Cloudy Sunny x x x x x x x x x x III. Manpower, Tools & Equipment A. Man Power B. Tools & Equipment Section Qty (MP) Remark Desc. Qty (Unit) Remark SPV 1 Palu 3 Safety 1 Kunci Rachet 2 Admin 1 Kabel Power 3 Scafolding 1 Mesin Mixer 2 Tukang 2 Mesin Gerinda 4" 2 Skill 2 Body Harness 6 Helper 4 Jack Hammer 2 Driver 1 IV. Activities Work Area : Week : No Picture S/C Location : LTDC Working Hours : 08.00 - 17.00 Detail Activities Activities No Today Tomorrow 1 Dismantling of Pole Formwork in Cooling Water Area Finishing Pole Area Cooling Water 2 Wiremesh Coating For LTDC Poles Continued Burglary Check Anchor 3 Install 1 Pole LTDC Wiremesh Install ITDC / Pole Area Pole Formwork 4 Inspection of Anchor Area C061 There is still something in the hole Install the HTDC East Area Scaffolding Analyzer 5 Chemical Coating Floor Area T21 6 7 Manpower Qty (MP) No Position Date 27 28 29 30 31 1 2 1 Supervisor 1 2 Safety 1 3 Scaffolder 1 4 Admin 1 5 Skill 2 6 Tukang 2 1 7 Helper 4 8 Driver 1 Tools & Equipment Qty (MP) No Desc Date 27 28 29 30 31 1 2 1 Palu 3 2 Kunci Rachet 2 3 Kabel Power 3 4 Mesin Gerinda 4" 2 5 Body Harness 6 6 Jack Hammer 2 7 Mesin Mixer 2 Highlight 1 2 3
Prepared By: Check By : Approved By :
PT. Pelita Usaha Daefa Akmal M/Endriyan E. Riszki Ari/Raka Steven