Daily Construction Report

Project Name: Date: 10.03.2017 Weather: Sunny Day


Developer: Report No.: 218 Day Sun wind Speed: 5 Wind Km/h
Client Representative: Total Project Duration Days: 597 High Temp: 32 Degree
Supervision Consultant: Duration Elapsed in Days 382 Low Temp: 38 Humidity
Contractor: Day Shif R Night Shif ¨ Work Stopped:

From: To:
FOR THE DAY PL. Next Cum.
ACTIVITY DESCRIPTION LOCATION Unit Total QTY % COMP
Planned Achieved day Achieved

Formworks first floor slab Zone 3 m2 2000 500 300 200 1200 60.0%
WORK PROGRESS

Formworks drop beams -1st flr Zone 3 m2


Post tension duct installation -1st flr Zone 3 nos
Plumbing sleeve installation -1st flr Zone 3 nos
Scaffolding erection for first flor slab Zone 2 m3
Formworks column - Grnd floor Zone 1 m2

MANPOWER EQUIPMENT

IN-DIRECT DIRECT DESCRIPTION Effective Idle Hours Contractor


Hrs
Project Manager 1 Carpenter 41 Shovel Bobcat 8 0 Asmael
Project Engineer - Mason 7 Generator 9 0 Asmael
MANPOWER & EQUIPMENT

Site Engineer (s) 2 Electrician - Jack Hammer 8 0 Asmael


Drafmans / CAD Operator 2 Plumber 4
Document Controller 1 Welder -
Officeboy / Timekeeper 1 Painter 2
Safety Officer (s) 2 Driver 1
Security 1 Steel Fixer 13
Foreman 2 Equipment Operator 1
Storekeeper 1
Unskilled Labor 3
SUB-TOTAL 12 73
TOTAL PAX 85
TARGET PL. Next Cum.
ACTIVITY DESCRIPTION LOCATION Unit Total QTY % COMP
Planned Achieved day Achieved
ANTICIPATED ACTIVITIES &

Formworks first floor slab Zone 3 500 300 200 1200 60.0%
STARTED ACTIVITIES

m2 2000
Formworks drop beams -1st flr Zone 3 m2
Post tension duct installation -1st flr Zone 3 nos
Plumbing sleeve installation -1st flr Zone 3 nos
Scaffolding erection for first flor slab Zone 2 m3
Formworks column - Grnd floor Zone 1 m2

Raised Days Delay WORK AFFECTED PLAN START


CRITICAL / CONCERN

1. Change of beam dimension design and additional drop beams


21-Sep-17 -42999 Concrete pouring of first floor slab at Zone 3 4-Oct-17
(REF: F0849/2020-F/2017)
ISSUES

2. MEP final design drawings including HVAC opening in slab


26-Jul-17 -42942
(REF: F0683/2020-F/2017)

Prepared By Initiated by Contractor Verified by (Engineer) Concurred by (Client)

JM JM Project Manager