You are on page 1of 7

PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT

EQUIPMENT : METHANOL INJECTION PACKAGE


DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS
1 General
Quotation Number - Vendor to fill up
Revision - Vendor to fill up
Quotation Date - Vendor to fill up
Delivery Time weeks - Vendor to fill up
Delivery Point Up to site Vendor to fill up

2 Certificates
Material certificate Required Vendor to fill up
COO certificate Required Vendor to fill up
MIGAS certificate Required Vendor to fill up

3 Experiences
Client Required Vendor to fill up
Project Required Vendor to fill up
Country Required Vendor to fill up
Period 2018 - 2021 Vendor to fill up
Service Methanol Injection Package Vendor to fill up
Capacity Required Vendor to fill up

4 Scope of Work & Supply


Engineering
PFD and P&ID Required Vendor to fill up
General Arrangement Drawing Required Vendor to fill up
Detail Drawing Required Vendor to fill up
Assembly Drawing Required Vendor to fill up
Detail Specification Required Vendor to fill up
Equipment Data Sheet Required Vendor to fill up
Equipment Layout Required Vendor to fill up
Chemical Injection System Operation & Maintenance Procedure Required Vendor to fill up
Shop Drawing & As Build Drawing Required Vendor to fill up
Field Change Drawing Required Vendor to fill up
Loading Data Required Vendor to fill up
Load List Required Vendor to fill up
I/O List Required Vendor to fill up
Native File CAD Required Vendor to fill up
3D Model with SP3D Required Vendor to fill up
Installation Procedure & Commissioning Procedure Required Vendor to fill up
Final Data Book Required Vendor to fill up

Procurement
Portable Methanol Injection Package (ARN-51-ZZZ-520), consisting of:
Civil
Equipment steel structure / Chemical Injection Skid Required Vendor to fill up
Anchor bolt Required Vendor to fill up
Electrical
Panel / LCP / LCS Required Vendor to fill up
Cable form equipment to terminal box Required Vendor to fill up
Cable tray with cover Required Vendor to fill up
Electrical steel support Required Vendor to fill up
Conduit Required Vendor to fill up
Cable gland Required Vendor to fill up
Grounding Lug Required Vendor to fill up
Electrical bulk material for Installation until Commissioning Required Vendor to fill up
Instrument & Control
Field instrument Required Vendor to fill up
Field instrument calibration report / certificate Required Vendor to fill up
Cable & cable tray with cover Required Vendor to fill up
Cable gland Required Vendor to fill up
Junction Box + Cable duct Required Vendor to fill up
Steel support for cable tray and junction box Required Vendor to fill up
LCP Required Vendor to fill up
Consumable material Required Vendor to fill up
Bulk material Required Vendor to fill up
Continuity, loop check, function test Required Vendor to fill up
Pre-commissioning and Commissioning Required Vendor to fill up
PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT
EQUIPMENT : METHANOL INJECTION PACKAGE
DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS
Field instrument Required Vendor to fill up
PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT
EQUIPMENT : METHANOL INJECTION PACKAGE
DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS
Piping
Injection Quill Assembly (ARG-20-IQ-1503) Required Vendor to fill up
Injection Quill Assembly (NWR-20-IQ-1505) Required Vendor to fill up
All piping and acessories (fittings, bolts & nuts, washer, gasket, suctio Required Vendor to fill up
strainer, support & hanger, flange & counter flange, reducer, etc)
Mechanical
Methanol Injection Tank (ARN-51-MBJ-125) Required Vendor to fill up
Methanol Injection Pump (ARN-51-PZZ-342) Required Vendor to fill up

Delivery Condition and Transportation


Packing list of each equipment, including the spare parts Required Vendor to fill up
Internal protection from moisture (desiccant, etc.) and outer surface
Required Vendor to fill up
protection
All threaded connection shall be plugged Required Vendor to fill up
All flanged opening shall be protected with one-piece (1/2” thickness)
exterior grade polywood and shall be secured with a minimum of 4 bolts Required Vendor to fill up
with washers
Ocean freight or air freight Required (if any) Vendor to fill up
Inland transportation up to site Required Vendor to fill up
Unloading at Site Required Vendor to fill up

Installation Support
Man Power Required Vendor to fill up
Tools & Equipment
Worker Tools & Safety Equipment Required Vendor to fill up
Hand Tools and Special tools Required Vendor to fill up
Scaffolding Required Vendor to fill up
Testing equipment Required Vendor to fill up
Others (if any, to be stated) Required Vendor to fill up
Consumables
Temporary bolts and nut for erection Required Vendor to fill up
Seal Tape (Teflon Tape ) Required Vendor to fill up
Welding Electrode Required Vendor to fill up
Welding Wire Required Vendor to fill up
Industrial Gases (Oxygen, Acetylene, Argon, Propane) Required Vendor to fill up
Grinding Disc Required Vendor to fill up
Grease Required Vendor to fill up
Waste Cloth/Rags Required Vendor to fill up
Temporary Gaskets for hydrotest Required Vendor to fill up
Temporary blind flange for hydrotest Required Vendor to fill up
Material for Welder Qualification Test Required Vendor to fill up
Material for Welding Procedure Qualification Test Required Vendor to fill up
Fuels and Lubricants Required Vendor to fill up
Others (if any, to be stated) Required Vendor to fill up

Inspection & Qualification Test


Shop inspection & Report / include FAT for max. 5 persons Required Vendor to fill up
Material inspection Required Vendor to fill up
Fabrication inspection Required Vendor to fill up
Painting inspection Required Vendor to fill up
Site inspection & Report Required Vendor to fill up
Hydrotest Required Vendor to fill up
Leak Test Required Vendor to fill up
Performance Test Required Vendor to fill up
Function Test Required Vendor to fill up
WPS and PQR Required Vendor to fill up
Welding Procedure Qualification Test Required Vendor to fill up
Welder and/or Welding Operator Qualification Tests Required Vendor to fill up

Installation, Pre-commissioning, Commissioning & Reports Required Vendor to fill up

Painting
Shop painting Required Vendor to fill up
Touch-up painting Required Vendor to fill up
Internal Painting Required (if any) Vendor to fill up
External Painting Required Vendor to fill up

Spare parts and Consumables


For Installation Required Vendor to fill up
For Precommissioning & commissioning Required Vendor to fill up
For Start-up Required Vendor to fill up
For Two (2) Year Operational Required Vendor to fill up

Training
Class training Optional Vendor to fill up
PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT
EQUIPMENT : METHANOL INJECTION PACKAGE
DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS
Site training Optional Vendor to fill up
PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT
EQUIPMENT : METHANOL INJECTION PACKAGE
DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS
Transportation for Imported Material and Equipment
Transportation for Direct Imported Material Required Vendor to fill up
Transportation for Indirect Imported Material Required Vendor to fill up
Transportation for Imported Construction Equipment Required Vendor to fill up

Transportation for Local Materials


Transportation for Direct Local Material Required Vendor to fill up
Transportation for Indirect Local Material Required Vendor to fill up
Transportation for Local Construction Equipment Required Vendor to fill up

Temporary Facilities
Construction of temporary Office Required Vendor to fill up
Construction of temporary camp or housing Required Vendor to fill up
Telephone/fax/e-mail Required Vendor to fill up
Other temporary Utilities Required Vendor to fill up
Furniture for the aboves Required Vendor to fill up
Road, fence and others (if any to be stated) Required Vendor to fill up

Special Tools Required (if any) Vendor to fill up

5 Specification / Parameter / Requirements


5.1 Portable Methanol Injection Package
Tag number ARN-51-ZZZ-520 Vendor to fill up
Unit Chemical Injection System Vendor to fill up
Quantity set 1 Vendor to fill up

5.1.1 Methanol Injection Tank


Tag number ARN-51-MBJ-125 Vendor to fill up
Quantity unit 1 Vendor to fill up
Standard ASME Sect VIII Div 1 Vendor to fill up
Dimension VTA Vendor to fill up
Capacity ft3 65 Vendor to fill up
Orientation Vertical vessel Vendor to fill up
Design Temperature °F 150 Vendor to fill up
Design Pressure psig Full of liquid + 0.1 psig Vendor to fill up
Operating Temperature °F AMB Vendor to fill up
Operating Pressure psig VTA Vendor to fill up
Material SA 240-316L Vendor to fill up
Thickness in 3/8 (min.) Vendor to fill up
Piping Specification
Inlet
Size
Size inch VTA Vendor to fill up
Rating
Rating VTA Vendor to fill up
Standard
Standard VTA Vendor to fill up
Material
Rating VTA Vendor to fill up
Outlet
Size
Size inch VTA Vendor to fill up
Rating
Rating VTA Vendor to fill up
Standard
Standard VTA Vendor to fill up
Material VTA Vendor to fill up
Vent Required Vendor to fill up
Instrument Specification
Level Indicator
Quantity
Size unit VTA Vendor to fill up
Instrument
Rating Range ft VTA Vendor to fill up
Dial Size inch VTA Vendor to fill up
Size Inlet inch VTA Vendor to fill up
Size Outlet inch VTA Vendor to fill up
Level Transmitter
I/O
SizeType VTA Vendor to fill up
Signal
RatingType VDC VTA Vendor to fill up
Wire
Standard
Connection VTA Vendor to fill up
Methanol System Controller / Local Control Station
Enclosure type IP55 Vendor to fill up
Manual Start/Stop Button on LCS Required Vendor to fill up
Indicator for Running and Trip on LCS Required Vendor to fill up
Spare Indicator for Running and Trip on LCS to Control Room Required Vendor to fill up
Name Plate for Tank
SS 316 L Material Required Vendor to fill up
PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT
EQUIPMENT : METHANOL INJECTION PACKAGE
DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS

5.1.2 Methanol Injection Pump


Tag number ARN-51-PZZ-342 Vendor to fill up
Quantity unit 1 Vendor to fill up
Design Standard API 675 Vendor to fill up
Type Motor driven controlled volume Vendor to fill up
Pump Performance
Capacity (normal / rated) GPM 8.7 / 9.6 Vendor to fill up
Discharge Pressure (max.) psig 1800 Vendor to fill up
Head ft VTA Vendor to fill up
Speed rpm VTA Vendor to fill up
NPSHa m VTA Vendor to fill up
NPSHr m VTA Vendor to fill up
Efficiency % VTA Vendor to fill up
Power Absorbed kW VTA Vendor to fill up
Max Shut off head m VTA Vendor to fill up
Material
Cylinder / Case SS 316 Vendor to fill up
Diaphgram PTFE Vendor to fill up
Driver
Type Motor driven Vendor to fill up
Enclosure Type IP 55 Vendor to fill up
Voltage/Phase/Frequency Volt/ph/Hz 400/3/50 Vendor to fill up
Name Plate for Pump Required Vendor to fill up

5.1.3 Injection Quill Assembly (ARG-20-IQ-1503)


Tag number ARG-20-IQ-1503 Vendor to fill up
Quantity unit 1 Vendor to fill up
Injection Fluid Methanol Vendor to fill up
Piping Class 30CS1 (API 3000) Vendor to fill up
Size of Mating Flange inch 2 1/16 Vendor to fill up
End Connection RTJ Flange to API 3000 Vendor to fill up
Size of Pipe Header inch 3 1/8 Vendor to fill up
Schedule of Header TBA Vendor to fill up
Rating API 3000 Vendor to fill up
Dimension outer pipe to Flange Face TBA Vendor to fill up
Pressure Design psig 2220 Vendor to fill up
Temperature Design °F 185 Vendor to fill up
Material A 182 F316L Vendor to fill up

5.1.4 Injection Quill Assembly (NWR-20-IQ-1505)


Tag number NWR-20-IQ-1505 Vendor to fill up
Quantity unit 1 Vendor to fill up
Injection Fluid Methanol Vendor to fill up
Piping Class 30CS1 (API 3000) Vendor to fill up
Size of Mating Flange inch 2 1/16 Vendor to fill up
End Connection RTJ Flange to API 3000 Vendor to fill up
Size of Pipe Header inch 3 1/8 Vendor to fill up
Schedule of Header TBA Vendor to fill up
Rating API 3000 Vendor to fill up
Dimension outer pipe to Flange Face TBA Vendor to fill up
Pressure Design psig 2220 Vendor to fill up
Temperature Design °F 185 Vendor to fill up
Material A 182 F316L Vendor to fill up

6 Brand
Tank Manufacturer (as per AML) Vendor to fill up
Pump Manufacturer (as per AML) Vendor to fill up
Pipe Manufacturer (as per AML) Vendor to fill up
Fitting Manufacturer (as per AML) Vendor to fill up
Flange Manufacturer (as per AML) Vendor to fill up
Bolts and Nuts Manufacturer (as per AML) Vendor to fill up
Local Control Station Manufacturer (as per AML) Vendor to fill up
Instrumentation Manufacturer (as per AML) Vendor to fill up
Accessories Manufacturer (as per AML) Vendor to fill up

7 Document during proposal stage


PFD and P&ID Required Vendor to fill up
Equipment List Required Vendor to fill up
PROJECT : FLOWLINE, TRUNKLINE, DAN PIPELINE ARUNG NOWERA DEVELOPMENT
EQUIPMENT : METHANOL INJECTION PACKAGE
DOC NO.:FTP-MEC-TBE-002 REV.0
PT ADHI KARYA (Persero), Tbk. TECHNICAL CLARIFICATION SHEET PT MEDCO E&P INDONESIA

REQUIREMENT
No. REVIEW ITEM CONTRACT DOC. &
PROCESS DATA VENDOR NAME REMARKS
Data Sheet Required Vendor to fill up
General Arrangement Drawing Required Vendor to fill up
Catalogue Required Vendor to fill up
Spare Parts List Required Vendor to fill up
Breakdown Price Required Vendor to fill up
Loading Data Required Vendor to fill up
Equipment Layout Required Vendor to fill up
Resume Power Consumption List Required Vendor to fill up
Utility Consumption List Required Vendor to fill up
Operation and Maintenance Manual Required Vendor to fill up