Professional Documents
Culture Documents
1 Site Preparation/Mobilisasi
1 Site Preparation/Mobilisasi
1.a Mobilization and Demobilization
Excavator (PC 200) Unit 1
Excavator (PC 150) Unit 1
Concrete Pump Unit 2
Air Compressor Unit 1
Welding Equipment ls 1
Manpower ls 1
Other required equipment or resource ls 1
Please fill and add some rows if required Unit 1
NOTE :
1 All the rate has accommodated all requirements mentioned and stated on ITB Document (Technical, Qu
2 Productivity proposed shall be aligned with Schedule Plan Asked by Contractor
3 Equipment number stated is only reccomendation, Subcontractor shall supply enough equipment to fini
4 Other notes are included and provided on ITB as clarified on Technical Clarification
UANTITY
INA REFINERY (SGAR)
Unit Price Total Price Remarks
Rp 12,419,400,850.00
Rp 240,000,000.00
Rp 20,000,000.00 Rp 20,000,000.00
Rp 20,000,000.00 Rp 20,000,000.00
Rp 10,000,000.00 Rp 20,000,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp 150,000,000.00 Rp 150,000,000.00
Rp 20,000,000.00 Rp 20,000,000.00
Rp - Rp -
Rp 12,179,400,850.00 Rp 12,179,400,850.00
Rp 3,096,000,000.00
Rp 936,000,000.00
Rp 100,000,000.00
Rp 1,600,000,000.00
Rp 946,980,000.00
Rp 343,800,000.00
Rp 1,718,900,000.00
Rp 3,437,720,850.00
Rp 171,886,042,500.00
Rp 33,000.00 Rp -
Rp 121,000.00 Rp -
Rp 1,200,000.00 Rp 566,160,000.00
Rp 15,000.00 Rp 1,590,600,000.00
Rp 27,500.00 Rp 1,944,057,500.00
Rp 115,500.00 Rp -
Rp 230,000.00 Rp 6,661,950,000.00
Rp 1,000,000.00 Rp 1,998,000,000.00
Rp 3,600,000.00 Rp 120,628,800,000.00
Rp 9,000,000.00 Rp 37,728,000,000.00 Labor Only
Rp 8,500,000.00 Rp 93,075,000.00 Labor Only
Rp 100,000.00 Rp 675,400,000.00
Rp 184,305,443,350.00