridge
Pitching on slopes Cum 3+476 3+481 L/S 1 5.00 7.98 0.300 11.97 Major Bridge

THIS BILL QTY 392.06 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 392.06 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.- 15.5
Providing and laying Filter material underneath pitching in slopes
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2268 21/Sep/20 Filter material pitching Cum 5+025 5+040 L/S 1 15.00 9.15 0.150 20.59 Minor Bridge
Filter material pitching Cum 5+040 5+055 L/S 1 15.00 9.10 0.150 20.48 Minor Bridge
Filter material pitching Cum 5+055 5+070 L/S 1 15.00 9.10 0.150 20.48 Minor Bridge
Filter material pitching Cum 5+070 5+085 L/S 1 15.00 9.20 0.150 20.70 Minor Bridge
Filter material pitching Cum 5+085 5+100 L/S 1 15.00 9.50 0.150 21.38 Minor Bridge
2 STR/PMN/2280 26/Sep/20 Filter material pitching Cum 5+100 5+115 L/S 1 15.00 10.15 0.150 22.84 Minor Bridge
Filter material pitching Cum 5+115 5+130 L/S 1 15.00 9.50 0.150 21.38 Minor Bridge
Filter material pitching Cum 5+130 5+135 L/S 1 5.00 9.25 0.150 6.94 Minor Bridge
Filter material pitching Cum 5+135 5+145 L/S 1 10.00 9.25 0.150 13.88 Minor Bridge
3 STR/PMN/2249 16/Sep/20 Filter material pitching Cum 3+460 3+466 L/S 1 5.80 7.45 0.150 6.48 Major Bridge
Filter material pitching Cum 3+466 3+471 L/S 1 5.00 6.65 0.150 4.99 Major Bridge
Filter material pitching Cum 3+471 3+476 L/S 1 5.00 8.10 0.150 6.08 Major Bridge
Filter material pitching Cum 3+476 3+481 L/S 1 5.00 7.98 0.150 5.99 Major Bridge

THIS BILL QTY 192.17 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 192.17 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-13.10


Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification and as perrelevant clauses 305 of specifications and as
per appendix 6 of IRC-78.
Granular material
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To

STR/PMN/2216 21/Aug/20 Abutment & Return


1 5+150 B/S 2 21 2.6 8.31 907.45
Deduction of filter media -2 13.2 0.6 3.52 -55.76
2 STR/PMN/2287 29/Sep/20 Abutment & Return 5+510 B/S 2 25 2.5 4.87 608.75
Deduction of filter media -2 25 0.6 1.42 -42.60

THIS BILL QTY 1417.85 A


UP TO PREVIOUS QTY 1704.09 B
UP TO DATE TOTAL QTY 3121.93 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-13.11


Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH
specifications to a thickness of not less than 600 mm with aller size towards the soil and bigger size towards the wall and provided over the entire surface
behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

Filter media
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2114 13/Jun/20 Filter media For Return Wall Cum 7+180 B/S 4 5.00 0.6 1.42 17.04
2 STR/PMN/2121 15/Jun/20 Filter media For Return Wall Cum 9+340 B/S 4 5.00 0.6 1.42 17.04
3 STR/PMN/2144 24/Jun/20 Filter media For Return Wall Cum 5+150 B/S 4 7.80 0.6 3.52 65.89
4 STR/PMN/2217 22/Aug/20 Filter media Cum 5+150 B/S 2 13.2 0.6 3.52 55.76
5 STR/PMN/2295 30/Sep/20 Filter media For Return Wall Cum 5+510 B/S 4 5.00 0.6 1.42 17.04
6 STR/PMN/2288 29/Sep/20 Filter media Cum 5+510 B/S 2 25.0 0.6 1.42 42.60

THIS BILL QTY 215.37 A

UP TO PREVIOUS QTY 149.06 B

UP TO DATE TOTAL QTY 364.44 A+B


MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED

Name of Work : 4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co. Satna


Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.-NON-BOQ 9.2 (A)


Layning Rainforcment Cement Concrete Pipe NP4/prestrssed Concrete pipe on first class bedding in singal row. Providing and laying Reinforced cement
concrete pipe NP4 / prestrssed concrete pipe for culvert on first class bedding of grangular material ( cost of bedding included ) in single row
including fixing collar with cement motar 1:2 but excluding excavation , protection work , back filling , concrete and masonary work in head walls
and parapets.1000 mm Dia .
1000 mm Dia Pipe NP4
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From
1 STR/PMN/514 16/Dec/18 Pipe Laying 1000dia RMT 0+850 C/W 5 2.500 12.50
2 STR/PMN/529 18/Dec/18 Pipe Laying 1000dia RMT 2+050 C/W 4 2.500 10.00
3 STR/PMN/591 29/Dec/18 Pipe Laying 1000dia RMT 2+345 C/W 4 2.500 10.00
4 STR/PMN/592 29/Dec/18 Pipe Laying 1000dia RMT 3+840 C/W 4 2.500 10.00

This items is use in IPC-01 Becouse Payment are Not Paid For mprdc Bhopal Mesurmrnt Record For MB. No. …. Page No……..

THIS BILL QTY 42.50 A+B


UP TO PREVIOUS QTY 0.00
UP TO DATE TOTAL QTY 42.50
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.- 15.8 ( C )
Providing and laying Flooring complete as per drawing and Technical
C . Cement Concrete Grade M15
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2275 24/Sep/20 Flooring laying Cum 9+340 U/S 1 6.40 5.00 0.300 9.60
Flooring laying Cum 9+340 D/S 1 6.40 3.00 0.300 5.76

THIS BILL QTY 15.36 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 15.36 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.- 15.11
Flexible Apron :Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall.
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 STR/PMN/2285 28/Sep/20 flexible apron 1 m thick Cum 9+340 U/S 1 6.40 6.00 1.000 38.40
flexible apron 1 m thick Cum 9+340 D/S 1 6.40 3.00 1.000 19.20
2 STR/PMN/2294 30/Sep/20 flexible apron 1 m thick Cum 5+510 U/S 1 6.84 6.00 1.000 41.04
flexible apron 1 m thick Cum 5+510 D/S 1 6.84 3.00 1.000 20.52

THIS BILL QTY 119.16 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 119.16 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020
PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 8.11


Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfa

Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1330 20/Sep/20 Painting Two Coats Kerb Sqm 7+179 7+517 B/S 2 338 0.350 236.60
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 7+522 7+871 B/S 2 349 0.350 244.30
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 7+882 7+919 B/S 2 37 0.350 25.90
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 7+931 8+010 B/S 2 79 0.350 55.30
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
2 HW/PMN/1341 24/Sep/20 Painting Two Coats Kerb Sqm 8+010 8+640 B/S 2 630 0.550 693.00 TCS-IV
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 8+701 8+747 B/S 2 46 0.350 32.20
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 8+751 8+839 B/S 2 88 0.350 61.60
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 8+848 8+935 B/S 2 87 0.350 60.90
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 8+947 9+151 B/S 2 204 0.350 142.80
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
3 HW/PMN/1351 28/Sep/20 Painting Two Coats Kerb Sqm 9+158 9+321 B/S 2 163 0.350 114.10
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 9+359 9+449 B/S 2 90 0.350 63.00
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 9+455 9+502 B/S 2 47 0.350 32.90
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 9+521 9+747 B/S 2 226 0.350 158.20
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70
Painting Two Coats Kerb Sqm 9+757 9+859 B/S 2 102 0.350 71.40
Diduction For Crossing Sqm B/S -2 2 0.350 -1.40
Painting Two Coats Crossing Sqm B/S 2 3 0.450 2.70

THIS BILL QTY 2010.40 A


UP TO PREVIOUS QTY 0.00 B
UP TO DATE TOTAL QTY 2010.40 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925 Km)

Name of Contractor : M/s Shiv Shakti Construction Co., Satna

Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD

MEASUREMENT SHEET BOQ ITEM NO.- 11.2


Planting of Trees and their Maintenance for one year Planting of Trees by the road side (Avenue Trees) in 0.60m of holes, 1 m deep dug in the ground
, mixing the solid with decayed farm yard/sludge mannure, planting the saplings , backfilling the trench, watering and maintaining the plants for one
year
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1248 4/Aug/20 Planting of Trees Each 0+490 L/S 1 - - - 1.00
Planting of Trees Each 0+495 L/S 1 - - - 1.00
Planting of Trees Each 0+502 L/S 1 - - - 1.00
Planting of Trees Each 0+510 L/S 1 - - - 1.00
Planting of Trees Each 0+517 L/S 1 - - - 1.00
Planting of Trees Each 0+525 L/S 1 - - - 1.00
Planting of Trees Each 0+532 L/S 1 - - - 1.00
Planting of Trees Each 0+545 L/S 1 - - - 1.00
Planting of Trees Each 0+552 L/S 1 - - - 1.00
Planting of Trees Each 0+559 L/S 1 - - - 1.00
Planting of Trees Each 0+564 L/S 1 - - - 1.00
Planting of Trees Each 0+575 L/S 1 - - - 1.00
Planting of Trees Each 0+634 L/S 1 - - - 1.00
Planting of Trees Each 0+642 L/S 1 - - - 1.00
Planting of Trees Each 0+649 L/S 1 - - - 1.00
Planting of Trees Each 0+679 L/S 1 - - - 1.00
Planting of Trees Each 0+687 L/S 1 - - - 1.00
Planting of Trees Each 0+692 L/S 1 - - - 1.00
Planting of Trees Each 0+702 L/S 1 - - - 1.00
Planting of Trees Each 0+707 L/S 1 - - - 1.00
Planting of Trees Each 0+714 L/S 1 - - - 1.00
Planting of Trees Each 0+721 L/S 1 - - - 1.00
Planting of Trees Each 0+728 L/S 1 - - - 1.00
Planting of Trees Each 0+734 L/S 1 - - - 1.00
Planting of Trees Each 0+742 L/S 1 - - - 1.00
Planting of Trees Each 0+753 L/S 1 - - - 1.00
Planting of Trees Each 0+760 L/S 1 - - - 1.00
Planting of Trees Each 0+776 L/S 1 - - - 1.00
Planting of Trees Each 0+796 L/S 1 - - - 1.00
Planting of Trees Each 0+810 L/S 1 - - - 1.00
Planting of Trees Each 0+819 L/S 1 - - - 1.00
Planting of Trees Each 0+830 L/S 1 - - - 1.00
Planting of Trees Each 0+844 L/S 1 - - - 1.00
Planting of Trees Each 0+860 L/S 1 - - - 1.00
Planting of Trees Each 0+872 L/S 1 - - - 1.00
Planting of Trees Each 0+884 L/S 1 - - - 1.00
Planting of Trees Each 0+896 L/S 1 - - - 1.00
Planting of Trees Each 0+908 L/S 1 - - - 1.00
Planting of Trees Each 0+920 L/S 1 - - - 1.00
Planting of Trees Each 0+940 L/S 1 - - - 1.00
Planting of Trees Each 0+948 L/S 1 - - - 1.00
Planting of Trees Each 0+956 L/S 1 - - - 1.00
Planting of Trees Each 0+964 L/S 1 - - - 1.00
Planting of Trees Each 0+973 L/S 1 - - - 1.00
Planting of Trees Each 0+990 L/S 1 - - - 1.00
Planting of Trees Each 1+000 L/S 1 - - - 1.00
Planting of Trees Each 1+015 L/S 1 - - - 1.00
Planting of Trees Each 1+027 L/S 1 - - - 1.00
Planting of Trees Each 1+037 L/S 1 - - - 1.00
Planting of Trees Each 1+047 L/S 1 - - - 1.00
Planting of Trees Each 1+057 L/S 1 - - - 1.00
Planting of Trees Each 1+065 L/S 1 - - - 1.00
Planting of Trees Each 1+085 L/S 1 - - - 1.00
Planting of Trees Each 1+102 L/S 1 - - - 1.00
Planting of Trees Each 1+142 L/S 1 - - - 1.00
Planting of Trees Each 1+157 L/S 1 - - - 1.00
Planting of Trees Each 1+164 L/S 1 - - - 1.00
Planting of Trees Each 1+177 L/S 1 - - - 1.00
Planting of Trees Each 1+194 L/S 1 - - - 1.00
Planting of Trees Each 1+294 L/S 1 - - - 1.00
Planting of Trees Each 1+234 L/S 1 - - - 1.00
Planting of Trees Each 1+264 L/S 1 - - - 1.00
Planting of Trees Each 1+314 L/S 1 - - - 1.00
Planting of Trees Each 1+326 L/S 1 - - - 1.00
Planting of Trees Each 1+340 L/S 1 - - - 1.00
Planting of Trees Each 1+386 L/S 1 - - - 1.00
Planting of Trees Each 1+400 L/S 1 - - - 1.00
Planting of Trees Each 1+419 L/S 1 - - - 1.00
Planting of Trees Each 1+440 L/S 1 - - - 1.00
Planting of Trees Each 1+460 L/S 1 - - - 1.00
Planting of Trees Each 1+484 L/S 1 - - - 1.00
Planting of Trees Each 1+510 L/S 1 - - - 1.00
2 HW/PMN/1259 17/Aug/20 Planting of Trees Each 0+485 R/S 1 - - - 1.00
Planting of Trees Each 0+490 R/S 1 - - - 1.00
Planting of Trees Each 0+495 R/S 1 - - - 1.00
Planting of Trees Each 0+500 R/S 1 - - - 1.00
Planting of Trees Each 0+525 R/S 1 - - - 1.00
Planting of Trees Each 0+530 R/S 1 - - - 1.00
Planting of Trees Each 0+547 R/S 1 - - - 1.00
Planting of Trees Each 0+552 R/S 1 - - - 1.00
Planting of Trees Each 0+559 R/S 1 - - - 1.00
Planting of Trees Each 0+634 R/S 1 - - - 1.00
Planting of Trees Each 0+642 R/S 1 - - - 1.00
Planting of Trees Each 0+657 R/S 1 - - - 1.00
Planting of Trees Each 0+667 R/S 1 - - - 1.00
Planting of Trees Each 0+672 R/S 1 - - - 1.00
Planting of Trees Each 0+677 R/S 1 - - - 1.00
Planting of Trees Each 0+682 R/S 1 - - - 1.00
Planting of Trees Each 0+687 R/S 1 - - - 1.00
Planting of Trees Each 0+692 R/S 1 - - - 1.00
Planting of Trees Each 0+697 R/S 1 - - - 1.00
Planting of Trees Each 0+702 R/S 1 - - - 1.00
Planting of Trees Each 0+707 R/S 1 - - - 1.00
Planting of Trees Each 0+712 R/S 1 - - - 1.00
Planting of Trees Each 0+717 R/S 1 - - - 1.00
Planting of Trees Each 0+722 R/S 1 - - - 1.00
Planting of Trees Each 0+727 R/S 1 - - - 1.00
Planting of Trees Each 0+734 R/S 1 - - - 1.00
Planting of Trees Each 0+840 R/S 1 - - - 1.00
Planting of Trees Each 0+846 R/S 1 - - - 1.00
Planting of Trees Each 0+852 R/S 1 - - - 1.00
Planting of Trees Each 0+860 R/S 1 - - - 1.00
Planting of Trees Each 0+866 R/S 1 - - - 1.00
Planting of Trees Each 0+871 R/S 1 - - - 1.00
Planting of Trees Each 0+876 R/S 1 - - - 1.00
Planting of Trees Each 0+881 R/S 1 - - - 1.00
Planting of Trees Each 0+876 L/S 1 - - - 1.00
Planting of Trees Each 0+881 L/S 1 - - - 1.00
Planting of Trees Each 0+886 R/S 1 - - - 1.00
Planting of Trees Each 0+891 R/S 1 - - - 1.00
Planting of Trees Each 0+896 R/S 1 - - - 1.00
Planting of Trees Each 0+901 R/S 1 - - - 1.00
Planting of Trees Each 0+907 R/S 1 - - - 1.00
Planting of Trees Each 0+913 R/S 1 - - - 1.00
Planting of Trees Each 0+920 R/S 1 - - - 1.00
Planting of Trees Each 0+930 R/S 1 - - - 1.00
Planting of Trees Each 0+940 R/S 1 - - - 1.00
Planting of Trees Each 0+950 R/S 1 - - - 1.00
Planting of Trees Each 0+958 R/S 1 - - - 1.00
Planting of Trees Each 0+965 R/S 1 - - - 1.00
Planting of Trees Each 0+973 R/S 1 - - - 1.00
Planting of Trees Each 1+037 R/S 1 - - - 1.00
Planting of Trees Each 1+047 R/S 1 - - - 1.00
Planting of Trees Each 1+052 R/S 1 - - - 1.00
Planting of Trees Each 1+066 R/S 1 - - - 1.00
Planting of Trees Each 1+076 R/S 1 - - - 1.00
Planting of Trees Each 1+092 R/S 1 - - - 1.00
Planting of Trees Each 1+102 R/S 1 - - - 1.00
Planting of Trees Each 1+115 R/S 1 - - - 1.00
Planting of Trees Each 1+125 R/S 1 - - - 1.00
Planting of Trees Each 1+135 R/S 1 - - - 1.00
Planting of Trees Each 1+147 R/S 1 - - - 1.00
Planting of Trees Each 1+177 R/S 1 - - - 1.00
Planting of Trees Each 1+184 R/S 1 - - - 1.00
Planting of Trees Each 1+195 R/S 1 - - - 1.00
3 HW/PMN/1286 28/Aug/20 Planting of Trees Each 5+565 L/S 1 - - - 1.00
Planting of Trees Each 5+572 L/S 1 - - - 1.00
Planting of Trees Each 5+579 L/S 1 - - - 1.00
Planting of Trees Each 5+587 L/S 1 - - - 1.00
Planting of Trees Each 5+597 L/S 1 - - - 1.00
Planting of Trees Each 5+619 L/S 1 - - - 1.00
Planting of Trees Each 5+634 L/S 1 - - - 1.00
Planting of Trees Each 5+643 L/S 1 - - - 1.00
Planting of Trees Each 5+660 L/S 1 - - - 1.00
Planting of Trees Each 5+680 L/S 1 - - - 1.00
Planting of Trees Each 5+686 L/S 1 - - - 1.00
Planting of Trees Each 5+692 L/S 1 - - - 1.00
Planting of Trees Each 5+706 L/S 1 - - - 1.00
Planting of Trees Each 5+718 L/S 1 - - - 1.00
Planting of Trees Each 5+728 L/S 1 - - - 1.00
Planting of Trees Each 5+735 L/S 1 - - - 1.00
Planting of Trees Each 5+740 L/S 1 - - - 1.00

THIS BILL QTY 152.00 A

UP TO PREVIOUS QTY 0.00 B


UP TO DATE TOTAL QTY 152.00 A+B
MADHYA PRADESH ROAD DEVELOPMENT CORPORATION LIMITED
Name of Work :-4 Lanning of Prsona-Majan-Nigahi turn section from km.17.400 to 27.380 on Bargawan-Waidhan Road( total length-9.925
Km)
Name of Contractor : M/s Shiv Shakti Construction Co., Satna
Interim Payment Certificate No. : 08 PERIOD : 25 June 2020 To 10 Oct. 2020

PARSONA-MAJAN-NIGAHI ROAD
MEASUREMENT SHEET BOQ ITEM NO.- 11.3
Half Brick Circular Tree Guard in 2nd class Brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground
Half brick circular tree guard, in 2nd class brick, internal diametre 1.25 metres, and height 1.2 metres, above ground and 0.20 metre below ground,
bottom two courses laid dry, and top three courses in cement mortar 1:6 ( 1 cement 6 sand) and the intermediate courses being in dry honey comb
masonry, as per design complete
Chainage
S.N. RFI No. Date DESCRIPTION Unit Side No. Length Width Height Qty. Remark
From To
1 HW/PMN/1248 A 4/Aug/20 Half Brick Circular Tree Guard Each 0+490 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+495 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+502 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+510 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+517 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+525 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+532 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+545 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+552 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+559 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+564 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+575 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+634 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+642 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+649 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+679 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+687 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+692 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+702 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+707 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+714 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+721 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+728 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+734 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+742 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+753 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+760 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+776 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+796 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+810 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+819 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+830 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+844 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+860 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+872 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+884 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+896 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+908 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+920 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+940 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+948 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+956 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+964 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+973 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+990 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+000 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+015 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+027 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+037 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+047 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+057 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+065 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+085 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+102 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+142 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+157 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+164 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+177 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+194 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+294 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+234 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+264 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+314 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+326 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+340 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+386 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+400 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+419 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+440 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+460 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+484 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+510 L/S 1 - - - 1.00
2 HW/PMN/1259 A 17/Aug/20 Half Brick Circular Tree Guard Each 0+485 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+490 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+495 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+500 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+525 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+530 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+547 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+552 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+559 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+634 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+642 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+657 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+667 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+672 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+677 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+682 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+687 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+692 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+697 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+702 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+707 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+712 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+717 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+722 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+727 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+734 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+840 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+846 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+852 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+860 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+866 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+871 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+876 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+881 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+876 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+881 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+886 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+891 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+896 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+901 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+907 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+913 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+920 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+930 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+940 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+950 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+958 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+965 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 0+973 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+037 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+047 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+052 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+066 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+076 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+092 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+102 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+115 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+125 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+135 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+147 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+177 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+184 R/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 1+195 R/S 1 - - - 1.00
3 HW/PMN/1286 28/Aug/20 Half Brick Circular Tree Guard Each 5+565 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+572 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+579 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+587 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+597 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+619 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+634 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+643 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+660 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+680 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+686 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+692 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+706 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+718 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+728 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+735 L/S 1 - - - 1.00
Half Brick Circular Tree Guard Each 5+740 L/S 1 - - - 1.00

THIS BILL QTY 152.00 A

UP TO PREVIOUS QTY 0.00 B


UP TO DATE TOTAL QTY 152.00 A+B

You might also like