Project : Jasa Dan Material Repair Fireprofing LTDC Date : 27 Maret 2023

Area : EDC Plant Prepared : PT. Peita Usaha Daefa

I. Activities Map

LTDC

II. Weather (Day Shift)


Times 07.30 08.30 09.30 10.30 11.30 12.30 13.30 14.30 15.30 16.30 17.30 - - Remark

Rainy Rainy Cloudy Sunny


Cloudy
Sunny x x x x x x x x x x
III. Manpower, Tools & Equipment
A. Man Power B. Tools & Equipment
Section Qty (MP) Remark Desc. Qty (Unit) Remark
SPV 1 Palu 3
Safety 1 Kunci Rachet 2
Admin 1 Kabel Power 3
Scafolding 1 Mesin Mixer 2
Tukang 2 Mesin Gerinda 4" 2
Skill 2 Body Harness 6
Helper 4 Jack Hammer 2
Driver 1
IV. Activities
Work Area : Week :
No Picture S/C
Location : LTDC Working Hours : 08.00 - 17.00
Detail Activities
Activities
No
Today Tomorrow
1 Dismantling of Pole Formwork in Cooling Water Area Finishing Pole Area Cooling Water
2 Wiremesh Coating For LTDC Poles Continued Burglary Check Anchor
3 Install 1 Pole LTDC Wiremesh Install ITDC / Pole Area Pole Formwork
4 Inspection of Anchor Area C061 There is still something in the hole Install the HTDC East Area Scaffolding Analyzer
5 Chemical Coating Floor Area T21
6
7
Manpower
Qty (MP)
No Position
Date 27 28 29 30 31 1 2
1 Supervisor 1
2 Safety 1
3 Scaffolder 1
4 Admin 1
5 Skill 2
6 Tukang 2
1
7 Helper 4
8 Driver 1
Tools & Equipment
Qty (MP)
No Desc
Date 27 28 29 30 31 1 2
1 Palu 3
2 Kunci Rachet 2
3 Kabel Power 3
4 Mesin Gerinda 4" 2
5 Body Harness 6
6 Jack Hammer 2
7 Mesin Mixer 2
Highlight
1
2
3

Prepared By: Check By : Approved By :

PT. Pelita Usaha Daefa Akmal M/Endriyan E. Riszki Ari/Raka Steven