Sr.No Ref Clause Page no Tender conditions Queries/ Request Client Reply
ion
GENERAL
Extensio
Considering the quantum of the work and
n for
198 specialised items in the scope, request you to No Change
submissi
extend the date of submission by at least 45 days.
on
The recovery of the pipe already laid will be made on measurement rate
basis or
point rate basis or on actual expenditure basis which ever is on high side. In
case of Departmental work, 10% supervision charges shall also be added.
Conduit pipe where already laid for wiring purpose will be delivered to the
TECHANICAL contractor in absolutely clean condition with round inspection boxes duly
Pg 70, Point Please clarify whether project is already existing
199 CONDITION painted, covered and whole system tested. After the conduit system is It is a new project.
No. 1, 2 & 3 or in new building.
FOR EI WORK handed over to the contractor to whom the work is allotted, he will be
responsible for its upkeep.
During execution of work, if the contractor does not lay pipe and its
accessories in the slab within time prescribed by the Engineer-in-Charge of
the work, the Deptt. can then lay the said pipe-departmentally at contractors
risk and cost without operating the clause 2 and 3 of the contract agreement.
Pg 70, Point
Please Clarify "No Extra payment will be
200 No.8, 10, 11 No Change
made".
& 12
The contractor shall install the material from the list of approved electrical
Pg 70, Point Item Rate shall be as per actual, however rate
201 material appended in the NIT. Material not covered in the list will be used as No Change
No.13 analysis to be done as per DSR 2018 Format.
per DSR 2018, and CPWD.
BOQ
In this item
Item No
As per BOQ Excel 10HP / 12 HP is mentioned. wording Units 10
217 553 & VRV
Please calrify which Capacity to conern. HP 12 HP shall be
Spec. Pg
read as 12 HP.
NO 333
BOQ
Items from 645 to
Item No
In BOQ Specs are missing, wheather in PDF 650 are sub
218 645 & VRV
specs are their. Kindly clarfy which to follow. divisions of item
Spec. Pg
644 in BOQ.
NO 342
Descript
Sr.No Ref Clause Page no Tender conditions Queries/ Request Client Reply
ion
GENERAL
219 BMS Please provide the IO summary for the same. No Change