LAPORAN HARIAN

PT. SAMWHAN

PROYEK : PT. TKG TAEKWANG CIREBON

PAKET PEKERJAAN : STRUKTUR, ARSITEKTUR DAN MEKANIKAL, ELEKTRIKAL & PLUMBING

TANGGAL : 11 MAY 2022

No. SPK : TANGGAL SPK : WAKTU PELAKSANAAN : HR


Sisa
KALENDER
: BERAKHIR TANGGAL :
VOLUME PEKERJAAN TENAGA KERJA KONTRAKTOR SAMWHAN PERALATAN UTAMA YANG DIGUNAKAN
LOKASI DAN KEGIATAN YANG DILAKSANAKAN
SATUAN RENCANA REALISASI KEAHLIAN JUMLAH JENIS ALAT SATUAN JUMLAH
Plant A 1 Project Manager 1 1. Grinda 4" Unit 5
Plester & Aci wall plant 2 Site Manager 1 2. Bor Unit 1
Install expanded metal 3 Engineering 1 3. Travo Las 180 A Unit 0
Install wall tile toilet 4 Drafter 0 4. Cutting Wheel Unit 1
Install pipe downspot 5 Logistic 2 5. Hammer 5kg + pahat beton Set 2
Painting internal dan external 6 QC Sipil 0 6. Gunting Baja Unit 1
Plant B 7 HSE 2 7. Mini Excavator Unit 1
Painting internal dan external 8 Surveyor 3 8. Bar Cutting Unit 1
Concrete Floor Compressor Room m3 16 16 9 Supervisor Sipil 4 9. Bar Bending Unit 1
Plant I 10 Security 4 10. Vibro Concrete Unit 3
- 11 Admin 0 11. Jet Water Unit 3
WWTP 12. Excavator PC200 Unit 4
Rebar, formwork top slab 18 13. Vibro Roller Unit 1
Eco Pond TENAGA KERJA LAPANGAN 14. Alat Pancang Unit 3
- 1 Temporary Facility 0 15. Dump Truck Unit 1
Clinic & Training Center 2 Pekerja Sipil 166 16. Pick Up Unit 1
Erection steel structure 3 Pekerja Baja 24
Ground Water Tank (GWT) 4 Pekerja Atap 0
Backfill 5 Operator Alat Berat 5
Waterproofing inside (wall & floor) 6 Cleaning Service 2
Road 7 Driver 1
Plant A-B: leveling & compacting
Plant B-C: wiremwsh & formwork 198
Plant A-Main Office: sand & gravel TENAGA KERJA MK MATERIAL YANG MASUK HARI INI
Sub Station KEAHLIAN JUMLAH NAMA BAHAN SATUAN JUMLAH
Plester & Aci wall 1 Team Leader Concrete K-300 m3 23
Canteen 2 Document Control 1 Concrete K-150 m3 5
Pouring concrete pedestal m3 2 2 3 Safety Officer 1
RMCC 4 Civil / Road Engineer + Qs Eng
Touch up painting 5 Struktur Engineering
Install hebel & roaster 6.Welding Engineering
Engineering Office 7. Mekanikal / Elektrikal Engineering
Lean concrete pile cap m3 5 5 8. Inspector Struktur / Arsitektur Alat YANG MASUK HARI INI
Security Office 9. Inspector Mekanikal / Elektrikal 1 NAMA ALAT SATUAN JUMLAH
Pouring concrete tie beam m3 5 5
Waste Segregation TOTAL TENAGA KERJA 3
Install u-ditch Lembur mulai jam : . . . . . . . . s/d jam . . . . . . . .
Drainage Mengetahui, Dilaporkan Oleh :
Canteen: install RCP D800 KEADAAN CUACA HARI INI PT. Wiratman Cipta Manggala PT. Samwhan
PAGI SIANG SORE
CERAH √
Pekerjaan dimulai jam : 07.00 s/d 16.00 MENDUNG √ √
HUJAN

Catatan : Kendala ( ) ( )
Team Leader Engineering
FOTO PROGRESS PEKERJAAN
PROYEK PABRIK PT. TKG TAEKWANG CIREBON
PT. SAMWHAN
TANGGAL : 11 MAY 2022

PLANT A (EXPANDED METAL) PLANT A (INSTALLATION PIPE DOWNSPOT)

PLANT B (CONCRETE FLOOR COMPRESSOR ROOM) PLANT B (PAINTING)

PLANT I CLINIC & TRAINING CENTER (ERECTION STEEL STRUCTURE)


FOTO PROGRESS PEKERJAAN
PROYEK PABRIK PT. TKG TAEKWANG CIREBON
PT. SAMWHAN
TANGGAL : 11 MAY 2022

ROAD PLANT A-B (COMPACTING) ROAD PLANT A-MAIN OFFICE (SAND & GRAVEL)

ROAD PLANT B-C (WIREMESH & FORMWORK) SUBSTATION (PLESTER & ACI WALL)

WWTP (RE-BAR & FORMWORK TOP SLAB) GROUND WATER TANK (BACKFILL)
FOTO PROGRESS PEKERJAAN
PROYEK PABRIK PT. TKG TAEKWANG CIREBON
PT. SAMWHAN
TANGGAL : 11 MAY 2022

SECURITY OFFICE (CONCRETE TIE BEAM) CANTEEN (PEDESTAL)

RMCC (HEBEL & ROASTER) WASTE SEGREGATION (U-DITCH)

DRAINAGE (CANTEEN) ENGINEERING OFFICE (LEAN CONCRETE PILE CAP)